Quantcast

Sooner State News

Sunday, May 5, 2024

July 26: Congressional Record publishes “Text of Senate Amendment 1056” in the Senate section

5edited

James M. Inhofe was mentioned in Text of Senate Amendment 1056 on pages S3644-S3665 covering the 1st Session of the 118th Congress published on July 26 in the Congressional Record.

The publication is reproduced in full below:

SA 1056. Mr. WICKER (for himself and Mr. Graham) submitted an amendment intended to be proposed by him to the bill S. 2226, to authorize appropriations for fiscal year 2024 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows:

At the appropriate place in the funding tables, insert the following to raise the topline for implementation of the National Defense Strategy and for other purposes:

--------------------------------------------------------------------------------------------------------------------------------------------------------

FY24 AMT

ACCOUNT LINE PE SAG ($1000S) TITLE/STUB ENTRY UFR?

--------------------------------------------------------------------------------------------------------------------------------------------------------

MSLS................................... 6 .......................... ........... $314.2 PrSM (Inc 1) production ..............

increase.

AMMO................................... 36 .......................... ........... $20.0 M795 155mm artillery ..............

projectile production.

RDA.................................... ........... 0604802A.................. ........... $20.0 Low-drag artillery ..............

guidance kit (XM1210 LR

PGK).

MSLS................................... 20 .......................... ........... $20.0 SB600 production increase ..............

PDW.................................... 78 .......................... ........... $10.9 Marinized SB600.......... ..............

MSLS................................... 17 .......................... ........... $350.0 Additional 1 Patriot fire ..............

unit.

RDDW................................... ........... 0603881C.................. ........... $108.0 All Domain Missile ..............

Warning and Missile

Tracking Architecture

(THAAD).

MSLS................................... 10 .......................... ........... $36.0 JAGM capacity expansion.. ..............

RDA.................................... ........... 02065778A................. ........... $67.0 GMLRS-ER capacity ..............

expansion.

RDA.................................... ........... 0604611A.................. ........... $29.1 Javelin RDTE for F-model ..............

auto gate/fast launch.

MSLS................................... 22 .......................... ........... $87.6 Stinger capacity ..............

expansion--obsolescence.

PANMC.................................. 15 .......................... ........... $350.0 Coyote production ..............

increase.

RDA.................................... ........... 1160402BB................. ........... $27.3 Palletized Field ..............

Artillery Launcher.

RDN.................................... ........... 0604227N.................. ........... $50.0 Harpoon--seeker ..............

development obsolescence

issues.

WPN.................................... 23 .......................... ........... $20.0 Harpoon--additional test ..............

equipment for production

and missile recert.

WPN.................................... 20 .......................... ........... $152.0 AARGM-ER production ..............

increase.

WPN.................................... 20 .......................... ........... $34.0 AARGM-ER special test ..............

equipment.

WPN.................................... 16 .......................... ........... $40.0 NSM production increase.. ..............

WPN.................................... 7 .......................... ........... $180.0 SM-6 obsolescence ..............

steering & control.

WPN.................................... 7 .......................... ........... $30.0 SM-6 obsolescence Plate ..............

3A.

WPN.................................... 4 .......................... ........... $20.0 Tomahawk BlkV throughput ..............

expansion.

PDW.................................... 33 .......................... ........... $63.0 SM-3 Block IIA capacity ..............

expansion.

PDW.................................... 33 .......................... ........... $140.0 SM-3 Block IIA ..............

obsolescence.

WPN.................................... 27 .......................... ........... $65.0 Mk48 Mod 7 AUR and ..............

Technology Expansion

Program.

WPN.................................... 27 .......................... ........... $40.0 Mk48 Mod 7 further ..............

obsolescence fixes.

WPN.................................... 29 .......................... ........... $121.1 Mk54 Mod 1 kit........... ..............

WPN.................................... 29 .......................... ........... $18.6 Mk54 HAAWC kit........... ..............

WPN.................................... 31 .......................... ........... $10.0 Indian Head explosive ..............

fill production

expansion.

RDN.................................... ........... 0604601N.................. ........... $10.0 Indian Head underwater ..............

fill testing/quals

completion.

RDN.................................... ........... 0604601N.................. ........... $15.0 Hammerhead capability.... ..............

RDN.................................... ........... 9999...................... ........... $60.0 Classified program....... ..............

WPN.................................... 31 .......................... ........... $7.5 Mk68..................... ..............

WPN.................................... 31 .......................... ........... $0.4 Mk68 obsolescence........ ..............

RDN.................................... ........... 0603782N.................. ........... $10.0 ONR capability ..............

acceleration.

RDN.................................... 51 0603582N.................. ........... $19.6 PAC-3 MSE/Aegis ..............

integration.

MPAF................................... 16 .......................... ........... $217.3 GLSDB risk mitigation of ..............

current GFE--sensor/

shooter.

MPAF................................... 8 .......................... ........... $160.0 Joint Strike Missile ..............

production increase and

test equipment.

MPAF................................... 12 .......................... ........... $20.0 AMRAAM AP................ ..............

WPN.................................... 6 .......................... ........... $60.0 AIM-9X capacity expansion ..............

WPN.................................... 6 .......................... ........... $130.0 AIM-9X production ..............

increase (Navy).

MPAF................................... 6 .......................... ........... $130.0 AIM-9X production ..............

increase (AF).

MPAF................................... 9 .......................... ........... $35.0 SDB II capacity expansion ..............

to 2100.

MPAF................................... 9 .......................... ........... $70.0 SDB II capacity expansion ..............

to 3000.

OPN.................................... 63 .......................... ........... $100.0 Phoenix Ghost CP200...... ..............

WPN.................................... 22 .......................... ........... $38.0 ABL energetics expansion ..............

(GMLRS, PrSM, PAC-3,

etc).

WPN.................................... 23 .......................... ........... $125.0 Expansion of solid rocket ..............

motor industrial base.

RDDW................................... ........... 0602000D8Z................ ........... $35.0 CL-20.................... ..............

MPAF................................... 0708011F .......................... ........... $150.0 Defense Industrial Base ..............

(DIB) Expansion for.

Industrial Preparedness/

Pollution Prevention AFP-

44.

RDDW................................... ........... 0605022D8Z................ ........... $15.0 Defense exportability ..............

features.

RDAF................................... ........... 0604183F.................. ........... $133.4 HACM acceleration........ ..............

RDN.................................... ........... 0605518N.................. ........... $25.0 Mach-TB increase......... ..............

RDDW................................... ........... 0603766E.................. ........... $120.0 Assault Breaker II 4x LOE ..............

acceleration.

RDSF................................... 9999 .......................... ........... $20.0 Classified space add..... ..............

RDSF................................... ........... 1206310SF................. ........... $30.0 Narrowband antenna on- ..............

orbit demonstration.

RDSF................................... ........... 1206616SF................. ........... $70.0 Cislunar space domain ..............

awareness.

PSF.................................... 22 .......................... ........... $108.0 One additional space ..............

launch.

RDDW................................... ........... 0603133D8Z................ ........... $25.0 Foreign Comparative ..............

Testing.

RDDW................................... ........... 0604250D8Z................ ........... $46.0 Maintain SCO level of ..............

effort.

RDDW................................... ........... 0601101E.................. ........... $25.0 NSCAI generative AI...... ..............

RDDW................................... ........... 0602303E.................. ........... $50.0 NSCAI generative AI...... ..............

RDDW................................... ........... 0601101E.................. ........... $16.5 NSCAI AI for Cyber....... ..............

RDDW................................... ........... 0602303E.................. ........... $42.9 NSCAI AI for Cyber....... ..............

RDDW................................... ........... 0603760E.................. ........... $6.6 NSCAI AI for Cyber....... ..............

OMDW................................... ........... .......................... DS1 $200.0 National Defense ..............

Stockpile Transaction

Fund increase.

RDDW................................... ........... 0901579D8Z................ ........... $(30.0) Transfer to pilot ..............

program--Protecting

Access to Critical

Assets.

RDDW................................... ........... 0901579D8Z................ ........... $30.0 Transfer from Office of ..............

Strategic Capital for

pilot program on

Protecting Access to

Critical Assets.

RDDW................................... ........... 0604250D8Z................ ........... $25.0 Pele microreactor........ ..............

RDA.................................... ........... 0603119A.................. ........... $2.8 Contested Logistics: ..............

Autonomous Self

Perception Combat

Engineer Program (ASCEP).

RDDW................................... ........... 0603896C.................. ........... $19.0 Ballistic Missile Defense ..............

C2BMC (MD01).

4701................................... ........... 18-D-650.................. ........... $73.3 Tritium Finishing ..............

Facility, SRS.

4701................................... ........... .......................... ........... $28.1 B83 Stockpile Systems.... ..............

4701................................... ........... .......................... ........... $341.8 Savannah River Pit ..............

Production.

MILCON................................. ........... .......................... ........... $695.0 FY25 UFRs (for display ..............

purposes--text below).

MILCON................................. ........... .......................... ........... $1,691.0 FY24 MILCON UFRs (for ..............

display purposes--text

below).

OMA.................................... ........... .......................... 132 $1,652.0 Army FSRM to 100%........ ..............

OMN.................................... ........... .......................... BSM1 $650.0 Navy FSRM to 100%........ ..............

OMMC................................... ........... .......................... BSM1 $1,415.0 Marine Corps FSRM to 100% ..............

OMARNG................................. ........... .......................... 011R $1,375.0 Air Force FSRM to 100%... ..............

OMDW................................... ........... .......................... 4GTM $65.0 Defense Community ..............

Infrastructure Program.

OMAF................................... ........... .......................... 42A $2.0 Program increase for ..............

operational energy.

OMDW................................... UNDIS .......................... ........... $1,200.0 Fuel price increases ..............

(FY23 + Fy24).

SCN.................................... 10 .......................... ........... $928.0 DDG-51 prior-year CTC.... ..............

SCN.................................... 11 .......................... ........... $300.0 Surface ship supplier ..............

base.

SCN.................................... 11 .......................... ........... $280.0 DDG-51 AP................

APN.................................... 62 .......................... ........... $132.0 F-35B/C engine spares.... ..............

APN.................................... 6 .......................... ........... $250.0 FD2030--CH-53K +1 a/c.... ..............

RDN.................................... ........... 0603207N.................. ........... $10.0 Task Force 59 long- ..............

endurance USV

experimentation.

RDAF................................... ........... 0207138F.................. ........... $35.0 F-22 open system ..............

architecture for CCA.

OPAF................................... 9999 .......................... ........... $200.0 Classified program....... ..............

OPAF................................... 9999 .......................... ........... $150.0 Classified program....... ..............

RDN.................................... ........... 0604378N.................. ........... $22.5 Stratospheric balloon ..............

research--JTRS.

OPAF................................... 9999 .......................... ........... $40.0 Classified program....... ..............

APN.................................... 56 .......................... ........... $72.6 NGJ +2 additional ..............

shipsets.

OMAF................................... ........... .......................... MULTIPLE $470.3 F-22 WSS (prevent ..............

divestment).

APAF................................... 11 .......................... ........... $240.0 MH-139A.................. ..............

RDAF................................... ........... 0207110F.................. ........... $50.0 Next-Gen Advanced ..............

Propulsion.

APAF................................... 3 .......................... ........... $618.3 F-35A test jets (6 a/c).. ..............

RDAF................................... ........... 0207253F.................. ........... $49.0 Compass Call RDTE sim.... ..............

RDAF................................... ........... 0207133F.................. ........... $49.1 Advanced F-16 EW ..............

protection/attack.

APAF................................... ........... 26........................ ........... $130.5 Advanced F-16 EW ..............

protection/attack.

OPA.................................... 71 .......................... ........... $68.5 ENVG-B................... ..............

OMDW................................... ........... .......................... 1FU1 $15.0 JTF-N.................... ..............

RDDW................................... ........... 63375D8Z.................. ........... $30.0 Directed Energy Threat ..............

Research.

RDDW................................... ........... 33140D8Z.................. ........... 20.0 NSA Cyber Workforce Pilot ..............

Program.

OMARNG................................. ........... .......................... 153 $12.0 Army National Guard ..............

Mission Assurance

Program.

RDDW................................... ........... 9999...................... ........... $17.0 All-domain Anomaly ..............

Resolution Office.

RDN.................................... ........... 0604558N.................. ........... $7.0 Advanced Submarine ..............

Control Using Precision

Maneuvering Unit.

OMDW................................... ........... .......................... 012D $10.0 Southeast Asia Cyber ..............

Pilot Expansion.

OMARNG................................. ........... .......................... 121 $21.5 Exercise Northern Strike. ..............

PMC.................................... 40 .......................... ........... $26.0 Low cost unmanned ..............

aerospace vehicle (PAACK-

P).

OPA.................................... 86 .......................... ........... $77.0 IBCS--integration Army #1

acceleration for

INDOPACOM.

MSLS................................... 3 .......................... ........... $22.7 M-SHORAD Increment 1-- Army #2

expand capacity of

existing batteries.

OPA.................................... 60 .......................... ........... $81.2 Trojan SPIRIT............ Army #3

OMA.................................... ........... .......................... 121 $102.5 Expanding INDOPACOM Army #6

Campaigning Activities.

AMMO................................... 36 .......................... ........... 21.5 Water intake pump Army #10

upgades, Radford AAP.

RDA.................................... ........... 0604804A.................. ........... $21.2 Maneuver support vessel Army #11

(heavy).

ACFT................................... 8 .......................... ........... $62.1 Black Hawk (HH-60M) Army #25

replacement--MEDEVAC.

RDN.................................... ........... 0604038N.................. ........... $45.3 Maritime Targeting Cell Navy #1

Afloat (MTC-A)

Development.

RDN.................................... ........... 0604234N.................. ........... $249.3 Fund E-2D Theater Combat Navy #2

ID and HECTR.

OPN.................................... 16 .......................... ........... $61.9 Fund ZEUS for DDG-1000 Navy #3

Class.

RDN.................................... ........... 0204202N.................. ........... $124.5 Fund ZEUS for DDG-1000 Navy #3

Class.

OMN.................................... ........... .......................... 1C1C $4.0 VIOLET................... Navy #4

OPN.................................... 78 .......................... ........... $1.2 VIOLET................... Navy #4

RDN.................................... ........... 0101402N.................. ........... $20.4 VIOLET................... Navy #4

OMN.................................... ........... .......................... BSM1 $300.0 Dry Dock Repairs at PSNS Navy #5

Investment.

Restoration and

Modernization (RM).

OMN.................................... ........... .......................... BSM1 $250.0 Targeted Facilities Navy #6

Sustainment, Restoration

and.

Modernization (FSRM)

Investment.

OMN.................................... ........... .......................... BSM1 $300.0 Targeted Facilities Navy #6

Sustainment, Restoration

and.

Modernization (FSRM)

Investment.

SCN.................................... 32 .......................... ........... $208.1 DDG-51 SEWIP Blk III (DDG Navy #7

136-137).

SCN.................................... 3 .......................... ........... $170.0 CVN 75 and CVN 80 SEWIP Navy #8

Blk III.

SCN.................................... 7 .......................... ........... $94.0 CVN 75 and CVN 80 SEWIP Navy #8

Blk III.

APN.................................... 15 .......................... ........... $118.8 Navy Unique Fleet Navy #9

Essential Airlift

Logistics KC-130J (+1 A/

C Reserve).

APN.................................... 62 .......................... ........... $93.0 CH-53K Initial and USMC #2

Outfitting Spares.

PMC.................................... 43 .......................... ........... $21.1 Project 7/11--Modular USMC #3

Operations Cells.

APN.................................... 16 .......................... ........... $252.9 (+2) KC-130J Aircraft and USMC #4

Initial Spares.

PMC.................................... 25 .......................... ........... $5.1 Distributed Common Ground/ USMC #5

Surface System-.

Marine Corps (DCGS-MC)

All-.

Source SCI Workstations..

Family of Field Medical

Equipment (FFME).

PMC.................................... 50 .......................... ........... $11.0 Damage Control USMC #6

Resuscitation.

(DCR) and Damage Control

Surgery (DCS).

Equipment Sets...........

PMC.................................... 19 .......................... ........... $160.0 (+4) AN/TPS-80 G/ATOR USMC #7

Radar.

RDN.................................... ........... 0206313M.................. ........... $16.3 Satellite Communications USMC #8

Terminal, Network-on-.

the-Move (NOTM)..........

Digital Interoperability

(DI)--Marine Agile.

RDN.................................... ........... 0605217N.................. ........... $78.5 Network Gateway Link USMC #11

(MANGL) Roll-Up.

PMC.................................... 54 .......................... ........... $21.0 Ultra-Light-Weight USMC #12

Camouflage Netting

System (ULCANS).

PMC.................................... 17 .......................... ........... $5.1 Joint All Domain Command USMC #13

and Control (JADC2)

Testing, Evaluation and

Engineering Environment.

APN.................................... 68 .......................... ........... $122.4 (+4) F-35B Engine/Lift USMC #14

System USMC Spares.

PMC.................................... 48 .......................... ........... $8.0 Demolition Equipment Set, USMC #19

Squad.

Engineer/Explosive Hazard

Defeat Systems.

APN.................................... 68 .......................... ........... $67.5 (+3) UC-12W(ER) USMC #20

Beechcraft King Air

350ER with Cargo Door

and Initial Spares.

PMC.................................... 52 .......................... ........... $10.0 Multi-Terrain Loader-- USMC #21

Replacement.

APAF................................... 52 .......................... ........... $596.2 Accelerate E-7 delivery.. AF #1

RDAF................................... ........... 0604007F.................. ........... $37.2 Accelerate E-7 delivery.. AF #1

OMAF................................... ........... .......................... 012C $0.7 (OI-3) Fund ISR Digital AF #4

Infrastructure.

OMAF................................... ........... .......................... 012C $58.6 (OI-3) Fund ISR Digital AF #4

Infrastructure.

RDAF................................... ........... 0207431F.................. ........... $1.2 (OI-3) Fund ISR Digital AF #4

Infrastructure.

RDAF................................... ........... 0207431F.................. ........... $13.8 (OI-3) Fund ISR Digital AF #4

Infrastructure.

RDAF................................... ........... 0207431F.................. $6.2 (OI-3) Fund AF #4....................

ISR Digital

Infrastructure

RDAF................................... ........... 0207431F.................. ........... $5.9 (OI-3) Fund ISR Digital AF #4

Infrastructure.

RDAF................................... 66 .......................... ........... $15.9 (OI-3) Fund ISR Digital AF #4

Infrastructure.

OPAF................................... ........... 0305208F.................. ........... $5.0 (OI-3) Fund ISR Digital AF #4

Infrastructure.

RDAF................................... ........... .......................... ........... $10.6 (OI-3) Fund ISR Digital AF #4

Infrastructure.

OMAF................................... ........... 9999...................... 011C $12.1 (OI-3) Fund ISR Digital USSF #3

Infrastructure.

RDSF................................... ........... 9999...................... ........... $13.0 Classified Program D..... USSF #4

RDSF................................... ........... 9999...................... ........... $105.0 Classified Program E..... USSF #5

RDSF................................... ........... 9999...................... ........... $90.0 Classified Program F..... USSF #6

RDSF................................... 56 1203040SF................. ........... $43.0 DCO-S.................... USSF #7

RDDW................................... ........... 0604181C.................. ........... $298.0 Glide Phase Interceptor.. MDA #3

RDDW................................... ........... 0603891C.................. ........... 22.9 Classified Program A/ MDA #1

Novel countermeasure

against hypersonic

threats.

RDDW................................... ........... 0603906C.................. ........... $15.0 Classified Program B..... MDA #2

RDDW................................... ........... 0603914C.................. ........... $34.7 Pacific Collector/Pacific MDA #7

Tracker Replacement.

Planning & Engineering...

RDDW................................... ........... 0603914C.................. ........... $315.3 Pacific Collector MDA #8

Replacement.

RDDW................................... ........... 0603891C.................. ........... $32.2 Left Through Right of MDA #4

Launch Integration/

Antenna, software

development & C2BMC

integration.

RDDW................................... ........... 0603890C.................. ........... $12.4 Electronic Attack/ MDA #6

Electronic Protection.

RDDW................................... ........... 0603891C.................. ........... $27.3 Electronic Warfare for MDA #9

Missile Defense.

OPN.................................... 126 .......................... ........... $36.9 Somalia presistent AFRICOM #1

presence.

OMA.................................... ........... .......................... 411 $95.3 Contract ISR............. AFRICOM #2

OMA.................................... ........... .......................... 411 $2.1 Contract ISR............. AFRICOM #2

OMA.................................... ........... .......................... 411 $4.7 Contract ISR............. AFRICOM #2

RDA.................................... ........... 0603766A.................. ........... $14.7 Air Vigilance O&S........ CENTCOM #1

RDAF................................... ........... 0207247F.................. ........... $15.0 AF TENCAP Crestone CENTCOM #1

Database.

OMAF................................... ........... .......................... 015F $16.0 GPN-CENT................. CENTCOM #2

OMAF................................... ........... .......................... 015F $8.0 Data analysis and AI CENTCOM #3

initiative.

OMAF................................... ........... .......................... 015F $34.0 MSS licenses............. CENTCOM #3

OMAF................................... ........... .......................... 015F $30.0 Cloud transition......... CENTCOM #3

........... 0303055F.................. 011Z $81.2 European Communications EUCOM #1

Infrastructure.

........... 0207522F.................. 012C $78.3 Air Based Air Defense.... EUCOM #2

RDDW................................... ........... 0604331D8Z................ ........... $174.0 Joint Fires Network (JFN) INDOPACOM #1

RDDW................................... ........... 0604102C.................. ........... $147.0 Guam Defense System...... INDOPACOM #2

OMAF................................... ........... .......................... 011C $90.0 INDOPACOM Campaigning.... INDOPACOM #5

OMMC................................... ........... .......................... 1A1A $8.0 INDOPACOM Campaigning.... INDOPACOM #5

OMN.................................... ........... .......................... 1CCM $36.0 INDOPACOM Campaigning.... INDOPACOM #5

OMN.................................... ........... .......................... 1CCM $49.0 Joint Training Team...... INDOPACOM #9

OMN.................................... ........... .......................... 1CCM $25.5 Joint Task Force INDOPACOM #10

Micronesia.

RDDW................................... ........... 0604331D8Z................ ........... $10.0 Joint Experimentation and INDOPACOM #12

Innovation.

OMN.................................... ........... .......................... 1CCM $9.0 Joint Experimentation and INDOPACOM #12

Innovation.

OPN.................................... 43 .......................... ........... $117.0 Persistent Targeting for INDOPACOM #17

Undersea.

OMN.................................... ........... .......................... 1CCM $9.0 Joint Task Force Indo- INDOPACOM #24

Pacific (JTF-IP).

OMN.................................... ........... .......................... 1CCM $5.0 Headquarters Manpower INDOPACOM #26

Enhancements.

OMDW................................... ........... .......................... 8PLI $69.9 Joint Training, Exercise INDOPACOM #27

and Evaluation Program.

(JTEEP)..................

RDAF................................... ........... 0604617F.................. ........... $4.5 Arctic capable prepo NORTHCOM #1

shelters.

RDAF................................... ........... 0604617F.................. ........... $5.5 Arctic capable prepo NORTHCOM #1

shelters.

OMAF................................... ........... .......................... 015C $5.2 Counter strategic NORTHCOM #2

competitors in Western

Hemisphere.

RDAF................................... ........... 0604617F.................. ........... $1.0 Arctic campaigning....... NORTHCOM #3

RDAF................................... ........... 0604617F.................. ........... $6.0 Arctic campaigning....... NORTHCOM #3

RDAF................................... ........... 0102417F.................. ........... $55.0 OTH-R capability NORTHCOM #4

acceleration.

RDAF................................... ........... 0102326F.................. ........... $9.8 Domain awareness tech dev NORTHCOM #5

RDAF................................... ........... 01002412F................. ........... $27.0 ARCHER................... NORTHCOM #6

OPAF................................... 22 .......................... ........... $211.5 3DELLR................... NORTHCOM #7

RDAF................................... ........... 0102326F.................. ........... $4.2 HDCS..................... NORTHCOM #8

RDAF................................... ........... 0102326F.................. ........... $33.2 ERSA..................... NORTHCOM #9

RDAF................................... ........... 0201130F.................. ........... $13.9 Core tech investment..... NORTHCOM #10

O&M, DW................................ ........... .......................... 1PL7 $31.1 Counter Uncrewed Aerial SOCOM

Systems (CUAS) Group.

3 Defeat Acceleration....

PROC, DW............................... 75 .......................... ........... $9.3 Counter Uncrewed Aerial SOCOM

Systems (CUAS) Group.

3 Defeat Acceleration....

OMMC................................... ........... .......................... 1A1A $9.9 Global Prepositioning SOUTHCOM #22

Network (GPN) Concept.

RDSF................................... ........... 9999...................... ........... $143.0 SPACECOM classified SPACECOM #3

program.

RDSF................................... ........... 9999...................... ........... $127.0 SPACECOM classified SPACECOM #5

program.

RDSF................................... ........... 9999...................... ........... $68.0 SPACECOM classified SPACECOM #6

program.

OMAF................................... ........... .......................... 015X $20.0 Space warfighting terrain SPACECOM #7

$ 24,969.4

----------------

--------------------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------------------

FY 2024 Senate Senate

Account State/Country Installation Project Title Request Change Authorized

--------------------------------------------------------------------------------------------------------------------------------------------------------

MILITARY CONSTRUCTION

ARMY

Army............................... Alabama................. Anniston Army Depot.... OPEN STORAGE (P&D)..... 0 270 270

Army............................... Alabama................. Redstone Arsenal....... SUBSTATION............. 50,000 0 50,000

Army............................... Alaska.................. Fort Wainwright........ COST TO COMPLETE: 34,000 0 34,000

ENLISTED UNACCOMPANIED

PERS HSG.

Army............................... Alaska.................. Fort Wainwright........ SOLDER PERFORMANCE 0 7,900 7,900

READINESS CENTER (P&D).

Army............................... Florida................. Eglin Air Force Base... BARRACKS............... 0 75,000 75,000

Army............................... Georgia................. Hunter Army Airfield... AIRCRAFT MAINTENANCE 0 9,900 9,900

HANGAR (P&D).

Army............................... Georgia................. Fort Eisenhower........ CYBER INSTRUCTIONAL 163,000 -90,000 73,000

FACILITY (CLASSROOMS).

Army............................... Germany................. Grafenwoehr............ AUTOMATED MULTIPURPOSE 10,400 0 10,400

MACHINE GUN RANGE.

Army............................... Germany................. Hohenfels.............. SIMULATIONS CENTER..... 56,000 0 56,000

Army............................... Germany................. Pulaski Barracks....... CHILD DEVELOPMENT 0 25,000 25,000

CENTER.

Army............................... Hawaii.................. Aliamanu Military WATER STORAGE TANK..... 20,000 0 20,000

Reservation.

Army............................... Hawaii.................. Fort Shafter........... CLEARWELL AND BOOSTER 0 23,000 23,000

PUMP.

Army............................... Hawaii.................. Helemano Military WELLS AND STORAGE TANK. 0 33,000 33,000

Reservation.

Army............................... Hawaii.................. Schofield Barracks..... ELEVATED TANK AND 0 21,000 21,000

DISTRIBUTION LINE.

Army............................... Hawaii.................. Schofield Barracks..... WATER STORAGE TANK..... 0 16,000 16,000

Army............................... Hawaii.................. Wheeler Army Airfield.. AIR TRAFFIC CONTROL 0 5,400 5,400

TOWER (P&D).

Army............................... Indiana................. Crane Army Ammunition EARTH COVERED MAGAZINES 0 1,195 1,195

Plant. (P&D).

Army............................... Illinois................ Rock Island Arsenal.... CHILD DEVELOPMENT 0 44,000 44,000

CENTER ADDITION.

Army............................... Kansas.................. Fort Riley............. AIR TRAFFIC CONTROL 0 1,600 1,600

TOWER (P&D).

Army............................... Kansas.................. Fort Riley............. AIRCRAFT MAINTENANCE 105,000 0 105,000

HANGER.

Army............................... Kentucky................ Blue Grass Army Depot.. SMALL ARMS 0 3,300 3,300

MODERNIZATION (P&D).

Army............................... Kentucky................ Fort Campbell.......... AIR TRAFFIC CONTROL 0 2,500 2,500

TOWER (P&D).

Army............................... Kentucky................ Fort Campbell.......... MULTIPURPOSE TRAINING 38,000 0 38,000

RANGE.

Army............................... Kentucky................ Fort Knox.............. MIDDLE SCHOOL ADDITION 0 6,600 6,600

(P&D).

Army............................... Kwajalein............... Kwajalein Atoll........ COST TO COMPLETE: PIER. 0 15,000 15,000

Army............................... Louisiana............... Fort Johnson........... BARRACKS............... 0 106,000 106,000

Army............................... Louisiana............... Fort Johnson........... MULTIPURPOSE ATHLETIC 0 13,400 13,400

FIELD.

Army............................... Maryland................ Fort Meade............. CHILD DEVELOPMENT 0 50,000 50,000

CENTER.

Army............................... Massachusetts........... Soldier Systems Center BARRACKS ADDITION...... 18,500 0 18,500

Natick.

Army............................... Michigan................ Detroit Arsenal........ GROUND TRANSPORT 72,000 0 72,000

EQUIPMENT BUILDING.

Army............................... New Mexico.............. White Sands Missile J-DETC DIRECTED ENERGY 0 5,500 5,500

Range. FACILITY (P&D).

Army............................... New York................ Fort Hamilton.......... CHILD DEVELOPMENT 0 25,000 25,000

CENTER.

Army............................... New York................ Watervliet Arsenal..... TANK FARM (P&D)........ 0 160 160

Army............................... North Carolina.......... Fort Liberty........... AUTOMATED RECORD FIRE 19,500 0 19,500

RANGE.

Army............................... North Carolina.......... Fort Liberty........... BARRACKS............... 50,000 0 50,000

Army............................... North Carolina.......... Fort Liberty........... BARRACKS (FACILITY 85,000 0 85,000

PROTOTYPING).

Army............................... North Carolina.......... Fort Liberty........... CHILD DEVELOPMENT 0 39,000 39,000

CENTER.

Army............................... Oklahoma................ McAlester Army WATER TREATMENT PLANT 0 1,194 1,194

Ammunition Plant. (P&D).

Army............................... Pennsylvania............ Letterkenny Army Depot. ANECHOIC CHAMBER (P&D). 0 275 275

Army............................... Pennsylvania............ Letterkenny Army Depot. GUIDED MISSILE 89,000 0 89,000

MAINTENANCE BUILDING.

Army............................... Pennsylvania............ Tobyhanna Army Depot... HELIPAD (P&D).......... 0 311 311

Army............................... Pennsylvania............ Tobyhanna Army Depot... RADAR MAINTENANCE SHOP 0 259 259

(P&D).

Army............................... Poland.................. Various Locations...... PLANNING & DESIGN...... 0 25,710 25,710

Army............................... South Carolina.......... Fort Jackson........... CHILD DEVELOPMENT 0 41,000 41,000

CENTER.

Army............................... South Carolina.......... Fort Jackson........... COST TO COMPLETE: 0 66,000 66,000

RECEPTION BARRACKS

COMPLEX, PHASE 2.

Army............................... Texas................... Fort Bliss............. RAIL YARD.............. 74,000 0 74,000

Army............................... Texas................... Fort Cavazos........... BARRACKS (P&D)......... 0 20,000 20,000

Army............................... Texas................... Fort Cavazos........... TACTICAL EQUIPMENT 0 5,800 5,800

MAINTENANCE FACILITIES

(P&D).

Army............................... Texas................... Red River Army Depot... COMPONENT REBUILD SHOP. 113,000 -66,600 46,400

Army............................... Texas................... Red River Army Depot... NON-DESTRUCTIVE TESTING 0 280 280

FACILITY (P&D).

Army............................... Texas................... Red River Army Depot... STANDBY GENERATOR (P&D) 0 270 270

Army............................... Virginia................ Fort Belvoir........... EQUINE TRAINING 0 4,000 4,000

FACILITY (P&D).

Army............................... Virginia................ Fort Belvoir........... EQUINE FACILITY........ 0 40,000 40,000

Army............................... Virginia................ Joint Base Myer- BARRACKS............... 0 177,000 177,000

Henderson Hall.

Army............................... Washington.............. Joint Base Lewis- BARRACKS............... 100,000 0 100,000

McChord.

Army............................... Washington.............. Joint Base Lewis- VEHICLE MAINTENANCE 0 7,500 7,500

McChord. SHOP (P&D).

Army............................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 50,000 50,000

FUND.

Army............................... Worldwide Unspecified... Unspecified Worldwide HOST NATION SUPPORT.... 26,000 0 26,000

Locations.

Army............................... Worldwide Unspecified... Unspecified Worldwide MINOR CONSTRUCTION..... 76,280 0 76,280

Locations.

Army............................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 270,875 0 270,875

Locations.

Subtotal Military 1,470,555 812,724 2,283,279

Construction, Army.

--------------------------

NAVY

Navy............................... Australia............... Royal Australian Air PDI: AIRCRAFT PARKING 134,624 0 134,624

Force Base Darwin. APRON (INC).

Navy............................... California.............. Marine Corps Air Ground COMMUNICATIONS TOWERS.. 42,100 0 42,100

Combat Center

Twentynine Palms.

Navy............................... California.............. Marine Corps Base Camp FIRE/EMERGENCY RESPONSE 0 26,825 26,825

Pendleton. STATION (53 AREA)

REPLACEMENT.

Navy............................... California.............. Port Hueneme........... LABORATORY COMPOUND 110,000 -95,000 15,000

FACILITIES

IMPROVEMENTS.

Navy............................... Connecticut............. Naval Submarine Base SUBMARINE PIER 31 112,518 -75,800 36,718

New London. EXTENSION.

Navy............................... Connecticut............. Naval Submarine Base WEAPONS MAGAZINE & 219,200 -200,000 19,200

New London. ORDNANCE OPERATIONS

FAC..

Navy............................... District Of Columbia.... Marine Barracks BACHELOR ENLISTED 131,800 -115,000 16,800

Washington. QUARTERS & SUPPORT

FACILITY.

Navy............................... District of Columbia.... Naval Support Activity. ELECTROMAGNETIC & CYBER 0 40,000 40,000

COUNTERMEASURES LAB

(P&D).

Navy............................... Djibouti................ Camp Lemonnier......... ELECTRICAL POWER PLANT. 0 20,000 20,000

Navy............................... Florida................. Naval Air Station AHTS HANGAR............ 0 50,000 50,000

Whiting Field.

Navy............................... Georgia................. Marine Corps Logistics CONSOLIDATED 0 63,970 63,970

Base Albany. COMMUNICATION FACILITY.

Navy............................... Guam.................... Andersen Air Force Base PDI: CHILD DEVELOPMENT 105,220 -50,000 55,220

CENTER.

Navy............................... Guam.................... Andersen Air Force Base PDI: JOINT CONSOL. 107,000 0 107,000

COMM. CENTER (INC).

Navy............................... Guam.................... Joint Region Marianas.. PDI: JOINT 292,830 -261,500 31,330

COMMUNICATION UPGRADE

(INC).

Navy............................... Guam.................... Joint Region Marianas.. PDI: MISSILE 174,540 -130,000 44,540

INTEGRATION TEST

FACILITY.

Navy............................... Guam.................... Naval Base Guam........ PDI: 9TH ESB TRAINING 23,380 0 23,380

COMPLEX.

Navy............................... Guam.................... Naval Base Guam........ PDI: ARTILLERY BATTERY 137,550 -70,000 67,550

FACILITIES.

Navy............................... Guam.................... Naval Base Guam........ PDI: CONSOLIDATED MEB 19,740 0 19,740

HQ/NCIS PHII.

Navy............................... Guam.................... Naval Base Guam........ PDI: RECREATION CENTER. 34,740 0 34,740

Navy............................... Guam.................... Naval Base Guam........ PDI: RELIGIOUS MINISTRY 46,350 0 46,350

SERVICES FACILITY.

Navy............................... Guam.................... Naval Base Guam........ PDI: SATELLITE 166,159 -110,000 56,159

COMMUNICATIONS

FACILITY (INC).

Navy............................... Guam.................... Naval Base Guam........ PDI: TRAINING CENTER... 89,640 0 89,640

Navy............................... Hawaii.................. Joint Base Pearl Harbor- DRY DOCK 3 REPLACEMENT 1,318,711 91,000 1,409,711

Hickam. (INC).

Navy............................... Hawaii.................. Joint Base Pearl Harbor- WATERFRONT PRODUCTION 0 60,000 60,000

Hickam. FACILITY (P&D).

Navy............................... Hawaii.................. Marine Corps Base WATER RECLAMATION 0 40,000 40,000

Kaneohe Bay. FACILITY COMPLIANCE

UPGRADE.

Navy............................... Italy................... Naval Air Station EDI: ORDNANCE MAGAZINES 77,072 0 77,072

Sigonella.

Navy............................... Maine................... Portsmouth Naval MULTI-MISSION DRYDOCK 544,808 0 544,808

Shipyard. #1 EXTENSION (INC).

Navy............................... Maryland................ Fort Meade............. CYBERSECURITY 186,480 -125,900 60,580

OPERATIONS FACILITY.

Navy............................... Maryland................ Naval Air Station AIRCRAFT DEVELOPMENT 141,700 -79,700 62,000

Patuxent River. AND MAINTENANCE

FACILITIES.

Navy............................... North Carolina.......... Marine Corps Air 2D LAAD MAINTENANCE AND 0 50,000 50,000

Station Cherry Point. OPERATIONS FACILITIES.

Navy............................... North Carolina.......... Marine Corps Air AIRCRAFT MAINTENANCE 19,529 0 19,529

Station Cherry Point. HANGAR (INC).

Navy............................... North Carolina.......... Marine Corps Air MAINTENANCE FACILITY & 125,150 -85,000 40,150

Station Cherry Point. MARINE AIR GROUP HQS.

Navy............................... North Carolina.......... Marine Corps Base Camp 10TH MARINES 0 20,000 20,000

Lejeune. MAINTENANCE &

OPERATIONS COMPLEX.

Navy............................... North Carolina.......... Marine Corps Base Camp AMPHIBIOUS COMBAT 0 31,890 31,890

Lejeune. VEHICLE SHELTERS.

Navy............................... North Carolina.......... Marine Corps Base Camp CORROSION REPAIR 0 20,000 20,000

Lejeune. FACILITY REPLACEMENT.

Navy............................... Pennsylvania............ Naval Surface Warfare AI MACHINERY CONTROL 0 88,200 88,200

Center Philadelphia DEVELOPMENT CENTER.

Dam Neck Annex.

Navy............................... Virginia................ ....................... MARITIME SURVEILLANCE 109,680 0 109,680

SYSTEM FACILITY.

Navy............................... Virginia................ Joint Expeditionary CHILD DEVELOPMENT 35,000 0 35,000

Base Little Creek-- CENTER.

Fort Story.

Navy............................... Virginia................ Marine Corps Base WATER TREATMENT PLANT.. 127,120 -90,000 37,120

Quantico.

Navy............................... Virginia................ Naval Station Norfolk.. CHILD DEVELOPMENT 43,600 0 43,600

CENTER.

Navy............................... Virginia................ Naval Station Norfolk.. MQ-25 AIRCRAFT LAYDOWN 114,495 -103,000 11,495

FACILITIES.

Navy............................... Virginia................ Naval Station Norfolk.. SUBMARINE PIER 3 (INC). 99,077 0 99,077

Navy............................... Virginia................ Naval Weapons Station WEAPONS MAGAZINES...... 221,920 -175,000 46,920

Yorktown.

Navy............................... Virginia................ Norfolk Naval Shipyard. DRY DOCK SALTWATER 81,082 0 81,082

SYSTEM FOR CVN-78

(INC).

Navy............................... Washington.............. Naval Base Kitsap...... ALTERNATE POWER 0 19,000 19,000

TRANSMISSION LINE.

Navy............................... Washington.............. Naval Base Kitsap...... ARMORED FIGHTING 0 31,000 31,000

VEHICLE SUPPORT

FACILITY.

Navy............................... Washington.............. Naval Base Kitsap...... SHIPYARD ELECTRICAL 195,000 -180,000 15,000

BACKBONE.

Navy............................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 75,000 75,000

FUND.

Navy............................... Worldwide Unspecified... Unspecified Worldwide.. INDOPACOM PLANNING & 0 69,000 69,000

DESIGN.

Navy............................... Worldwide Unspecified... Unspecified Worldwide.. MCON-D (UTILITIES 0 85,000 85,000

MILCON) (P&D).

Navy............................... Worldwide Unspecified... Unspecified Worldwide.. SIOP (P&D)............. 0 50,000 50,000

Navy............................... Worldwide Unspecified... Unspecified Worldwide.. PLANNING & DESIGN...... 599,942 0 599,942

Navy............................... Worldwide Unspecified... Unspecified Worldwide.. UNSPECIFIED MINOR 34,430 30,000 64,430

CONSTRUCTION.

Navy............................... Worldwide Unspecified... Unspecified Worldwide.. USMC PLANNING & DESIGN. 0 48,741 48,741

........................ ....................... Subtotal Military 6,022,187 -936,274 5,085,913

Construction, Navy.

AIR FORCE.......................... ........................ ....................... ....................... ........... ........... ...........

Air Force.......................... Alaska.................. Eielson Air Force Base. CONSOLIDATED MUNITIONS 0 1,200 1,200

COMPLEX (P&D).

Air Force.......................... Alaska.................. Eielson Air Force Base. JOINT PACIFIC ALASKA 0 1,100 1,100

RANGE COMPLEX (JPARC)

OPS FACILITY (P&D).

Air Force.......................... Alaska.................. Joint Base Elmendorf- EXTEND RUNWAY 16/34 107,500 0 107,500

Richardson. (INC 3).

Air Force.......................... Alaska.................. Joint Base Elmendorf- PRECISION GUIDED 0 6,100 6,100

Richardson. MISSILE COMPLEX (P&D).

Air Force.......................... Arizona................. Luke Air Force Base.... GILA BEND (P&D)........ 0 2,600 2,600

Air Force.......................... Australia............... Royal Australian Air PDI: SQUADRON 26,000 0 26,000

Force Base Darwin. OPERATIONS FACILITY.

Air Force.......................... Australia............... Royal Australian Air PDI: AIRCRAFT 17,500 0 17,500

Force Base Tindal. MAINTENANCE SUPPORT

FACILITY.

Air Force.......................... Australia............... Royal Australian Air PDI: SQUADRON 20,000 0 20,000

Force Base Tindal. OPERATIONS FACILITY.

Air Force.......................... Australia............... Royal Australian Air PDI: BOMBER APRON...... 93,000 0 93,000

Force Base Tindal.

Air Force.......................... District of Columbia.... Joint Base Anacostia- LARGE VEHICLE 0 50,000 50,000

Bolling. INSPECTION STATION.

Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL AIRCRAFT 25,000 0 25,000

CORROSION CONTROL.

Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL AIRCRAFT 27,000 0 27,000

MAINTENANCE HANGAR.

Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL APRON & 61,000 0 61,000

HYDRANT FUELING PITS.

Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL FUEL SYSTEM 18,000 0 18,000

MAINTENANCE DOCK.

Air Force.......................... Florida................. Patrick Space Force COMMERCIAL VEHICLE 15,000 0 15,000

Base. INSPECTION.

Air Force.......................... Florida................. Patrick Space Force COST TO COMPLETE: 15,000 0 15,000

Base. CONSOLIDATED

COMMUNICATIONS CENTER.

Air Force.......................... Florida................. Patrick Space Force FINAL DENIAL BARRIERS, 12,000 0 12,000

Base. SOUTH GATE.

Air Force.......................... Florida................. Tyndall Air Force Base. NATURAL DISASTER 0 252,000 252,000

RECOVERY.

Air Force.......................... Georgia................. Robins Air Force Base.. BATTLE MANAGEMENT 115,000 0 115,000

COMBINED OPERATIONS

COMPLEX.

Air Force.......................... Guam.................... Joint Region Marianas.. PDI: NORTH AIRCRAFT 109,000 0 109,000

PARKING RAMP (INC).

Air Force.......................... Japan................... Kadena Air Base........ PDI: HELO RESCUE OPS 46,000 0 46,000

MAINTENANCE HANGAR

(INC 3).

Air Force.......................... Japan................... Kadena Air Base........ PDI: THEATER A/C 42,000 0 42,000

CORROSION CONTROL CTR

(INC).

Air Force.......................... Louisiana............... Barksdale Air Force CHILD DEVELOPMENT 0 2,000 2,000

Base. CENTER (P&D).

Air Force.......................... Louisiana............... Barksdale Air Force DORMITORY (P&D)........ 0 7,000 7,000

Base.

Air Force.......................... Louisiana............... Barksdale Air Force WEAPONS GENERATION 112,000 0 112,000

Base. FACILITY (INC 3).

Air Force.......................... Mariana Islands......... Tinian................. PDI: AIRFIELD 26,000 0 26,000

DEVELOPMENT, PHASE 1

(INC 3).

Air Force.......................... Mariana Islands......... Tinian................. PDI: FUEL TANKS W/ 20,000 0 20,000

PIPELINE & HYDRANT

(INC 3).

Air Force.......................... Mariana Islands......... Tinian................. PDI: PARKING APRON (INC 32,000 0 32,000

3).

Air Force.......................... Massachusetts........... Hanscom Air Force Base. CHILD DEVELOPMENT 37,000 0 37,000

CENTER.

Air Force.......................... Massachusetts........... Hanscom Air Force Base. MIT-LINCOLN LAB (WEST 70,000 0 70,000

LAB CSL/MIF) (INC 4).

Air Force.......................... Mississippi............. Columbus Air Force Base T-7A GROUND BASED 30,000 0 30,000

TRAINING SYSTEM

FACILITY.

Air Force.......................... Mississippi............. Columbus Air Force Base T-7A UNIT MAINTENANCE 9,500 0 9,500

TRAINING FACILITY.

Air Force.......................... Mississippi............. Keesler Air Force Base. AIR TRAFFIC CONTROL 0 2,000 2,000

TOWER (P&D).

Air Force.......................... Montana................. Malmstrom Air Force FIRE STATION BAY/ 0 10,300 10,300

Base. STORAGE AREA.

Air Force.......................... Nebraska................ Offutt Air Force Base.. 55 CES MAINTENANCE/ 0 4,500 4,500

WAREHOUSE (P&D).

Air Force.......................... Nebraska................ Offutt Air Force Base.. BASE OPERATIONS/ 0 5,000 5,000

MOBILITY CENTER (P&D).

Air Force.......................... Nebraska................ Offutt Air Force Base.. LOGISTICS READINESS 0 3,500 3,500

SQUADRON

TRANSPORTATION

FACILITY (P&D).

Air Force.......................... Nevada.................. Nellis Air Force Base.. F-35 COALITION HANGAR 0 5,500 5,500

(P&D).

Air Force.......................... Nevada.................. Nellis Air Force Base.. F-35 DATA LAB SUPPORT 0 700 700

FACILITY (P&D).

Air Force.......................... New Mexico.............. Cannon Air Force Base.. SATELLITE FIRE STATION 0 5,000 5,000

(P&D).

Air Force.......................... New Mexico.............. Kirtland Air Force Base COST TO COMPLETE: 0 24,400 24,400

WYOMING GATE UPGRADE

FOR ANTITERRORISM

COMPLIANCE.

Air Force.......................... Norway.................. Rygge Air Station...... EDI: DABS-FEV STORAGE.. 88,000 0 88,000

Air Force.......................... Norway.................. Rygge Air Station...... EDI: MUNITIONS STORAGE 31,000 0 31,000

AREA.

Air Force.......................... Ohio.................... Wright-Patterson Air ACQUISITION MANAGEMENT 0 19,500 19,500

Force Base. COMPLEX PHASE V (P&D).

Air Force.......................... Oklahoma................ Tinker Air Force Base.. KC-46 3-BAY DEPOT 78,000 0 78,000

MAINTENANCE HANGAR

(INC 3).

Air Force.......................... Oklahoma................ Vance Air Force Base... CONSOLIDATED 0 8,400 8,400

UNDERGRADUATE PILOT

TRAINING CENTER (P&D).

Air Force.......................... Philippines............. Cesar Basa Air Base.... PDI: TRANSIENT AIRCRAFT 35,000 0 35,000

PARKING APRON.

Air Force.......................... South Dakota............ Ellsworth Air Force B-21 FUEL SYSTEM 75,000 0 75,000

Base. MAINTENANCE DOCK.

Air Force.......................... South Dakota............ Ellsworth Air Force B-21 PHASE HANGAR...... 160,000 0 160,000

Base.

Air Force.......................... South Dakota............ Ellsworth Air Force B-21 WEAPONS GENERATION 160,000 0 160,000

Base. FACILITY (INC).

Air Force.......................... Spain................... Moron Air Base......... EDI: MUNITIONS STORAGE. 26,000 0 26,000

Air Force.......................... Texas................... Joint Base San Antonio- 91 CYBER OPERATIONS 0 48,000 48,000

Lackland. CENTER.

Air Force.......................... Texas................... Joint Base San Antonio- BMT--CHAPEL FOR 0 122,000 122,000

Lackland. AMERICA'S AIRMEN.

Air Force.......................... Texas................... Joint Base San Antonio- BMT--CLASSROOM/DINING 0 124,000 124,000

Lackland. FACILITY 4.

Air Force.......................... Texas................... Joint Base San Antonio- CHILD DEVELOPMENT 20,000 0 20,000

Lackland. CENTER.

Air Force.......................... United Kingdom.......... Royal Air Force COST TO COMPLETE: EDI 0 28,000 28,000

Fairford. DABS-FEV STORAGE.

Air Force.......................... United Kingdom.......... Royal Air Force COST TO COMPLETE: EDI 0 20,000 20,000

Fairford. MUNITIONS HOLDING AREA.

Air Force.......................... United Kingdom.......... Royal Air Force EDI: RADR STORAGE 47,000 0 47,000

Fairford. FACILITY.

Air Force.......................... United Kingdom.......... Royal Air Force EDI: RADR STORAGE 28,000 0 28,000

Lakenheath. FACILITY.

Air Force.......................... United Kingdom.......... Royal Air Force SURETY DORMITORY....... 50,000 0 50,000

Lakenheath.

Air Force.......................... Utah.................... Hill Air Force Base.... F-35 COMPOSITE REPAIR & 0 171,000 171,000

TRAINING FACILITY,

PHASE 1.

Air Force.......................... Utah.................... Hill Air Force Base.... F-35 MAINTENANCE 0 235,000 235,000

FACILITY, PHASE 1.

Air Force.......................... Utah.................... Hill Air Force Base.... F-35 T-7A EAST CAMPUS 82,000 0 82,000

INFRASTRUCTURE.

Air Force.......................... Virginia................ Langley Air Force Base. COST TO COMPLETE-- 0 84,000 84,000

DORMITORY.

Air Force.......................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 50,000 50,000

FUND.

Air Force.......................... Worldwide Unspecified... Unspecified Worldwide EDI: PLANNING & DESIGN. 5,648 0 5,648

Locations.

Air Force.......................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 429,266 0 429,266

Locations.

Air Force.......................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 64,900 0 64,900

Locations. MILITARY CONSTRUCTION.

Air Force.......................... Wyoming................. F.E. Warren Air Force COST TO COMPLETE: 0 18,000 18,000

Base. CONSOLIDATED HELO/TRF

OPS/AMU AND ALERT

FACILITY.

Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD INTEGRATED COMMAND 27,000 0 27,000

Base. CENTER (INC 2).

Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD INTEGRATED 85,000 0 85,000

Base. TRAINING CENTER.

Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD MISSILE HANDLING 28,000 0 28,000

Base. COMPLEX (INC 2).

--------------------------

........................ ....................... Subtotal Military 2,605,314 1,310,800 3,916,114

Construction, Air

Force.

DEFENSE-WIDE ........................ ....................... ....................... ........... ........... ...........

Defense-Wide....................... Alabama................. Redstone Arsenal....... GROUND TEST FACILITY 147,975 -70,000 77,975

INFRASTRUCTURE.

Defense-Wide....................... California.............. Marine Corps Air AMBULATORY CARE CENTER-- 103,000 -82,400 20,600

Station Miramar. DENTAL CLINIC ADD//ALT.

Defense-Wide....................... California.............. Marine Corps Air ELECTRICAL 0 30,550 30,550

Station Miramar. INFRASTRUCTURE, ON-

SITE GENERATION, AND

MICROGRID IMPROVEMENTS.

Defense-Wide....................... California.............. Monterey............... COST TO COMPLETE: COGEN 0 5,460 5,460

PLANT AT B236.

Defense-Wide....................... California.............. Mountain View.......... INSTALL MICROGRID, 0 15,500 15,500

750KW PV, 750KWH BESS,

& 800KW GENERATOR

SYSTEM.

Defense-Wide....................... California.............. Naval Base Coronado.... COST TO COMPLETE: ATC 0 11,400 11,400

OPERATIONS SUPPORT

FACILITY.

Defense-Wide....................... California.............. Naval Base Coronado.... SOF NAVAL SPECIAL 0 51,000 51,000

WARFARE COMMAND

OPERATIONS SUPPORT

FACILITY, PHASE 2.

Defense-Wide....................... California.............. Naval Base San Diego... AMBULATORY CARE CENTER-- 101,644 -79,460 22,184

DENTAL CLINIC REPLMT.

Defense-Wide....................... California.............. Naval Base San Diego... MICROGRID AND BACKUP 0 6,300 6,300

POWER.

Defense-Wide....................... California.............. Naval Base Ventura COST TO COMPLETE: 0 16,840 16,840

County. GROUND MOUNTED SOLAR

PV.

Defense-Wide....................... California.............. Vandenberg Space Force MICROGRID WITH BACKUP 0 57,000 57,000

Base. POWER.

Defense-Wide....................... Colorado................ Buckley Space Force REDUNDANT ELECTRICAL 0 9,000 9,000

Base. SUPPLY.

Defense-Wide....................... Colorado................ Buckley Space Force REPLACEMENT WATER WELL. 0 5,700 5,700

Base.

Defense-Wide....................... Cuba.................... Guantanamo Bay Naval AMBULATORY CARE CENTER 60,000 0 60,000

Station. (INC 1).

Defense-Wide....................... Delaware................ Dover Air Force Base... ARMED SERVICES WHOLE 0 30,500 30,500

BLOOD PROCESSING

LABORATORY.

Defense-Wide....................... Diego Garcia............ Naval Support Facility MICROGRID ELECTRIC 0 16,820 16,820

Diego Garcia. DISTRIBUTION LINE

UPGRADE.

Defense-Wide....................... Djibouti................ Camp Lemonnier......... COST TO COMPLETE: 0 5,200 5,200

ENHANCE ENERGY

SECURITY AND CONTROL

SYSTEMS.

Defense-Wide....................... Florida................. Naval Air Station POTABLE WATER 0 31,220 31,220

Whiting Field. DISTRIBUTION SYSTEM.

Defense-Wide....................... Georgia................. Fort Benning........... COST TO COMPLETE: 5.2MW 0 27,351 27,351

MICROGRID & GENERATION

PLANT.

Defense-Wide....................... Georgia................. Kings Bay.............. COST TO COMPLETE: SCADA 0 2,700 2,700

MODERNIZATION.

Defense-Wide....................... Georgia................. Naval Submarine Base COST TO COMPLETE: 0 25,190 25,190

Kings Bay. ELECTRICAL

TRANSMISSION AND

DISTRIBUTION

IMPROVEMENTS (PHAS.

Defense-Wide....................... Georgia................. Naval Submarine Base ELECTRICAL TRANSMISSION 0 49,500 49,500

Kings Bay. AND DISTRIBUTION

IMPROVEMENTS, PHASE 2.

Defense-Wide....................... Germany................. Baumholder............. HUMAN PERFORMANCE 0 16,700 16,700

TRAINING CENTER.

Defense-Wide....................... Germany................. Baumholder............. SOF COMPANY OPERATIONS 41,000 0 41,000

FACILITY.

Defense-Wide....................... Germany................. Baumholder............. SOF JOINT PARACHUTE 23,000 0 23,000

RIGGING FACILITY.

Defense-Wide....................... Germany................. Kaiserslautern Air Base KAISERSLAUTERN MIDDLE 21,275 0 21,275

SCHOOL.

Defense-Wide....................... Germany................. Ramstein Air Base...... RAMSTEIN MIDDLE SCHOOL. 181,764 0 181,764

Defense-Wide....................... Germany................. Rhine Ordnance Barracks MEDICAL CENTER 77,210 0 77,210

REPLACEMENT (INC 11).

Defense-Wide....................... Germany................. Stuttgart.............. ROBINSON BARRACKS ELEM 8,000 0 8,000

SCHOOL REPLACEMENT.

Defense-Wide....................... Hawaii.................. Joint Base Pearl Harbor- COST TO COMPLETE: FY20 0 7,476 7,476

Hickam. 500 KW PV COVERED

PARKING EV CHARGING

STATION.

Defense-Wide....................... Hawaii.................. Joint Base Pearl Harbor- COST TO COMPLETE: 0 13,040 13,040

Hickam. PRIMARY ELECTRICAL

DISTRIBUTION.

Defense-Wide....................... Honduras................ Soto Cano Air Base..... FUEL FACILITIES........ 41,300 0 41,300

Defense-Wide....................... Italy................... Naples................. COST TO COMPLETE: SMART 0 7,610 7,610

GRID.

Defense-Wide....................... Japan................... Fleet Activities KINNICK HIGH SCHOOL 70,000 0 70,000

Yokosuka. (INC).

Defense-Wide....................... Japan................... Kadena Air Base........ PDI: SOF MAINTENANCE 88,900 0 88,900

HANGAR.

Defense-Wide....................... Japan................... Kadena Air Base........ PDI: SOF COMPOSITE 11,400 0 11,400

MAINTENANCE FACILITY.

Defense-Wide....................... Kansas.................. Forbes Field........... MICROGRID AND BACKUP 0 5,850 5,850

POWER.

Defense-Wide....................... Kansas.................. Fort Riley............. COST TO COMPLETE: POWER 0 15,468 15,468

GENERATION AND

MICROGRID.

Defense-Wide....................... Korea................... K-16 Air Base.......... K-16 EMERGENCY BACKUP 0 5,650 5,650

POWER.

Defense-Wide....................... Kuwait.................. Camp Arifjan........... COST TO COMPLETE: POWER 0 8,197 8,197

GENERATION AND

MICROGRID.

Defense-Wide....................... Kuwait.................. Camp Buehring.......... MICROGRID AND BACKUP 0 18,850 18,850

POWER.

Defense-Wide....................... Louisiana............... Naval Air Station Joint COST TO COMPLETE: 0 6,453 6,453

Reserve Base New DISTRIBUTION

Orleans. SWITCHGEAR.

Defense-Wide....................... Maryland................ Bethesda Naval Hospital MEDICAL CENTER ADDITION/ 101,816 0 101,816

ALTERATION (INC 7).

Defense-Wide....................... Maryland................ Fort Meade............. NSAW MISSION OPS AND 105,000 0 105,000

RECORDS CENTER (INC).

Defense-Wide....................... Maryland................ Fort Meade............. NSAW RECAP BUILDING 4 315,000 0 315,000

(INC).

Defense-Wide....................... Maryland................ Fort Meade............. NSAW RECAP BUILDING 5 65,000 0 65,000

(ECB 5) (INC).

Defense-Wide....................... Maryland................ Joint Base Andrews..... HYDRANT FUELING SYSTEM. 38,300 0 38,300

Defense-Wide....................... Missouri................ Lake City Army MICROGRID AND BACKUP 0 80,100 80,100

Ammunition Plant. POWER.

Defense-Wide....................... Montana................. Great Falls FUEL FACILITIES........ 30,000 0 30,000

International Airport.

Defense-Wide....................... Nebraska................ Offutt Air Force Base.. DEFENSE POW/MIA 0 5,000 5,000

ACCOUNTABILITY AGENCY

LABORATORY (P&D).

Defense-Wide....................... Nebraska................ Offutt Air Force Base.. MICROGRID AND BACKUP 0 41,000 41,000

POWER.

Defense-Wide....................... New Jersey.............. Sea Girt............... UNDERGROUND ELECTRICAL 0 44,000 44,000

DISTRIBUTION SYSTEM.

Defense-Wide....................... North Carolina.......... Fort Liberty........... COST TO COMPLETE: FORT 0 1,418 1,418

LIBERTY EMERGENCY

WATER SYSTEM.

Defense-Wide....................... North Carolina.......... Fort Liberty (Camp MICROGRID AND BACKUP 0 10,500 10,500

Mackall). POWER.

Defense-Wide....................... North Carolina.......... Marine Corps Base Camp MARINE RAIDER BATTALION 0 70,000 70,000

Lejeune. OPERATIONS FACILITY.

Defense-Wide....................... Oklahoma................ Fort Sill.............. MICROGRID AND BACKUP 0 76,650 76,650

POWER.

Defense-Wide....................... Pennsylvania............ Fort Indiantown Gap.... COST TO COMPLETE: 0 9,250 9,250

GEOTHERMAL AND SOLAR

PV.

Defense-Wide....................... Puerto Rico............. Fort Buchanan.......... MICROGRID AND BACKUP 0 56,000 56,000

POWER.

Defense-Wide....................... Puerto Rico............. Juana Diaz............. COST TO COMPLETE: 0 7,680 7,680

MICROGRID CONTROLS,

690 KW PV, 275KW GEN,

570 KWH BESS.

Defense-Wide....................... Puerto Rico............. Ramey.................. COST TO COMPLETE: 0 6,360 6,360

MICROGRID CONTROL

SYSTEM, 460 KW PV,

275KW GEN, 660 KWH BES.

Defense-Wide....................... Spain................... Naval Station Rota..... BULK TANK FARM, PHASE 1 80,000 0 80,000

Defense-Wide....................... Texas................... Fort Cavazos........... CENTRAL CHILLED WATER 0 32,000 32,000

PLANT.

Defense-Wide....................... Texas................... Fort Cavazos........... COST TO COMPLETE: POWER 0 18,900 18,900

GENERATION AND

MICROGRID.

Defense-Wide....................... Texas................... Fort Cavazos........... MICROGRID AND BACKUP 0 18,250 18,250

POWER.

Defense-Wide....................... Utah.................... Camp Williams.......... MICROGRID & WIND 0 20,100 20,100

TURBINE.

Defense-Wide....................... Utah.................... Hill Air Force Base.... OPEN STORAGE........... 14,200 0 14,200

Defense-Wide....................... Virginia................ Fort Belvoir........... DIA HEADQUARTERS ANNEX. 185,000 -160,000 25,000

Defense-Wide....................... Virginia................ Hampton Roads.......... COST TO COMPLETE: 0 1,200 1,200

BACKUP POWER

GENERATION.

Defense-Wide....................... Virginia................ Joint Expeditionary SOF SDVT2 OPERATIONS 61,000 0 61,000

Base Little Creek-- SUPPORT FACILITY.

Fort Story.

Defense-Wide....................... Virginia................ Fort Belvoir (NGA COST TO COMPLETE: 0 550 550

Campus East). CHILLED WATER

REDUNDANCY.

Defense-Wide....................... Virginia................ Pentagon............... HVAC EFFICIENCY 0 2,250 2,250

UPGRADES.

Defense-Wide....................... Virginia................ Pentagon............... SEC OPS AND PEDESTRIAN 30,600 0 30,600

ACCESS FACS.

Defense-Wide....................... Washington.............. Joint Base Lewis- POWER GENERATION AND 0 49,850 49,850

McChord. MICROGRID.

Defense-Wide....................... Washington.............. Joint Base Lewis- SOF CONSOLIDATED 62,000 0 62,000

McChord. RIGGING FACILITY.

Defense-Wide....................... Washington.............. Manchester............. BULK STORAGE TANKS, 71,000 0 71,000

PHASE 2.

Defense-Wide....................... Washington.............. Naval Base Kitsap...... MAIN SUBSTATION 0 31,520 31,520

REPLACEMENT AND

MICROGRID.

Defense-Wide....................... Washington.............. Naval Magazine Indian MICROGRID AND BACKUP 0 37,770 37,770

Island. POWER.

Defense-Wide....................... Washington.............. Naval Undersea Warfare SOF COLD WATER TRAINING 0 37,000 37,000

Center Keyport. AUSTERE ENVIRONMENT

FACILITY.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide.. INDOPACOM UNSPECIFIED 0 62,000 62,000

MINOR MILITARY

CONSTRUCTION.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide ENERGY RESILIENCE AND 548,000 -548,000 0

Locations. CONSERV. INVEST. PROG..

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide ERCIP PLANNING & DESIGN 86,250 0 86,250

Locations.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide EXERCISE RELATED MINOR 11,107 0 11,107

Locations. CONSTRUCTION.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (DHA) 49,610 0 49,610

Locations.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 32,579 0 32,579

Locations. (Defense-Wide).

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 30,215 0 30,215

Locations. (CYBERCOM).

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 25,130 0 25,130

Locations. (SOCOM).

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (DLA) 24,000 0 24,000

Locations.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 8,568 0 8,568

Locations. (DODEA).

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (NSA) 3,068 0 3,068

Locations.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (TJS) 2,000 0 2,000

Locations.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (MDA) 1,035 0 1,035

Locations.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (WHS) 590 0 590

Locations.

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 19,271 0 19,271

Locations. CONSTRUCTION (SOCOM).

Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 3,000 0 3,000

Locations. CONSTRUCTION (DEFENSE-

WIDE).

Defense-Wide....................... Worldwide Unspecified... Various Worldwide UNSPECIFIED MINOR 4,875 0 4,875

Locations. CONSTRUCTION (DLA).

Defense-Wide....................... Wyoming................. F.E. Warren Air Force MICROGRID AND BATTERY 0 25,000 25,000

Base. STORAGE.

--------------------------

Subtotal Military 2,984,682 307,013 3,291,695

Construction, Defense-

Wide.

ARMY NATIONAL GUARD

Army National Guard................ Alabama................. Fort McClellan......... COST TO COMPLETE: 0 7,000 7,000

ENLISTED BARRACKS, TT.

Army National Guard................ Alabama................. Huntsville............. COST TO COMPLETE: 0 4,650 4,650

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Arizona................. Surprise Readiness NATIONAL GUARD 15,000 0 15,000

Center. READINESS CENTER.

Army National Guard................ Arkansas................ Fort Chaffee........... COST TO COMPLETE: 0 610 610

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ California.............. Bakersfield............ COST TO COMPLETE: 0 1,000 1,000

VEHICLE MAINTENANCE

SHOP.

Army National Guard................ California.............. Camp Roberts........... COST TO COMPLETE: 0 5,000 5,000

AUTOMATED MULTIPURPOSE

MACHINE GUN (MPMG)

RANGE.

Army National Guard................ Colorado................ Peterson Space Force COST TO COMPLETE: 0 3,000 3,000

Base. NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Connecticut............. Putnam................. COST TO COMPLETE: 0 6,125 6,125

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Florida................. Camp Blanding.......... MULTIPURPOSE MACHINE 0 11,000 11,000

GUN RANGE.

Army National Guard................ Guam.................... Barrigada.............. COST TO COMPLETE: 0 6,900 6,900

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Idaho................... Jerome................. COST TO COMPLETE: 0 1,250 1,250

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Idaho................... Jerome County Regional NATIONAL GUARD VEHICLE 17,000 0 17,000

Site. MAINTENANCE SHOP.

Army National Guard................ Illinois................ Bloomington............ COST TO COMPLETE: 0 5,250 5,250

NATIONAL GUARD VEHICLE

MAINTENANCE SHOP.

Army National Guard................ Illinois................ North Riverside Armory. NATIONAL GUARD VEHICLE 24,000 0 24,000

MAINTENANCE SHOP.

Army National Guard................ Indiana................. Shelbyville............ COST TO COMPLETE: 0 5,000 5,000

NATIONAL GUARD

READINESS CENTER ADD/

ALT.

Army National Guard................ Kansas.................. Topeka................. COST TO COMPLETE: 0 5,856 5,856

NATIONAL GUARD/RESERVE

CENTER BUILDING.

Army National Guard................ Kentucky................ Burlington............. VEHICLE MAINTENANCE 0 16,400 16,400

SHOP.

Army National Guard................ Kentucky................ Frankfort.............. COST TO COMPLETE: 0 2,000 2,000

NATIONAL GUARD/RESERVE

CENTER BUILDING.

Army National Guard................ Louisiana............... Camp Beauregard........ COLLECTIVE TRAINING 0 2,400 2,400

UNACCOMPANIED HOUSING

OPEN-BAY (P&D).

Army National Guard................ Louisiana............... Camp Beauregard........ COST TO COMPLETE: 0 2,000 2,000

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Louisiana............... Camp Minden............ COST TO COMPLETE: 0 3,718 3,718

COLLECTIVE TRAINING

UNACCOMPANIED HOUSING,

OPEN BAY.

Army National Guard................ Maine................... Northern Maine Range AUTOMATED MULTIPURPOSE 0 2,800 2,800

Complex. MACHINE GUN RANGE

(P&D).

Army National Guard................ Maine................... Saco................... COST TO COMPLETE: 0 7,420 7,420

NATIONAL GUARD VEHICLE

MAINTENANCE SHOP.

Army National Guard................ Massachusetts........... Camp Edwards........... COST TO COMPLETE: 0 3,000 3,000

AUTOMATED MULTIPURPOSE

MACHINE GUN (MPMG)

RANGE.

Army National Guard................ Mississippi............. Camp Shelby............ CAMP SHELBY JFTC 0 2,200 2,200

RAILHEAD EXPANSION

(P&D).

Army National Guard................ Mississippi............. Camp Shelby............ COST TO COMPLETE: 0 5,425 5,425

MANEUVER AREA TRAINING

EQUIPMENT SITE

ADDITION.

Army National Guard................ Mississippi............. Southaven.............. NATIONAL GUARD 0 22,000 22,000

READINESS CENTER.

Army National Guard................ Missouri................ Belle Fontaine......... NATIONAL GUARD 28,000 0 28,000

READINESS CENTER.

Army National Guard................ Nebraska................ Bellevue............... COST TO COMPLETE: 0 9,090 9,090

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Nebraska................ Greenlief Training Site COLLECTIVE TRAINING 0 1,200 1,200

UNACCOMPANIED HOUSING

OPEN-BAY (P&D).

Army National Guard................ Nebraska................ Mead Training Site..... COST TO COMPLETE: 0 1,912 1,912

COLLECTIVE TRAINING

UNACCOMPANIED HOUSING,

OPEN BAY.

Army National Guard................ Nebraska................ North Platte........... COST TO COMPLETE: 0 400 400

NATIONAL GUARD VEHICLE

MAINTENANCE SHOP.

Army National Guard................ New Hampshire........... Concord................ COST TO COMPLETE: 0 200 200

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ New Hampshire........... Littleton.............. NATIONAL GUARD VEHICLE 23,000 0 23,000

MAINTENANCE SHOP ADD.

Army National Guard................ New Jersey.............. Joint Base McGuire-Dix- COST TO COMPLETE: 0 605 605

Lakehurst. NATIONAL GUARD

READINESS CENTER.

Army National Guard................ New Mexico.............. Rio Rancho Training NATIONAL GUARD VEHICLE 11,000 0 11,000

Site. MAINTENANCE SHOP ADD.

Army National Guard................ New York................ Lexington Avenue Armory NATIONAL GUARD 0 70,000 70,000

READINESS CENTER.

Army National Guard................ North Carolina.......... Salisbury.............. ARMY AVIATION SUPPORT 0 2,200 2,200

FACILITIES (P&D).

Army National Guard................ North Dakota............ Camp Grafton........... INSTITUTIONAL POST- 0 1,950 1,950

INITIAL MILITARY

TRAINING,

UNACCOMPANIED HOUSING

(P&D).

Army National Guard................ North Dakota............ Dickinson.............. COST TO COMPLETE: 0 5,425 5,425

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Ohio.................... Camp Perry Joint NATIONAL GUARD 19,200 0 19,200

Training Center. READINESS CENTER.

Army National Guard................ Ohio.................... Columbus............... COST TO COMPLETE: 0 4,000 4,000

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Oklahoma................ Ardmore................ COST TO COMPLETE: 0 400 400

VEHICLE MAINTENANCE

SHOP.

Army National Guard................ Oregon.................. Washington County NATIONAL GUARD 26,000 0 26,000

Readiness Center. READINESS CENTER.

Army National Guard................ Pennsylvania............ Hermitage Readiness NATIONAL GUARD 13,600 0 13,600

Center. READINESS CENTER.

Army National Guard................ Pennsylvania............ Moon Township.......... COST TO COMPLETE: 0 3,100 3,100

COMBINED SUPPORT

MAINTENANCE SHOP.

Army National Guard................ Puerto Rico............. Fort Allen............. COST TO COMPLETE: 0 3,678 3,678

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Rhode Island............ Camp Fogarty Training COLLECTIVE TRAINING 0 1,990 1,990

Site. UNACCOMPANIED HOUSING

OPEN-BAY (P&D).

Army National Guard................ Rhode Island............ North Kingstown........ NATIONAL GUARD 0 30,000 30,000

READINESS CENTER.

Army National Guard................ South Carolina.......... Aiken County Readiness NATIONAL GUARD 20,000 0 20,000

Center. READINESS CENTER.

Army National Guard................ South Carolina.......... Joint Base Charleston.. COST TO COMPLETE: 0 4,373 4,373

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ South Carolina.......... McCrady Training Center AUTOMATED MULTIPURPOSE 7,900 0 7,900

MACHINE GUN RANGE.

Army National Guard................ South Dakota............ Sioux Falls............ COST TO COMPLETE: 0 5,250 5,250

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Tennessee............... Campbell Army Air Field ARMY AIR TRAFFIC 0 2,500 2,500

CONTROL TOWERS (P&D).

Army National Guard................ Tennessee............... McMinnville............ COST TO COMPLETE: 0 500 500

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Texas................... Fort Cavazos........... GENERAL INSTRUCTION 0 2,685 2,685

BUILDING (P&D).

Army National Guard................ Texas................... Fort Worth............. COST TO COMPLETE: 0 6,489 6,489

AIRCRAFT MAINTENANCE

HANGAR ADD/ALT.

Army National Guard................ Texas................... Fort Worth............. COST TO COMPLETE: 0 381 381

NATIONAL GUARD VEHICLE

MAINTENANCE SHOP.

Army National Guard................ Utah.................... Camp Williams.......... COLLECTIVE TRAINING 0 2,875 2,875

UNACCOMPANIED HOUSING,

SENIOR NCO AND OFFICER

(P&D).

Army National Guard................ Vermont................. Bennington............. COST TO COMPLETE: 0 3,415 3,415

NATIONAL GUARD

READINESS CENTER.

Army National Guard................ Virgin Islands.......... St. Croix.............. COST TO COMPLETE: ARMY 0 4,200 4,200

AVIATION SUPPORT

FACILITY.

Army National Guard................ Virgin Islands.......... St. Croix.............. COST TO COMPLETE: READY 0 1,710 1,710

BUILDING.

Army National Guard................ Virginia................ Sandston RC & FMS 1.... AIRCRAFT MAINTENANCE 20,000 0 20,000

HANGAR.

Army National Guard................ Virginia................ Troutville............. COST TO COMPLETE: 0 2,415 2,415

COMBINED SUPPORT

MAINTENANCE SHOP

ADDITION.

Army National Guard................ Virginia................ Troutville............. COST TO COMPLETE: 0 2,135 2,135

NATIONAL GUARD

READINESS CENTER

ADDITION.

Army National Guard................ West Virginia........... Parkersburg............ NATIONAL GUARD 0 3,300 3,300

READINESS CENTER (P&D).

Army National Guard................ Wisconsin............... Viroqua................ NATIONAL GUARD 18,200 0 18,200

READINESS CENTER.

Army National Guard................ Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 34,286 0 34,286

Locations.

Army National Guard................ Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 63,000 0 63,000

Locations. CONSTRUCTION.

........................ ....................... Subtotal Military 340,186 310,382 650,568

Construction, Army

National Guard.

ARMY RESERVE ........................ ....................... ....................... ........... ........... ...........

Army Reserve....................... Alabama................. Birmingham............. ARMY RESERVE CENTER/ 57,000 0 57,000

AMSA/LAND.

Army Reserve....................... Arizona................. San Tan Valley......... AREA MAINTENANCE 12,000 0 12,000

SUPPORT ACTIVITY.

Army Reserve....................... California.............. Camp Pendleton......... COST TO COMPLETE: AREA 0 3,000 3,000

MAINTENANCE SUPPORT

ACTIVITY.

Army Reserve....................... California.............. Fort Hunter Liggett.... NETWORK ENTERPRISE 0 40,000 40,000

CENTER.

Army Reserve....................... California.............. Parks Reserve Forces ADVANCED SKILLS 0 35,000 35,000

Training Area. TRAINING BARRACKS.

Army Reserve....................... Georgia................. Marine Corps Logistics ARMY RESERVE CENTER.... 0 40,000 40,000

Base Albany.

Army Reserve....................... Florida................. Perrine................ COST TO COMPLETE: ARMY 0 3,000 3,000

RESERVE CENTER.

Army Reserve....................... Massachusetts........... Devens Reserve Forces COLLECTIVE TRAINING 0 39,000 39,000

Training Area. ENLISTED BARRACKS.

Army Reserve....................... North Carolina.......... Asheville.............. COST TO COMPLETE: ARMY 0 12,000 12,000

RESERVE CENTER.

Army Reserve....................... Ohio.................... Wright-Patterson Air COST TO COMPLETE: ARMY 0 5,000 5,000

Force Base. RESERVE CENTER.

Army Reserve....................... Puerto Rico............. Fort Buchanan.......... ADVANCED SKILLS 0 39,000 39,000

TRAINING BARRACKS.

Army Reserve....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 23,389 0 23,389

Locations.

Army Reserve....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 14,687 0 14,687

Locations. CONSTRUCTION.

--------------------------

........................ ....................... Subtotal Military 107,076 216,000 323,076

Construction, Army

Reserve.

NAVY RESERVE & MARINE CORPS RESERVE ........................ ....................... ....................... ........... ........... ...........

Navy Reserve & Marine Corps Reserve Michigan................ Battle Creek........... ORGANIC SUPPLY 24,549 0 24,549

FACILITIES.

Navy Reserve & Marine Corps Reserve Virginia................ Marine Forces Reserve G/ATOR SUPPORT 12,400 0 12,400

Dam Neck Virginia FACILITIES.

Beach.

Navy Reserve & Marine Corps Reserve Worldwide Unspecified... Unspecified Worldwide MCNR PLANNING & DESIGN. 6,495 0 6,495

Locations.

Navy Reserve & Marine Corps Reserve Worldwide Unspecified... Unspecified Worldwide MCNR UNSPECIFIED MINOR 7,847 0 7,847

Locations. CONSTRUCTION.

--------------------------

........................ ....................... Subtotal Military 51,291 0 51,291

Construction, Navy

Reserve & Marine Corps

Reserve.

AIR NATIONAL GUARD ........................ ....................... ....................... ........... ........... ...........

Air National Guard................. Alabama................. Montgomery Regional F-35 ADAL SQ OPS BLDG 7,000 0 7,000

Airport. 1303.

Air National Guard................. Alaska.................. Eielson Air Force Base. AMC STANDARD DUAL BAY 0 3,700 3,700

HANGAR (P&D).

Air National Guard................. Alaska.................. Joint Base Elmendorf- ADAL ALERT CREW 0 7,000 7,000

Richardson. FACILITY HGR 18.

Air National Guard................. Arizona................. Tucson International MCCA: AIRCRAFT 11,600 0 11,600

Airport. ARRESTING SYSTEM (NEW

RWY).

Air National Guard................. Arkansas................ Ebbing Air National 3-BAY HANGAR........... 0 54,000 54,000

Guard Base.

Air National Guard................. Arkansas................ Ebbing Air National AIRCREW FLIGHT 0 9,300 9,300

Guard Base. EQUIPMENT/STEP.

Air National Guard................. Arkansas................ Ebbing Air National SPECIAL ACCESS PROGRAM 0 12,700 12,700

Guard Base. FACILITY.

Air National Guard................. Colorado................ Buckley Space Force AIRCRAFT CORROSION 12,000 0 12,000

Base. CONTROL.

Air National Guard................. Georgia................. Savannah/Hilton Head DINING HALL AND 0 27,000 27,000

International Airport. SERVICES TRAINING

FACILITY.

Air National Guard................. Indiana................. Fort Wayne FIRE STATION........... 8,900 0 8,900

International Airport.

Air National Guard................. Mississippi............. Field Air National COST TO COMPLETE: 172ND 0 8,000 8,000

Guard Base. AIRLIFT WING FIRE/

CRASH RESCUE STATION.

Air National Guard................. Missouri................ Rosecrans Air National 139TH AIRLIFT WING 0 2,000 2,000

Guard Base. ENTRY CONTROL POINT

(P&D).

Air National Guard................. Missouri................ Rosecrans Air National ENTRY CONTROL POINT 0 2,000 2,000

Guard Base. (P&D).

Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 22,000 0 22,000

Airport. COMPLEX, PHASE 1.

Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 18,500 0 18,500

Airport. COMPLEX, PHASE 2.

Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 0 20,000 20,000

Airport. COMPLEX, PHASE 3.

Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 0 11,000 11,000

Airport. COMPLEX, PHASE 4.

Air National Guard................. Pennsylvania............ Harrisburg ENTRY CONTROL FACILITY. 0 8,000 8,000

International Airport.

Air National Guard................. Wisconsin............... Truax Field............ F-35: MM&I FAC, B701... 0 5,200 5,200

Air National Guard................. Wisconsin............... Volk Air National Guard FIRE/CRASH RESCUE 0 670 670

Base. STATION (P&D).

Air National Guard................. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 35,600 0 35,600

Locations.

Air National Guard................. Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 63,122 0 63,122

Locations. CONSTRUCTION.

--------------------------

........................ ....................... Subtotal Military 178,722 170,570 349,292

Construction, Air

National Guard.

AIR FORCE RESERVE ........................ ....................... ....................... ........... ........... ...........

Air Force Reserve.................. Arizona................. Davis-Monthan Air Force GUARDIAN ANGEL POTFF 0 8,500 8,500

Base. FACILITY.

Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 ADD/ALTER B1244 17,000 0 17,000

FUT/CARGO PALLET

STORAGE.

Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 ADD/ALTER B6000 8,500 0 8,500

SIMULATOR FACILITY.

Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 TWO BAY 201,000 0 201,000

MAINTENANCE/FUEL

HANGAR.

Air Force Reserve.................. Guam.................... Joint Region Marianas.. AERIAL PORT FACILITY... 27,000 0 27,000

Air Force Reserve.................. Louisiana............... Barksdale Air Force 307 BW MEDICAL FACILITY 0 7,000 7,000

Base. ADDITION.

Air Force Reserve.................. Ohio.................... Youngstown Air Reserve BASE FIRE STATION (P&D) 0 2,500 2,500

Station.

Air Force Reserve.................. Texas................... Naval Air Station Joint LRS WAREHOUSE.......... 16,000 0 16,000

Reserve Base Fort

Worth.

Air Force Reserve.................. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 12,146 0 12,146

Locations.

Air Force Reserve.................. Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 9,926 0 9,926

Locations. MILITARY CONSTRUCTION.

--------------------------

........................ ....................... Subtotal Military 291,572 18,000 309,572

Construction, Air

Force Reserve.

NATO SECURITY INVESTMENT PROGRAM ........................ ....................... ....................... ........... ........... ...........

NATO............................... Worldwide Unspecified... NATO Security NATO SECURITY 293,434 0 293,434

Investment Program. INVESTMENT PROGRAM.

........................ ....................... Subtotal NATO Security 293,434 0 293,434

Investment Program.

INDOPACIFIC COMBATANT COMMAND ........................ ....................... ....................... ........... ........... ...........

MILCON, INDOPACOM.................. Worldwide Unspecified... Unspecified Worldwide INDOPACOM MILITARY 0 150,000 150,000

Locations. CONSTRUCTION PILOT

PROGRAM.

Subtotal Base 0 150,000 150,000

Realignment and

Closure--Defense-Wide.

TOTAL INDOPACIFIC 0 150,000 150,000

COMBATANT COMMAND.

TOTAL MILITARY 14,345,019 2,359,215 16,704,234

CONSTRUCTION.

FAMILY HOUSING

FAMILY HOUSING CONSTRUCTION, ARMY

Fam Hsg Con, Army.................. Georgia................. Fort Eisenhower........ FORT EISENHOWER MHPI 50,000 0 50,000

EQUITY INVESTMENT.

Fam Hsg Con, Army.................. Germany................. Baumholder............. FAMILY HOUSING NEW 78,746 0 78,746

CONSTRUCTION.

Fam Hsg Con, Army.................. Kwajalein............... Kwajalein Atoll........ FAMILY HOUSING 98,600 0 98,600

REPLACEMENT

CONSTRUCTION.

Fam Hsg Con, Army.................. Missouri................ Fort Leonard Wood...... FORT LEONARD WOOD MHPI 50,000 0 50,000

EQUITY INVESTMENT.

Fam Hsg Con, Army.................. Worldwide Unspecified... Unspecified Worldwide FAMILY HOUSING P&D..... 27,549 0 27,549

Locations.

--------------------------

Subtotal Family Housing 304,895 0 304,895

Construction, Army.

FAMILY HOUSING O&M, ARMY

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 12,121 0 12,121

Locations.

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 86,019 0 86,019

Locations. SUPPORT.

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide LEASING................ 112,976 0 112,976

Locations.

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 86,706 0 86,706

Locations.

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 41,121 0 41,121

Locations.

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 554 0 554

Locations.

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide SERVICES............... 7,037 0 7,037

Locations.

Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 38,951 0 38,951

Locations.

--------------------------

Subtotal Family Housing 385,485 0 385,485

Operation And

Maintenance, Army.

FAMILY HOUSING CONSTRUCTION, NAVY &

MARINE CORPS

Fam Hsg Con, Navy & Marine Corps... Guam.................... Joint Region Marianas.. REPLACE ANDERSEN 121,906 0 121,906

HOUSING, PHASE 8.

Fam Hsg Con, Navy & Marine Corps... Guam.................... Naval Support Activity REPLACE ANDERSEN 83,126 0 83,126

Andersen. HOUSING (AF), PHASE 7.

Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide DESIGN, WASHINGTON DC.. 4,782 0 4,782

Locations.

Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide IMPROVEMENTS, 57,740 0 57,740

Locations. WASHINGTON DC.

Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide USMC DPRI/GUAM PLANNING 9,588 0 9,588

Locations. & DESIGN.

--------------------------

Subtotal Family Housing 277,142 0 277,142

Construction, Navy &

Marine Corps.

FAMILY HOUSING O&M, NAVY & MARINE

CORPS

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 17,744 0 17,744

Locations.

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 65,655 0 65,655

Locations. SUPPORT.

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide LEASING................ 60,214 0 60,214

Locations.

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 101,356 0 101,356

Locations.

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 61,896 0 61,896

Locations.

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 419 0 419

Locations.

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide SERVICES............... 13,250 0 13,250

Locations.

Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 43,320 0 43,320

Locations.

--------------------------

Subtotal Family Housing 363,854 0 363,854

Operation &

Maintenance, Navy &

Marine Corps.

FAMILY HOUSING CONSTRUCTION, AIR

FORCE

Fam Hsg Con, Air Force............. Alabama................. Maxwell Air Force Base. MHPI RESTRUCTURE-AETC 65,000 0 65,000

GROUP II.

Fam Hsg Con, Air Force............. Colorado................ U.S. Air Force Academy. CONSTRUCTION 9,282 0 9,282

IMPROVEMENT--CARLTON

HOUSE.

Fam Hsg Con, Air Force............. Hawaii.................. Joint Base Pearl Harbor- MHPI RESTRUCTURE-JOINT 75,000 0 75,000

Hickam. BASE PEARL HARBOR-

HICKAM.

Fam Hsg Con, Air Force............. Mississippi............. Keesler Air Force Base. MHPI RESTRUCTURE- 80,000 0 80,000

SOUTHERN GROUP.

Fam Hsg Con, Air Force............. Japan................... Yokota Air Base........ IMPROVE FAMILY HOUSING 0 27,000 27,000

PAIP 9, PHASE 1 (24

UNITS).

Fam Hsg Con, Air Force............. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 7,815 0 7,815

Locations.

--------------------------

Subtotal Family Housing 237,097 27,000 264,097

Construction, Air

Force.

FAMILY HOUSING O&M, AIR FORCE

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 12,884 11,000 23,884

Locations.

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 31,803 0 31,803

Locations. SUPPORT.

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide LEASING................ 5,143 0 5,143

Locations.

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 135,410 -11,000 124,410

Locations.

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 68,023 0 68,023

Locations.

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 2,377 0 2,377

Locations.

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide SERVICES............... 10,692 0 10,692

Locations.

Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 48,054 0 48,054

Locations.

--------------------------

Subtotal Family Housing 314,386 0 314,386

Operation And

Maintenance, Air Force.

FAMILY HOUSING O&M, DEFENSE-WIDE

Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS (DIA)...... 673 0 673

Locations.

Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS (NSA)...... 89 0 89

Locations.

Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide LEASING (DIA).......... 32,042 0 32,042

Locations.

Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide LEASING (NSA).......... 13,658 0 13,658

Locations.

Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 35 0 35

Locations.

Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide UTILITIES (DIA)........ 4,273 0 4,273

Locations.

Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide UTILITIES (NSA)........ 15 0 15

Locations.

--------------------------

Subtotal Family Housing 50,785 0 50,785

Operation And

Maintenance, Defense-

Wide.

FAMILY HOUSING IMPROVEMENT FUND

Family Housing Improvement Fund.... Worldwide Unspecified... Unspecified Worldwide ADMINISTRATIVE 6,611 0 6,611

Locations. EXPENSES--FHIF.

--------------------------

Subtotal Family Housing 6,611 0 6,611

Improvement Fund.

UNACCOMPANIED HOUSING IMPROVEMENT

FUND

Unaccompanied Housing Improvement Worldwide Unspecified ADMINISTRATIVE 496.................... 0 496

Fund. Unspecified Worldwide EXPENSES--UHIF.

Locations.

--------------------------

Subtotal Unaccompanied 496 0 496

Housing Improvement

Fund.

TOTAL FAMILY HOUSING... 1,940,751 27,000 1,967,751

DEFENSE BASE REALIGNMENT AND CLOSURE

BASE REALIGNMENT AND CLOSURE, ARMY

BRAC, Army......................... Worldwide Unspecified BASE REALIGNMENT AND 150,640................ 0 150,640

Unspecified Worldwide CLOSURE.

Locations.

--------------------------

Subtotal Base 150,640 0 150,640

Realignment and

Closure--Army.

BASE REALIGNMENT AND CLOSURE, NAVY

BRAC, Navy......................... Worldwide Unspecified... Unspecified Worldwide BASE REALIGNMENT AND 108,818 0 108,818

Locations. CLOSURE.

--------------------------

Subtotal Base 108,818 0 108,818

Realignment and

Closure--Navy.

BASE REALIGNMENT AND CLOSURE, AIR

FORCE

BRAC, Air Force.................... Worldwide Unspecified... Unspecified Worldwide BASE REALIGNMENT AND 123,990 0

Locations. CLOSURE.

--------------------------

Subtotal Base 123,990 0 123,990

Realignment and

Closure--Air Force.

BASE REALIGNMENT AND CLOSURE, DEFENSE-

WIDE

BRAC, Defense-Wide................. Worldwide Unspecified... Unspecified Worldwide INT-4: DLA ACTIVITIES.. 5,726 0 5,726

Locations.

--------------------------

Subtotal Base 5,726 0 5,726

Realignment and

Closure--Defense-Wide.

TOTAL DEFENSE BASE 389,174 0 389,174

REALIGNMENT AND

CLOSURE.

TOTAL MILITARY 16,674,944 2,386,215 19,061,159

CONSTRUCTION, FAMILY

HOUSING, AND BRAC.

--------------------------------------------------------------------------------------------------------------------------------------------------------

TITLE XXI--ARMY MILITARY CONSTRUCTION

SEC. 2101. AUTHORIZED ARMY CONSTRUCTION AND LAND ACQUISITION

PROJECTS.

(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:

Army: Inside the United States

----------------------------------------------------------------------------------------------------------------

State Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

Alabama........................................ Redstone Arsenal.............................. $50,000,000

Florida........................................ Eglin Air Force Base.......................... $75,000,000

Georgia........................................ Fort Eisenhower............................... $163,000,000

Hawaii......................................... Aliamanu Military Reservation................. $20,000,000

Fort Shafter.................................. $23,000,000

Helemano Military Reservation................. $33,000,000

Schofield Barracks............................ $37,000,000

Illinois....................................... Rock Island Arsenal........................... $44,000,000

Kansas......................................... Fort Riley.................................... $105,000,000

Kentucky....................................... Fort Campbell................................. $38,000,000

Louisiana...................................... Fort Johnson.................................. $119,400,000

Maryland....................................... Fort Meade.................................... $50,000,000

Massachusetts.................................. Soldier Systems Center Natick................. $18,500,000

Michigan....................................... Detroit Arsenal............................... $72,000,000

New York....................................... Fort Hamilton................................. $25,000,000

North Carolina................................. Fort Liberty.................................. $193,500,000

Pennsylvania................................... Letterkenny Army Depot........................ $89,000,000

South Carolina................................. Fort Jackson.................................. $41,000,000

Texas.......................................... Fort Bliss.................................... $74,000,000

Red River Army Depot.......................... $113,000,000

Virginia....................................... Fort Belvoir.................................. $40,000,000

Joint Base Myer - Henderson Hall.............. $177,000,000

Washington..................................... Joint Base Lewis - McChord.................... $100,000,000

----------------------------------------------------------------------------------------------------------------

(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:

Army: Outside the United States

----------------------------------------------------------------------------------------------------------------

Country Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

Germany........................................ Grafenwoehr................................... $10,400,000

Hohenfels..................................... $56,000,000

Pulaski Barracks.............................. $25,000,000

----------------------------------------------------------------------------------------------------------------

(c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Army may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code:

Army Prototype Project

----------------------------------------------------------------------------------------------------------------

State Installation Amount

----------------------------------------------------------------------------------------------------------------

North Carolina................................. Fort Liberty.................................. $85,000,000

----------------------------------------------------------------------------------------------------------------

SEC. 2102. FAMILY HOUSING.

(a) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may construct or acquire family housing units (including land acquisition and supporting facilities) at the installations or locations, in the number of units, and in the amounts set forth in the following table:

Army: Family Housing

----------------------------------------------------------------------------------------------------------------

Country Installation or Location Units Amount

----------------------------------------------------------------------------------------------------------------

Germany................................ Baumholder................. Family Housing New $78,746,000

Construction............

Kwajalein.............................. Kwajalein Atoll............ Family Housing $98,600,000

Replacement Construction

----------------------------------------------------------------------------------------------------------------

(b) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may improve existing military family housing units in an amount not to exceed

$100,000,000.

(c) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $27,549,000.

SEC. 2103. AUTHORIZATION OF APPROPRIATIONS, ARMY.

(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Army as specified in the funding table in section 4601.

(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2101 of this Act may not exceed the total amount authorized to be appropriated under subsection

(a), as specified in the funding table in section 4601.

SEC. 2104. EXTENSION OF AUTHORITY TO USE CASH PAYMENTS IN

SPECIAL ACCOUNT FROM LAND CONVEYANCE, NATICK

SOLDIER SYSTEMS CENTER, MASSACHUSETTS.

Section 2844(c)(2)(C) of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1865) is amended by striking ``October 1, 2025'' and inserting ``October 1, 2027''.

SEC. 2105. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR

2018 PROJECT AT KUNSAN AIR BASE, KOREA.

(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018

(division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in subsection (b), as provided in section 2101(b) of that Act (131 Stat. 1819) and extended and modified by subsections (a) and (b) of section 2106 of the Military Construction Act for Fiscal Year 2023

(division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(b) Table.--The table referred to in subsection (a) is as follows:

Army: Extension of 2018 Project Authorization

----------------------------------------------------------------------------------------------------------------

Original

Country Installation or Location Project Authorized Amount

----------------------------------------------------------------------------------------------------------------

Korea................................. Kunsan Air Base........... Unmanned Aerial Vehicle $53,000,000

Hangar..................

----------------------------------------------------------------------------------------------------------------

SEC. 2106. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2019 PROJECTS.

(a) Army Construction and Land Acquisition.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2101 of that Act (132 Stat. 2241), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Army: Extension of 2019 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

State/Country Installation or Location Project Authorized Amount

----------------------------------------------------------------------------------------------------------------

Korea................................. Camp Tango................ Command and Control $17,500,000

Facility................

Maryland.............................. Fort Meade................ Cantonment Area Roads.... $16,500,000

----------------------------------------------------------------------------------------------------------------

(b) Overseas Contingency Operations.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2901 of that Act (132 Stat. 2286), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Army: Extension of 2019 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

Country Installation or Location Project Authorized Amount

----------------------------------------------------------------------------------------------------------------

Bulgaria.............................. Nevo Selo FOS............. EDI: Ammunition Holding $5,200,000

Area....................

Romania............................... Mihail Kogalniceanu FOS... EDI: Explosives & Ammo $21,651,000

Load/Unload Apron.......

----------------------------------------------------------------------------------------------------------------

SEC. 2107. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2021 PROJECTS.

(a) Army Construction and Land Acquisition.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2101(a) of that Act (134 Stat. 4295), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Army: Extension of 2021 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

State Installation or Location Project Authorized Amount

----------------------------------------------------------------------------------------------------------------

Arizona............................... Yuma Proving Ground....... Ready Building........... $14,000,000

Georgia............................... Fort Gillem............... Forensic Lab............. $71,000,000

Louisiana............................. Fort Johnson.............. Information Systems $25,000,000

Facility................

----------------------------------------------------------------------------------------------------------------

(b) Child Development Center, Georgia.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorization under section 2865 of that Act (10 U.S.C. 2802 note) for the project described in paragraph (2) in Fort Eisenhower, Georgia, shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Project described.--The project described in this paragraph is the following:

Army: Extension of 2021 Project Authorization

----------------------------------------------------------------------------------------------------------------

Original

State Installation or Location Project Authorized Amount

----------------------------------------------------------------------------------------------------------------

Georgia............................... Fort Eisenhower........... Child Development Center. $21,000,000

----------------------------------------------------------------------------------------------------------------

TITLE XXII--NAVY MILITARY CONSTRUCTION

SEC. 2201. AUTHORIZED NAVY CONSTRUCTION AND LAND ACQUISITION

PROJECTS.

(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:

Navy: Inside the United States

----------------------------------------------------------------------------------------------------------------

State Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

California.................................. Marine Corps Air Ground Combat Center Twentynine $42,100,000

Palms...........................................

Marine Corps Base Camp Pendleton................. $26,825,000

Port Hueneme..................................... $110,000,000

Connecticut................................. Naval Submarine Base New London.................. $331,718,000

District of Columbia........................ Marine Barracks Washington....................... $131,800,000

Florida..................................... Naval Air Station Whiting Field.................. $141,500,000

Georgia..................................... Marine Corps Logistics Base Albany............... $63,970,000

Guam........................................ Andersen Air Force Base.......................... $497,620,000

Joint Region Marianas............................ $174,540,000

Naval Base Guam.................................. $946,500,000

Hawaii...................................... Marine Corps Base Kaneohe Bay.................... $227,350,000

Maryland.................................... Fort Meade....................................... $186,480,000

Naval Air Station Patuxent River................. $141,700,000

North Carolina.............................. Marine Corps Air Station Cherry Point............ $270,150,000

Marine Corps Base Camp Lejeune................... $215,670,000

Pennsylvania................................ Naval Surface Warfare Center Philadelphia........ $88,200,000

Virginia.................................... Dam Neck Annex................................... $109,680,000

Joint Expeditionary Base Little Creek - Fort $35,000,000

Story.

Marine Corps Base Quantico....................... $127,120,000

Naval Station Norfolk............................ $158,095,000

Naval Weapons Station Yorktown................... $221,920,000

Washington.................................. Naval Base Kitsap................................ $245,000,000

----------------------------------------------------------------------------------------------------------------

(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:

Navy: Outside the United States

----------------------------------------------------------------------------------------------------------------

Country Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

Djibouti.................................... Camp Lemonnier................................... $106,600,000

Italy....................................... Naval Air Station Sigonella...................... $77,072,000

----------------------------------------------------------------------------------------------------------------

(c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Navy may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code:

Navy Prototype Project

----------------------------------------------------------------------------------------------------------------

State Installation Amount

----------------------------------------------------------------------------------------------------------------

Virginia.................................... Joint Expeditionary Base Little Creek - Fort $35,000,000

Story...........................................

----------------------------------------------------------------------------------------------------------------

SEC. 2202. FAMILY HOUSING.

(a) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may construct or acquire family housing units (including land acquisition and supporting facilities) at the installations or locations, in the number of units, and in the amounts set forth in the following table:

Navy: Family Housing

----------------------------------------------------------------------------------------------------------------

Installation or

Country Location Units Amount

----------------------------------------------------------------------------------------------------------------

Guam................................. Joint Region Marianas.. Replace Andersen $121,906,000

Housing Ph 8..........

Mariana Islands........ Replace Andersen $83,126,000

Housing (AF) PH7.

----------------------------------------------------------------------------------------------------------------

(b) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may improve existing military family housing units in an amount not to exceed

$57,740,000.

(c) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $14,370,000.

SEC. 2203. AUTHORIZATION OF APPROPRIATIONS, NAVY.

(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Navy, as specified in the funding table in section 4601.

(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2201 of this Act may not exceed the total amount authorized to be appropriated under subsection

(a), as specified in the funding table in section 4601.

SEC. 2204. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2019 PROJECTS.

(a) Navy Construction and Land Acquisition Projects.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2201 of that Act (132 Stat. 2243), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Navy: Extension of 2019 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

State/Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

Bahrain.............................. SW Asia................ Fleet Maintenance $26,340,000

Facility & TOC.

North Carolina....................... Marine Corps Base Camp 2nd Radio BN Complex, $51,300,000

Lejeune. Phase 2.

South Carolina....................... Marine Corps Air Recycling/Hazardous $9,517,000

Station Beaufort. Waste Facility.

Washington........................... Bangor................. Pier and Maintenance $88,960,000

Facility.

----------------------------------------------------------------------------------------------------------------

(b) Laurel Bay Fire Station, South Carolina.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorization under section 2810 of that Act (132 Stat. 2266) for the project described in paragraph (2) shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Project described.--The project described in this paragraph is the following::

Navy: Extension of 2019 Project Authorization

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

State Location Project Amount

----------------------------------------------------------------------------------------------------------------

South Carolina....................... Marine Corps Air Laurel Bay Fire Station $10,750,000

Station Beaufort.

----------------------------------------------------------------------------------------------------------------

(c) Overseas Contingency Operations.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorization set forth in the table in paragraph (2), as provided in section 2902 of that Act (132 Stat. 2286), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Navy: Extension of 2019 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

Greece............................... Naval Support Activity EDI: Joint Mobility $41,650,000

Souda Bay. Processing Center.

----------------------------------------------------------------------------------------------------------------

SEC. 2205. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2021 PROJECTS.

(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in subsection (b), as provided in section 2201 of that Act (134 Stat. 4297), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(b) Table.--The table referred to in subsection (a) is as follows:

Navy: Extension of 2021 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

State/Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

California........................... Twentynine Palms....... Wastewater Treatment $76,500,000

Plant.

Guam................................. Joint Region Marianas.. Joint Communication $166,000,000

Upgrade.

Maine................................ NCTAMS LANT Detachment Perimeter Security..... $26,100,000

Cutler.

Nevada............................... Fallon................. Range Training Complex, $29,040,000

Phase I.

----------------------------------------------------------------------------------------------------------------

TITLE XXIII--AIR FORCE MILITARY CONSTRUCTION

SEC. 2301. AUTHORIZED AIR FORCE CONSTRUCTION AND LAND

ACQUISITION PROJECTS.

(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:

Air Force: Inside the United States

----------------------------------------------------------------------------------------------------------------

State Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

District of Columbia.......................... Joint Base Anacostia - Bolling.................. $50,000,000

Florida....................................... MacDill Air Force Base.......................... $131,000,000

Patrick Space Force Base........................ $27,000,000

Tyndall Air Force Base.......................... $252,000,000

Georgia....................................... Robins Air Force Base........................... $115,000,000

Guam.......................................... Joint Region Marianas........................... $411,000,000

Massachusetts................................. Hanscom Air Force Base.......................... $37,000,000

Mississippi................................... Columbus Air Force Base......................... $39,500,000

Montana....................................... Malmstrom Air Force Base........................ $10,300,000

South Dakota.................................. Ellsworth Air Force Base........................ $235,000,000

Texas......................................... Joint Base San Antonio - Lackland............... $314,000,000

Utah.......................................... Hill Air Force Base............................. $488,000,000

Wyoming....................................... F.E. Warren Air Force Base...................... $85,000,000

----------------------------------------------------------------------------------------------------------------

(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:

Air Force: Outside the United States

----------------------------------------------------------------------------------------------------------------

Country Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

Australia..................................... Royal Australian Air Force Base Darwin.......... $26,000,000

Royal Australian Air Force Base Tindal.......... $130,500,000

Norway........................................ Rygge Air Station............................... $119,000,000

Philippines................................... Cesar Basa Air Base............................. $35,000,000

Spain......................................... Moron Air Base.................................. $26,000,000

United Kingdom................................ Royal Air Force Fairford........................ $47,000,000

Royal Air Force Lakenheath...................... $78,000,000

----------------------------------------------------------------------------------------------------------------

(c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Air Force may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code:

Air Force Prototype Project

----------------------------------------------------------------------------------------------------------------

State Installation Amount

----------------------------------------------------------------------------------------------------------------

Massachusetts................................. Hanscom Air Force Base.......................... $37,000,000

----------------------------------------------------------------------------------------------------------------

SEC. 2302. FAMILY HOUSING.

(a) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may improve existing military family housing units in an amount not to exceed $249,928,200.

(b) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $7,815,000.

(c) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may construct or acquire family housing units (including land acquisition and supporting facilities) at the installation and in the amount set forth in the following table:

Air Force: Family Housing

----------------------------------------------------------------------------------------------------------------

Country Installation Amount

----------------------------------------------------------------------------------------------------------------

Japan......................................... Yokota Air Base................................. $27,000,000

----------------------------------------------------------------------------------------------------------------

SEC. 2303. AUTHORIZATION OF APPROPRIATIONS, AIR FORCE.

(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Air Force, as specified in the funding table in section 4601.

(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2301 of this Act may not exceed the total amount authorized to be appropriated under subsection

(a), as specified in the funding table in section 4601.

SEC. 2304. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2017 PROJECTS.

(a) Air Force Construction and Land Acquisition Projects.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2017

(division B of Public Law 114-328; 130 Stat. 2688), the authorizations set forth in the table in paragraph (2), as provided in section 2301(b) of that Act (130 Stat. 2697) and extended by section 2304 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117-181; 135 Stat. 2169), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2017 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

Country Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Germany............................... Ramstein Air Base......... 37 AS Squadron Operations/ $13,437,000

Aircraft Maintenance

Unit....................

Spangdahlem Air Base...... Upgrade Hardened Aircraft $2,700,000

Shelters for F/A-22.....

Japan................................. Yokota Air Force Base..... C-130J Corrosion Control $23,777,000

Hangar..................

----------------------------------------------------------------------------------------------------------------

(b) Overseas Contingency Operations.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2017

(division B of Public Law 114-328; 130 Stat. 2688), the authorization set forth in the table in paragraph (2), as provided in section 2902 of that Act (130 Stat. 2743) and extended by section 2304 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117-181; 135 Stat. 2169), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2017 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

Country Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Germany............................... Spangdahlem Air Base...... F/A-22 Low Observable/ $12,000,000

Composite Repair

Facility................

----------------------------------------------------------------------------------------------------------------

SEC. 2305. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2018 PROJECTS.

(a) Air Force Construction and Land Acquisition Projects.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018

(division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in paragraph (2), as provided in section 2301(a) of that Act (131 Stat. 1825) and extended by section 2304(a) of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2018 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

State Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Florida............................... Tyndall Air Force Base.... Fire Station............. $17,000,000

----------------------------------------------------------------------------------------------------------------

(b) Overseas Contingency Operations.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018

(division B of Public Law 115-91; 131 Stat. 1817), the authorizations set forth in the table in paragraph (2), as provided in section 2903 of that Act (131 Stat. 1876) and extended by section 2304(b) of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2018 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

Country Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Hungary............................... Kecskemet Air Base........ ERI: Airfield Upgrades... $12,900,000

Kecskemet Air Base........ ERI: Construct Parallel $30,000,000

Taxiway.................

Kecskemet Air Base........ ERI: Increase POL Storage $12,500,000

Capacity................

Luxembourg............................ Sanem..................... ERI: ECAOS Deployable $67,400,000

Airbase System Storage..

Slovakia.............................. Malacky................... ERI: Airfield Upgrades... $4,000,000

Malacky................... ERI: Increase POL Storage $20,000,000

Capacity................

----------------------------------------------------------------------------------------------------------------

SEC. 2306. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2019 PROJECTS.

(a) Air Force Construction and Land Acquisition Projects.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2301 of that Act (132 Stat. 2246), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2019 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

State/Country Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Mariana Islands....................... Tinian.................... APR-Cargo Pad with $46,000,000

Taxiway Extension.......

Tinian.................... APR-Maintenance Support $4,700,000

Facility................

Maryland.............................. Joint Base Andrews........ Child Development Center. $13,000,000

Joint Base Andrews........ PAR Relocate Haz Cargo $37,000,000

Pad and EOD Range.......

New Mexico............................ Holloman Air Force Base... MQ-9 FTU Ops Facility.... $85,000,000

Kirtland Air Force Base... Wyoming Gate Upgrade for $7,000,000

Anti-Terrorism

Compliance..............

United Kingdom........................ Royal Air Force Lakenheath F-35 ADAL Conventional $9,204,000

Munitions MX............

Utah.................................. Hill Air Force Base....... Composite Aircraft $26,000,000

Antenna Calibration Fac.

----------------------------------------------------------------------------------------------------------------

(b) Overseas Contingency Operations.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2903 of that Act (132 Stat. 2287), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2019 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

Country Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Slovakia.............................. Malacky................... EDI: Regional Munitions $59,000,000

Storage Area............

United Kingdom........................ RAF Fairford.............. EDI: Construct DABS-FEV $87,000,000

Storage.................

RAF Fairford.............. EDI: Munitions Holding $19,000,000

Area....................

----------------------------------------------------------------------------------------------------------------

SEC. 2307. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2021 PROJECTS.

(a) Air Force Construction and Land Acquisition Project.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorization set forth in the table in paragraph (2), as provided in section 2301 of that Act (134 Stat. 4299), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2021 Project Authorization

----------------------------------------------------------------------------------------------------------------

Original

State Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Virginia.............................. Joint Base Langley - Access Control Point Main $19,500,00

Eustis................... Gate with Lang Acq......

----------------------------------------------------------------------------------------------------------------

(b) Overseas Contingency Operations.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2902 of that Act (134 Stat. 4373), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Air Force: Extension of 2021 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Original

Country Installation or Location Project Authorized

Amount

----------------------------------------------------------------------------------------------------------------

Germany............................... Ramstein.................. EDI: Rapid Airfield $36,345,000

Damage Repair Storage...

Spangdahlem Air Base...... EDI: Rapid Airfield $25,824,000

Damage Repair Storage...

----------------------------------------------------------------------------------------------------------------

TITLE XXIV--DEFENSE AGENCIES MILITARY CONSTRUCTION

SEC. 2401. AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND

ACQUISITION PROJECTS.

(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of Defense may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:

Defense Agencies: Inside the United States

----------------------------------------------------------------------------------------------------------------

State Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

Alabama..................................... Redstone Arsenal.............................. $147,975,000

California.................................. Marine Corps Air Station Miramar.............. $103,000,000

Naval Base Coronado........................... $51,000,000

Naval Base San Diego.......................... $101,644,000

Delaware.................................... Dover Air Force Base.......................... $30,500,000

Maryland.................................... Fort Meade.................................... $885,000,000

Joint Base Andrews............................ $38,300,000

Montana..................................... Great Falls International Airport............. $30,000,000

North Carolina.............................. Marine Corps Base Camp Lejeune................ $70,000,000

Utah........................................ Hill Air Force Base........................... $14,200,000

Virginia.................................... Fort Belvoir.................................. $185,000,000

Joint Expeditionary Base Little Creek - Fort $61,000,000

Story.

Pentagon...................................... $30,600,000

Washington.................................. Joint Base Lewis - McChord.................... $62,000,000

Manchester.................................... $71,000,000

Naval Undersea Warfare Center Keyport......... $37,000,000

----------------------------------------------------------------------------------------------------------------

(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of Defense may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:

Defense Agencies: Outside the United States

----------------------------------------------------------------------------------------------------------------

Country Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

Cuba......................................... Guantanamo Bay Naval Station.................. $257,000,000

Germany...................................... Baumholder.................................... $57,700,000

Ramstein Air Base............................. $181,764,000

Honduras..................................... Soto Cano Air Base............................ $41,300,000

Japan........................................ Kadena Air Base............................... $100,300,000

Spain........................................ Naval Station Rota............................ $80,000,000

----------------------------------------------------------------------------------------------------------------

SEC. 2402. AUTHORIZED ENERGY RESILIENCE AND CONSERVATION

INVESTMENT PROGRAM PROJECTS.

(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for energy conservation projects as specified in the funding table in section 4601, the Secretary of Defense may carry out energy conservation projects under chapter 173 of title 10, United States Code, for the installations or locations inside the United States, and in the amounts, set forth in the following table:

ERCIP Projects: Inside the United States

----------------------------------------------------------------------------------------------------------------

State Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

California.................................. Marine Corps Air Station Miramar.............. $30,550,000

Mountain View................................. $15,500,000

Naval Base San Diego.......................... $6,300,000

Vandenberg Space Force Base................... $57,000,000

Colorado.................................... Buckley Space Force Base...................... $14,700,000

Florida..................................... Naval Air Station Whiting Field............... $31,220,000

Georgia..................................... Naval Submarine Base Kings Bay................ $49,500,000

Kansas...................................... Forbes Field.................................. $5,850,000

Missouri.................................... Lake City Army Ammunition Plant............... $80,100,000

Nebraska.................................... Offutt Air Force Base......................... $41,000,000

New Jersey.................................. Sea Girt...................................... $44,000,000

North Carolina.............................. Fort Liberty (Camp Mackall)................... $10,500,000

Oklahoma.................................... Fort Sill..................................... $76,650,000

Puerto Rico................................. Fort Buchanan................................. $56,000,000

Texas....................................... Fort Cavazos.................................. $50,250,000

Utah........................................ Camp Williams................................. $20,100,000

Virginia.................................... Pentagon...................................... $2,250,000

Washington.................................. Joint Base Lewis - McChord.................... $49,850,000

Naval Base Kitsap............................. $31,520,000

Naval Magazine Indian Island.................. $37,770,000

Wyoming..................................... F.E. Warren Air Force Base.................... $25,000,000

----------------------------------------------------------------------------------------------------------------

(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for energy conservation projects as specified in the funding table in section 4601, the Secretary of Defense may carry out energy conservation projects under chapter 173 of title 10, United States Code, for the installations or locations outside the United States, and in the amounts, set forth in the following table:

ERCIP Projects: Outside the United States

----------------------------------------------------------------------------------------------------------------

Country Installation or Location Amount

----------------------------------------------------------------------------------------------------------------

Diego Garcia................................. Naval Support Facility Diego Garcia........... $16,820,000

Korea........................................ K-16 Air Base................................. $5,650,000

Kuwait....................................... Camp Buehring................................. $18,850,000

----------------------------------------------------------------------------------------------------------------

(c) Improvement of Conveyed Utility Systems.--In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table:

Improvement of Conveyed Utility Systems

----------------------------------------------------------------------------------------------------------------

State Installation or Location Project

----------------------------------------------------------------------------------------------------------------

Nebraska..................................... Offutt Air Force Base......................... Microgrid and

Backup Power

North Carolina............................... Fort Liberty (Camp Mackall)................... Microgrid and

Backup Power

Texas........................................ Fort Cavazos.................................. Microgrid and

Backup Power

Washington................................... Joint Base Lewis - McChord.................... Power Generation

and Microgrid

----------------------------------------------------------------------------------------------------------------

SEC. 2403. AUTHORIZATION OF APPROPRIATIONS, DEFENSE AGENCIES.

(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of Defense (other than the military departments), as specified in the funding table in section 4601.

(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2401 of this Act may not exceed the total amount authorized to be appropriated under subsection

(a), as specified in the funding table in section 4601.

SEC. 2404. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2018 PROJECTS.

(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018

(division B of Public Law 115-91; 131 Stat. 1817), the authorizations set forth in the table in subsection (b), as provided in section 2401(b) of that Act (131 Stat. 1829) and extended by section 2404 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(b) Table.--The table referred to in subsection (a) is as follows:

Defense Agencies: Extension of 2018 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

Japan................................ Iwakuni................ Construct Bulk Storage $30,800,000

Tanks PH 1............

Puerto Rico.......................... Punta Borinquen........ Ramey Unit School $61,071,000

Replacement...........

----------------------------------------------------------------------------------------------------------------

SEC. 2405. EXTENSION AND MODIFICATION OF AUTHORITY TO CARRY

OUT CERTAIN FISCAL YEAR 2019 PROJECTS.

(a) Extension.--

(1) In general.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2401(b) of that Act (132 Stat. 2249), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Defense Agencies: Extension of 2019 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

Germany.............................. Baumholder............. SOF Joint Parachute $11,504,000

Rigging Facility......

Japan................................ Camp McTureous......... Betchel Elementary $94,851,000

School................

Iwakuni................ Fuel Pier............. $33,200,000

----------------------------------------------------------------------------------------------------------------

(b) Modification of Authority to Carry Out Fiscal Year 2019 Project in Baumholder, Germany.--

(1) Modification of project authority.--In the case of the authorization contained in the table in section 2401(b) of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2249) for Baumholder, Germany, for construction of a SOF Joint Parachute Rigging Facility, the Secretary of Defense may construct a 3,200 square meter facility.

(2) Modification of project amounts.--

(A) Division b table.--The authorization table in section 2401(b) of the Military Construction Defense Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2249), as extended pursuant to subsection (a), is amended in the item relating to Baumholder, Germany, by striking ``$11,504,000'' and inserting ``$23,000,000'' to reflect the project modification made by paragraph (1).

(B) Division d table.--The funding table in section 4601 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115-232; 132 Stat. 2406) is amended in the item relating to Defense-wide, Baumholder, Germany, SOF Joint Parachute Rigging Facility, by striking

``$11,504'' in the Conference Authorized column and inserting

``$23,000'' to reflect the project modification made by paragraph (1).

SEC. 2406. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2021 PROJECTS.

(a) Defense Agencies Construction and Land Acquisition Project.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorization set forth in the table in paragraph (2), as provided in section 2401(b) of that Act (134 Stat. 4305), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in paragraph (1) is as follows:

Defense Agencies: Extension of 2021 Project Authorization

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

Japan................................ Def Fuel Support Point Fuel Wharf............. $49,500,000

Tsurumi...............

----------------------------------------------------------------------------------------------------------------

(b) Energy Resilience and Conservation Investment Program Projects.--

(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2402 of that Act (134 Stat. 4306), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(2) Table.--The table referred to in subsection (a) is as follows:

ERCIP Projects: Extension of 2021 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

State/Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

Arkansas............................. Ebbing Air National PV Arrays and Battery $2,600,000

Guard Base............ Storage...............

California........................... Marine Corps Air Ground Install 10 Mw Battery $11,646,000

Combat Center Energy Storage for

Twentynine Palms...... Various Buildings.....

Military Ocean Terminal Military Ocean Terminal $29,000,000

Concord............... Concord Microgrid.....

Naval Support Activity Cogeneration Plant at $10,540,000

Monterey.............. B236..................

Italy................................ Naval Support Activity Smart Grid............. $3,490,000

Naples................

Nevada............................... Creech Air Force Base.. Central Standby $32,000,000

Generators............

Virginia............................. Naval Medical Center Retro Air Handling $611,000

Portsmouth............ Units From Constant

Volume; Reheat to

Variable Air Volume...

----------------------------------------------------------------------------------------------------------------

SEC. 2407. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2022 PROJECTS.

In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table:

Improvement of Conveyed Utility Systems

----------------------------------------------------------------------------------------------------------------

State Installation or Location Project

----------------------------------------------------------------------------------------------------------------

Alabama...................................... Fort Novosel.................................. Construct a 10 MW

RICE Generator

Plant and Micro-

Grid Controls

Georgia...................................... Fort Moore.................................... Construct 4.8MW

Generation and

Microgrid

Fort Stewart................................. Construct a 10 MW

Generation Plant,

with Microgrid

Controls

New York..................................... Fort Drum..................................... Well Field

Expansion Project

North Carolina............................... Fort Liberty.................................. Construct 10 MW

Microgrid

Utilizing

Existing and New

Generators

Fort Liberty.................................. Fort Liberty

Emergency Water

System

----------------------------------------------------------------------------------------------------------------

SEC. 2408. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2023 PROJECTS.

In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table:

Improvement of Conveyed Utility Systems

----------------------------------------------------------------------------------------------------------------

State Installation or Location Project

----------------------------------------------------------------------------------------------------------------

Georgia...................................... Fort Stewart - Hunter Army Airfield........... Power Generation

and Microgrid

Kansas....................................... Fort Riley.................................... Power Generation

and Microgrid

Texas........................................ Fort Cavazos.................................. Power Generation

and Microgrid

----------------------------------------------------------------------------------------------------------------

TITLE XXVI--GUARD AND RESERVE FORCES FACILITIES

SEC. 2601. AUTHORIZED ARMY NATIONAL GUARD CONSTRUCTION AND

LAND ACQUISITION PROJECTS.

Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the Army National Guard locations inside the United States, and in the amounts, set forth in the following table:

Army National Guard

----------------------------------------------------------------------------------------------------------------

State Location Amount

----------------------------------------------------------------------------------------------------------------

Arizona..................................... Surprise Readiness Center........................ $15,000,000

Florida..................................... Camp Blanding.................................... $11,000,000

Idaho....................................... Jerome County Regional Site...................... $17,000,000

Illinois.................................... North Riverside Armory........................... $24,000,000

Kentucky Burlington....................................... $16,400,000

Mississippi Southaven........................................ $22,000,000

Missouri.................................... Belle Fontaine................................... $28,000,000

New Hampshire............................... Littleton........................................ $23,000,000

New Mexico.................................. Rio Rancho Training Site......................... $11,000,000

New York.................................... Lexington Avenue Armory.......................... $90,000,000

Ohio........................................ Camp Perry Joint Training Center................. $19,200,000

Oregon Washington County Readiness Center............... $26,000,000

Pennsylvania................................ Hermitage Readiness Center....................... $13,600,000

Rhode Island................................ North Kingstown.................................. $30,000,000

South Carolina.............................. Aiken County Readiness Center.................... $20,000,000

McCrady Training Center.......................... $7,900,000

Virginia.................................... Sandston RC & FMS 1.............................. $20,000,000

Wisconsin................................... Viroqua.......................................... $18,200,000

----------------------------------------------------------------------------------------------------------------

SEC. 2602. AUTHORIZED ARMY RESERVE CONSTRUCTION AND LAND

ACQUISITION PROJECTS.

Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the Army Reserve locations inside the United States, and in the amounts, set forth in the following table:

Army Reserve

----------------------------------------------------------------------------------------------------------------

State Location Amount

----------------------------------------------------------------------------------------------------------------

Alabama..................................... Birmingham....................................... $57,000,000

Arizona..................................... San Tan Valley................................... $12,000,000

California.................................. Fort Hunter Liggett.............................. $40,000,000

Parks Reserve Forces Training Area............... $35,000,000

Georgia..................................... Marine Corps Logistics Base Albany.............. $40,000,000

Massachusetts............................... Devens Reserve Forces Training Area............. $39,000,000

Puerto Rico................................. Fort Buchanan.................................... $39,000,000

----------------------------------------------------------------------------------------------------------------

SEC. 2603. AUTHORIZED NAVY RESERVE AND MARINE CORPS RESERVE

CONSTRUCTION AND LAND ACQUISITION PROJECTS.

Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the Navy Reserve and Marine Corps Reserve locations inside the United States, and in the amounts, set forth in the following table:

Navy Reserve and Marine Corps Reserve

----------------------------------------------------------------------------------------------------------------

State Location Amount

----------------------------------------------------------------------------------------------------------------

Michigan.................................... Battle Creek..................................... $24,549,000

Virginia.................................... Marine Forces Reserve Dam Neck Virginia Beach.... $12,400,000

----------------------------------------------------------------------------------------------------------------

SEC. 2604. AUTHORIZED AIR NATIONAL GUARD CONSTRUCTION AND

LAND ACQUISITION PROJECTS.

Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the Air National Guard locations inside the United States, and in the amounts, set forth in the following table:

Air National Guard

----------------------------------------------------------------------------------------------------------------

State Location Amount

----------------------------------------------------------------------------------------------------------------

Alabama..................................... Montgomery Regional Airport...................... $7,000,000

Alaska...................................... Joint Base Elmendorf - Richardson................ $7,000,000

Arizona..................................... Tucson International Airport..................... $11,600,000

Arkansas.................................... Ebbing Air National Guard Base................... $76,000,000

Colorado.................................... Buckley Space Force Base......................... $12,000,000

Georgia..................................... Savannah/Hilton Head International Airport....... $27,000,000

Indiana..................................... Fort Wayne International Airport................. $8,900,000

Oregon...................................... Portland International Airport................... $71,500,000

Pennsylvania................................ Harrisburg International Airport................. $8,000,000

Wisconsin................................... Truax Field...................................... $5,200,000

----------------------------------------------------------------------------------------------------------------

SEC. 2605. AUTHORIZED AIR FORCE RESERVE CONSTRUCTION AND LAND

ACQUISITION PROJECTS.

Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the Air Force Reserve locations inside the United States, and in the amounts, set forth in the following table:

Air Force Reserve

----------------------------------------------------------------------------------------------------------------

State Location Amount

----------------------------------------------------------------------------------------------------------------

Arizona..................................... Davis - Monthan Air Force Base................... $8,500,000

California.................................. March Air Reserve Base........................... $226,500,000

Guam........................................ Joint Region Marianas............................ $27,000,000

Louisiana................................... Barksdale Air Force Base......................... $7,000,000

Texas....................................... Naval Air Station Joint Reserve Base Fort Worth.. $16,000,000

----------------------------------------------------------------------------------------------------------------

SEC. 2606. AUTHORIZATION OF APPROPRIATIONS, NATIONAL GUARD

AND RESERVE.

Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for the costs of acquisition, architectural and engineering services, and construction of facilities for the Guard and Reserve Forces, and for contributions therefor, under chapter 1803 of title 10, United States Code (including the cost of acquisition of land for those facilities), as specified in the funding table in section 4601.

SEC. 2607. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR

2018 PROJECT AT HULMAN REGIONAL AIRPORT,

INDIANA.

(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018

(division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in subsection (b), as provided in section 2604 of that Act (131 Stat. 1836) and extended by section 2608 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(b) Table.--The table referred to in subsection (a) is as follows:

National Guard and Reserve: Extension of 2018 Project Authorization

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

State Location Project Amount

----------------------------------------------------------------------------------------------------------------

Indiana.............................. Hulman Regional Airport Construct Small Arms $8,000,000

Range.................

----------------------------------------------------------------------------------------------------------------

SEC. 2608. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR

2019 PROJECT AT FRANCIS S. GABRESKI AIRPORT,

NEW YORK.

(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019

(division B of Public Law 115-232; 132 Stat. 2240), the authorization set forth in the table in subsection (b), as provided in section 2604 of that Act (132 Stat. 2255), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(b) Table.--The table referred to in subsection (a) is as follows:

National Guard and Reserve: Extension of 2019 Project Authorization

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

State Location Project Amount

----------------------------------------------------------------------------------------------------------------

New York............................. Francis S. Gabreski Security Forces/Comm. $20,000,000

Airport............... Training Facility.....

----------------------------------------------------------------------------------------------------------------

SEC. 2609. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL

YEAR 2021 PROJECTS.

(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021

(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in subsection (b), as provided in sections 2601, 2602, and 2604 of that Act (134 Stat. 4312, 4313, 4314), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.

(b) Table.--The table referred to in subsection (a) is as follows:

National Guard and Reserve: Extension of 2021 Project Authorizations

----------------------------------------------------------------------------------------------------------------

Installation or Original Authorized

State/Country Location Project Amount

----------------------------------------------------------------------------------------------------------------

Arkansas............................. Fort Chaffee........... National Guard $15,000,000

Readiness Center......

California........................... Bakersfield............ National Guard Vehicle $9,300,000

Maintenance Shop......

Colorado............................. Peterson Space Force National Guard $15,000,000

Base.................. Readiness Center......

Guam................................. Joint Region Marianas.. Space Control Facility $20,000,000

#5....................

Ohio................................. Columbus............... National Guard $15,000,000

Readiness Center......

Massachusetts........................ Devens Reserve Forces Automated Multipurpose $8,700,000

Training Area......... Machine Gun Range.....

North Carolina....................... Asheville.............. Army Reserve Center/ $24,000,000

Land..................

Puerto Rico.......................... Fort Allen............. National Guard $37,000,000

Readiness Center......

South Carolina....................... Joint Base Charleston. National Guard $15,000,000

Readiness Center......

Texas................................ Fort Worth............. Aircraft Maintenance $6,000,000

Hangar Addition/Alt...

Joint Base San Antonio. F-16 Mission Training $10,800,000

Center................

Virgin Islands....................... St. Croix.............. Army Aviation Support $28,000,000

Facility (AASF).......

....................... CST Ready Building..... $11,400,000

----------------------------------------------------------------------------------------------------------------

SEC. 2610. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR

2022 PROJECT AT NICKELL MEMORIAL ARMORY,

KANSAS.

(a) Transfer Authority.--From amounts appropriated for

``Military Construction, Army National Guard'' pursuant to the authorization of appropriations in section 2606 and available as specified in the funding table in section 4601 of the National Defense Authorization Act for Fiscal Year 2022 (Public Law 117-81, 135 Stat. 2315), the Secretary of Defense may transfer not more than $420,000 to an appropriation for ``Military Construction, Air National Guard'' for use for studying, planning, designing, and architect and engineer services for a sensitive compartmented information facility project at Nickell Memorial Armory, Kansas.

(b) Merger of Amounts Transferred.--Any amount transferred under subsection (a) shall be merged with and available for the same purposes, and for the same time period, as the

``Military Construction, Air National Guard'' appropriation to which transferred.

(c) Authority.--Using amounts transferred pursuant to subsection (a), the Secretary of the Air Force may carry out study, planning, design, and architect and engineer services activities for a sensitive compartmented information facility project at Nickell Memorial Armory, Kansas.

SEC. 2611. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR

2023 PROJECT AT CAMP PENDLETON, CALIFORNIA.

In the case of the authorization contained in the table in section 2602 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263) and specified in the funding table in section 4601 of the James M. Inhofe National Defense Authorization Act for Fiscal Year 2023 (Public Law 117-263) for Camp Pendleton, California, for construction of an Area Maintenance Support Activity, the Secretary of the Army may construct a 15,000 square foot facility.

______

SOURCE: Congressional Record Vol. 169, No. 129

The Congressional Record is a unique source of public documentation. It started in 1873, documenting nearly all the major and minor policies being discussed and debated.

Senators' salaries are historically higher than the median US income.

ORGANIZATIONS IN THIS STORY

!RECEIVE ALERTS

The next time we write about any of these orgs, we’ll email you a link to the story. You may edit your settings or unsubscribe at any time.
Sign-up

DONATE

Help support the Metric Media Foundation's mission to restore community based news.
Donate

MORE NEWS