SA 1056. Mr. WICKER (for himself and Mr. Graham) submitted an amendment intended to be proposed by him to the bill S. 2226, to authorize appropriations for fiscal year 2024 for military activities of the Department of Defense, for military construction, and for defense activities of the Department of Energy, to prescribe military personnel strengths for such fiscal year, and for other purposes; which was ordered to lie on the table; as follows:
At the appropriate place in the funding tables, insert the following to raise the topline for implementation of the National Defense Strategy and for other purposes:
--------------------------------------------------------------------------------------------------------------------------------------------------------
FY24 AMT
ACCOUNT LINE PE SAG ($1000S) TITLE/STUB ENTRY UFR?
--------------------------------------------------------------------------------------------------------------------------------------------------------
MSLS................................... 6 .......................... ........... $314.2 PrSM (Inc 1) production ..............
increase.
AMMO................................... 36 .......................... ........... $20.0 M795 155mm artillery ..............
projectile production.
RDA.................................... ........... 0604802A.................. ........... $20.0 Low-drag artillery ..............
guidance kit (XM1210 LR
PGK).
MSLS................................... 20 .......................... ........... $20.0 SB600 production increase ..............
PDW.................................... 78 .......................... ........... $10.9 Marinized SB600.......... ..............
MSLS................................... 17 .......................... ........... $350.0 Additional 1 Patriot fire ..............
unit.
RDDW................................... ........... 0603881C.................. ........... $108.0 All Domain Missile ..............
Warning and Missile
Tracking Architecture
(THAAD).
MSLS................................... 10 .......................... ........... $36.0 JAGM capacity expansion.. ..............
RDA.................................... ........... 02065778A................. ........... $67.0 GMLRS-ER capacity ..............
expansion.
RDA.................................... ........... 0604611A.................. ........... $29.1 Javelin RDTE for F-model ..............
auto gate/fast launch.
MSLS................................... 22 .......................... ........... $87.6 Stinger capacity ..............
expansion--obsolescence.
PANMC.................................. 15 .......................... ........... $350.0 Coyote production ..............
increase.
RDA.................................... ........... 1160402BB................. ........... $27.3 Palletized Field ..............
Artillery Launcher.
RDN.................................... ........... 0604227N.................. ........... $50.0 Harpoon--seeker ..............
development obsolescence
issues.
WPN.................................... 23 .......................... ........... $20.0 Harpoon--additional test ..............
equipment for production
and missile recert.
WPN.................................... 20 .......................... ........... $152.0 AARGM-ER production ..............
increase.
WPN.................................... 20 .......................... ........... $34.0 AARGM-ER special test ..............
equipment.
WPN.................................... 16 .......................... ........... $40.0 NSM production increase.. ..............
WPN.................................... 7 .......................... ........... $180.0 SM-6 obsolescence ..............
steering & control.
WPN.................................... 7 .......................... ........... $30.0 SM-6 obsolescence Plate ..............
3A.
WPN.................................... 4 .......................... ........... $20.0 Tomahawk BlkV throughput ..............
expansion.
PDW.................................... 33 .......................... ........... $63.0 SM-3 Block IIA capacity ..............
expansion.
PDW.................................... 33 .......................... ........... $140.0 SM-3 Block IIA ..............
obsolescence.
WPN.................................... 27 .......................... ........... $65.0 Mk48 Mod 7 AUR and ..............
Technology Expansion
Program.
WPN.................................... 27 .......................... ........... $40.0 Mk48 Mod 7 further ..............
obsolescence fixes.
WPN.................................... 29 .......................... ........... $121.1 Mk54 Mod 1 kit........... ..............
WPN.................................... 29 .......................... ........... $18.6 Mk54 HAAWC kit........... ..............
WPN.................................... 31 .......................... ........... $10.0 Indian Head explosive ..............
fill production
expansion.
RDN.................................... ........... 0604601N.................. ........... $10.0 Indian Head underwater ..............
fill testing/quals
completion.
RDN.................................... ........... 0604601N.................. ........... $15.0 Hammerhead capability.... ..............
RDN.................................... ........... 9999...................... ........... $60.0 Classified program....... ..............
WPN.................................... 31 .......................... ........... $7.5 Mk68..................... ..............
WPN.................................... 31 .......................... ........... $0.4 Mk68 obsolescence........ ..............
RDN.................................... ........... 0603782N.................. ........... $10.0 ONR capability ..............
acceleration.
RDN.................................... 51 0603582N.................. ........... $19.6 PAC-3 MSE/Aegis ..............
integration.
MPAF................................... 16 .......................... ........... $217.3 GLSDB risk mitigation of ..............
current GFE--sensor/
shooter.
MPAF................................... 8 .......................... ........... $160.0 Joint Strike Missile ..............
production increase and
test equipment.
MPAF................................... 12 .......................... ........... $20.0 AMRAAM AP................ ..............
WPN.................................... 6 .......................... ........... $60.0 AIM-9X capacity expansion ..............
WPN.................................... 6 .......................... ........... $130.0 AIM-9X production ..............
increase (Navy).
MPAF................................... 6 .......................... ........... $130.0 AIM-9X production ..............
increase (AF).
MPAF................................... 9 .......................... ........... $35.0 SDB II capacity expansion ..............
to 2100.
MPAF................................... 9 .......................... ........... $70.0 SDB II capacity expansion ..............
to 3000.
OPN.................................... 63 .......................... ........... $100.0 Phoenix Ghost CP200...... ..............
WPN.................................... 22 .......................... ........... $38.0 ABL energetics expansion ..............
(GMLRS, PrSM, PAC-3,
etc).
WPN.................................... 23 .......................... ........... $125.0 Expansion of solid rocket ..............
motor industrial base.
RDDW................................... ........... 0602000D8Z................ ........... $35.0 CL-20.................... ..............
MPAF................................... 0708011F .......................... ........... $150.0 Defense Industrial Base ..............
(DIB) Expansion for.
Industrial Preparedness/
Pollution Prevention AFP-
44.
RDDW................................... ........... 0605022D8Z................ ........... $15.0 Defense exportability ..............
features.
RDAF................................... ........... 0604183F.................. ........... $133.4 HACM acceleration........ ..............
RDN.................................... ........... 0605518N.................. ........... $25.0 Mach-TB increase......... ..............
RDDW................................... ........... 0603766E.................. ........... $120.0 Assault Breaker II 4x LOE ..............
acceleration.
RDSF................................... 9999 .......................... ........... $20.0 Classified space add..... ..............
RDSF................................... ........... 1206310SF................. ........... $30.0 Narrowband antenna on- ..............
orbit demonstration.
RDSF................................... ........... 1206616SF................. ........... $70.0 Cislunar space domain ..............
awareness.
PSF.................................... 22 .......................... ........... $108.0 One additional space ..............
launch.
RDDW................................... ........... 0603133D8Z................ ........... $25.0 Foreign Comparative ..............
Testing.
RDDW................................... ........... 0604250D8Z................ ........... $46.0 Maintain SCO level of ..............
effort.
RDDW................................... ........... 0601101E.................. ........... $25.0 NSCAI generative AI...... ..............
RDDW................................... ........... 0602303E.................. ........... $50.0 NSCAI generative AI...... ..............
RDDW................................... ........... 0601101E.................. ........... $16.5 NSCAI AI for Cyber....... ..............
RDDW................................... ........... 0602303E.................. ........... $42.9 NSCAI AI for Cyber....... ..............
RDDW................................... ........... 0603760E.................. ........... $6.6 NSCAI AI for Cyber....... ..............
OMDW................................... ........... .......................... DS1 $200.0 National Defense ..............
Stockpile Transaction
Fund increase.
RDDW................................... ........... 0901579D8Z................ ........... $(30.0) Transfer to pilot ..............
program--Protecting
Access to Critical
Assets.
RDDW................................... ........... 0901579D8Z................ ........... $30.0 Transfer from Office of ..............
Strategic Capital for
pilot program on
Protecting Access to
Critical Assets.
RDDW................................... ........... 0604250D8Z................ ........... $25.0 Pele microreactor........ ..............
RDA.................................... ........... 0603119A.................. ........... $2.8 Contested Logistics: ..............
Autonomous Self
Perception Combat
Engineer Program (ASCEP).
RDDW................................... ........... 0603896C.................. ........... $19.0 Ballistic Missile Defense ..............
C2BMC (MD01).
4701................................... ........... 18-D-650.................. ........... $73.3 Tritium Finishing ..............
Facility, SRS.
4701................................... ........... .......................... ........... $28.1 B83 Stockpile Systems.... ..............
4701................................... ........... .......................... ........... $341.8 Savannah River Pit ..............
Production.
MILCON................................. ........... .......................... ........... $695.0 FY25 UFRs (for display ..............
purposes--text below).
MILCON................................. ........... .......................... ........... $1,691.0 FY24 MILCON UFRs (for ..............
display purposes--text
below).
OMA.................................... ........... .......................... 132 $1,652.0 Army FSRM to 100%........ ..............
OMN.................................... ........... .......................... BSM1 $650.0 Navy FSRM to 100%........ ..............
OMMC................................... ........... .......................... BSM1 $1,415.0 Marine Corps FSRM to 100% ..............
OMARNG................................. ........... .......................... 011R $1,375.0 Air Force FSRM to 100%... ..............
OMDW................................... ........... .......................... 4GTM $65.0 Defense Community ..............
Infrastructure Program.
OMAF................................... ........... .......................... 42A $2.0 Program increase for ..............
operational energy.
OMDW................................... UNDIS .......................... ........... $1,200.0 Fuel price increases ..............
(FY23 + Fy24).
SCN.................................... 10 .......................... ........... $928.0 DDG-51 prior-year CTC.... ..............
SCN.................................... 11 .......................... ........... $300.0 Surface ship supplier ..............
base.
SCN.................................... 11 .......................... ........... $280.0 DDG-51 AP................
APN.................................... 62 .......................... ........... $132.0 F-35B/C engine spares.... ..............
APN.................................... 6 .......................... ........... $250.0 FD2030--CH-53K +1 a/c.... ..............
RDN.................................... ........... 0603207N.................. ........... $10.0 Task Force 59 long- ..............
endurance USV
experimentation.
RDAF................................... ........... 0207138F.................. ........... $35.0 F-22 open system ..............
architecture for CCA.
OPAF................................... 9999 .......................... ........... $200.0 Classified program....... ..............
OPAF................................... 9999 .......................... ........... $150.0 Classified program....... ..............
RDN.................................... ........... 0604378N.................. ........... $22.5 Stratospheric balloon ..............
research--JTRS.
OPAF................................... 9999 .......................... ........... $40.0 Classified program....... ..............
APN.................................... 56 .......................... ........... $72.6 NGJ +2 additional ..............
shipsets.
OMAF................................... ........... .......................... MULTIPLE $470.3 F-22 WSS (prevent ..............
divestment).
APAF................................... 11 .......................... ........... $240.0 MH-139A.................. ..............
RDAF................................... ........... 0207110F.................. ........... $50.0 Next-Gen Advanced ..............
Propulsion.
APAF................................... 3 .......................... ........... $618.3 F-35A test jets (6 a/c).. ..............
RDAF................................... ........... 0207253F.................. ........... $49.0 Compass Call RDTE sim.... ..............
RDAF................................... ........... 0207133F.................. ........... $49.1 Advanced F-16 EW ..............
protection/attack.
APAF................................... ........... 26........................ ........... $130.5 Advanced F-16 EW ..............
protection/attack.
OPA.................................... 71 .......................... ........... $68.5 ENVG-B................... ..............
OMDW................................... ........... .......................... 1FU1 $15.0 JTF-N.................... ..............
RDDW................................... ........... 63375D8Z.................. ........... $30.0 Directed Energy Threat ..............
Research.
RDDW................................... ........... 33140D8Z.................. ........... 20.0 NSA Cyber Workforce Pilot ..............
Program.
OMARNG................................. ........... .......................... 153 $12.0 Army National Guard ..............
Mission Assurance
Program.
RDDW................................... ........... 9999...................... ........... $17.0 All-domain Anomaly ..............
Resolution Office.
RDN.................................... ........... 0604558N.................. ........... $7.0 Advanced Submarine ..............
Control Using Precision
Maneuvering Unit.
OMDW................................... ........... .......................... 012D $10.0 Southeast Asia Cyber ..............
Pilot Expansion.
OMARNG................................. ........... .......................... 121 $21.5 Exercise Northern Strike. ..............
PMC.................................... 40 .......................... ........... $26.0 Low cost unmanned ..............
aerospace vehicle (PAACK-
P).
OPA.................................... 86 .......................... ........... $77.0 IBCS--integration Army #1
acceleration for
INDOPACOM.
MSLS................................... 3 .......................... ........... $22.7 M-SHORAD Increment 1-- Army #2
expand capacity of
existing batteries.
OPA.................................... 60 .......................... ........... $81.2 Trojan SPIRIT............ Army #3
OMA.................................... ........... .......................... 121 $102.5 Expanding INDOPACOM Army #6
Campaigning Activities.
AMMO................................... 36 .......................... ........... 21.5 Water intake pump Army #10
upgades, Radford AAP.
RDA.................................... ........... 0604804A.................. ........... $21.2 Maneuver support vessel Army #11
(heavy).
ACFT................................... 8 .......................... ........... $62.1 Black Hawk (HH-60M) Army #25
replacement--MEDEVAC.
RDN.................................... ........... 0604038N.................. ........... $45.3 Maritime Targeting Cell Navy #1
Afloat (MTC-A)
Development.
RDN.................................... ........... 0604234N.................. ........... $249.3 Fund E-2D Theater Combat Navy #2
ID and HECTR.
OPN.................................... 16 .......................... ........... $61.9 Fund ZEUS for DDG-1000 Navy #3
Class.
RDN.................................... ........... 0204202N.................. ........... $124.5 Fund ZEUS for DDG-1000 Navy #3
Class.
OMN.................................... ........... .......................... 1C1C $4.0 VIOLET................... Navy #4
OPN.................................... 78 .......................... ........... $1.2 VIOLET................... Navy #4
RDN.................................... ........... 0101402N.................. ........... $20.4 VIOLET................... Navy #4
OMN.................................... ........... .......................... BSM1 $300.0 Dry Dock Repairs at PSNS Navy #5
Investment.
Restoration and
Modernization (RM).
OMN.................................... ........... .......................... BSM1 $250.0 Targeted Facilities Navy #6
Sustainment, Restoration
and.
Modernization (FSRM)
Investment.
OMN.................................... ........... .......................... BSM1 $300.0 Targeted Facilities Navy #6
Sustainment, Restoration
and.
Modernization (FSRM)
Investment.
SCN.................................... 32 .......................... ........... $208.1 DDG-51 SEWIP Blk III (DDG Navy #7
136-137).
SCN.................................... 3 .......................... ........... $170.0 CVN 75 and CVN 80 SEWIP Navy #8
Blk III.
SCN.................................... 7 .......................... ........... $94.0 CVN 75 and CVN 80 SEWIP Navy #8
Blk III.
APN.................................... 15 .......................... ........... $118.8 Navy Unique Fleet Navy #9
Essential Airlift
Logistics KC-130J (+1 A/
C Reserve).
APN.................................... 62 .......................... ........... $93.0 CH-53K Initial and USMC #2
Outfitting Spares.
PMC.................................... 43 .......................... ........... $21.1 Project 7/11--Modular USMC #3
Operations Cells.
APN.................................... 16 .......................... ........... $252.9 (+2) KC-130J Aircraft and USMC #4
Initial Spares.
PMC.................................... 25 .......................... ........... $5.1 Distributed Common Ground/ USMC #5
Surface System-.
Marine Corps (DCGS-MC)
All-.
Source SCI Workstations..
Family of Field Medical
Equipment (FFME).
PMC.................................... 50 .......................... ........... $11.0 Damage Control USMC #6
Resuscitation.
(DCR) and Damage Control
Surgery (DCS).
Equipment Sets...........
PMC.................................... 19 .......................... ........... $160.0 (+4) AN/TPS-80 G/ATOR USMC #7
Radar.
RDN.................................... ........... 0206313M.................. ........... $16.3 Satellite Communications USMC #8
Terminal, Network-on-.
the-Move (NOTM)..........
Digital Interoperability
(DI)--Marine Agile.
RDN.................................... ........... 0605217N.................. ........... $78.5 Network Gateway Link USMC #11
(MANGL) Roll-Up.
PMC.................................... 54 .......................... ........... $21.0 Ultra-Light-Weight USMC #12
Camouflage Netting
System (ULCANS).
PMC.................................... 17 .......................... ........... $5.1 Joint All Domain Command USMC #13
and Control (JADC2)
Testing, Evaluation and
Engineering Environment.
APN.................................... 68 .......................... ........... $122.4 (+4) F-35B Engine/Lift USMC #14
System USMC Spares.
PMC.................................... 48 .......................... ........... $8.0 Demolition Equipment Set, USMC #19
Squad.
Engineer/Explosive Hazard
Defeat Systems.
APN.................................... 68 .......................... ........... $67.5 (+3) UC-12W(ER) USMC #20
Beechcraft King Air
350ER with Cargo Door
and Initial Spares.
PMC.................................... 52 .......................... ........... $10.0 Multi-Terrain Loader-- USMC #21
Replacement.
APAF................................... 52 .......................... ........... $596.2 Accelerate E-7 delivery.. AF #1
RDAF................................... ........... 0604007F.................. ........... $37.2 Accelerate E-7 delivery.. AF #1
OMAF................................... ........... .......................... 012C $0.7 (OI-3) Fund ISR Digital AF #4
Infrastructure.
OMAF................................... ........... .......................... 012C $58.6 (OI-3) Fund ISR Digital AF #4
Infrastructure.
RDAF................................... ........... 0207431F.................. ........... $1.2 (OI-3) Fund ISR Digital AF #4
Infrastructure.
RDAF................................... ........... 0207431F.................. ........... $13.8 (OI-3) Fund ISR Digital AF #4
Infrastructure.
RDAF................................... ........... 0207431F.................. $6.2 (OI-3) Fund AF #4....................
ISR Digital
Infrastructure
RDAF................................... ........... 0207431F.................. ........... $5.9 (OI-3) Fund ISR Digital AF #4
Infrastructure.
RDAF................................... 66 .......................... ........... $15.9 (OI-3) Fund ISR Digital AF #4
Infrastructure.
OPAF................................... ........... 0305208F.................. ........... $5.0 (OI-3) Fund ISR Digital AF #4
Infrastructure.
RDAF................................... ........... .......................... ........... $10.6 (OI-3) Fund ISR Digital AF #4
Infrastructure.
OMAF................................... ........... 9999...................... 011C $12.1 (OI-3) Fund ISR Digital USSF #3
Infrastructure.
RDSF................................... ........... 9999...................... ........... $13.0 Classified Program D..... USSF #4
RDSF................................... ........... 9999...................... ........... $105.0 Classified Program E..... USSF #5
RDSF................................... ........... 9999...................... ........... $90.0 Classified Program F..... USSF #6
RDSF................................... 56 1203040SF................. ........... $43.0 DCO-S.................... USSF #7
RDDW................................... ........... 0604181C.................. ........... $298.0 Glide Phase Interceptor.. MDA #3
RDDW................................... ........... 0603891C.................. ........... 22.9 Classified Program A/ MDA #1
Novel countermeasure
against hypersonic
threats.
RDDW................................... ........... 0603906C.................. ........... $15.0 Classified Program B..... MDA #2
RDDW................................... ........... 0603914C.................. ........... $34.7 Pacific Collector/Pacific MDA #7
Tracker Replacement.
Planning & Engineering...
RDDW................................... ........... 0603914C.................. ........... $315.3 Pacific Collector MDA #8
Replacement.
RDDW................................... ........... 0603891C.................. ........... $32.2 Left Through Right of MDA #4
Launch Integration/
Antenna, software
development & C2BMC
integration.
RDDW................................... ........... 0603890C.................. ........... $12.4 Electronic Attack/ MDA #6
Electronic Protection.
RDDW................................... ........... 0603891C.................. ........... $27.3 Electronic Warfare for MDA #9
Missile Defense.
OPN.................................... 126 .......................... ........... $36.9 Somalia presistent AFRICOM #1
presence.
OMA.................................... ........... .......................... 411 $95.3 Contract ISR............. AFRICOM #2
OMA.................................... ........... .......................... 411 $2.1 Contract ISR............. AFRICOM #2
OMA.................................... ........... .......................... 411 $4.7 Contract ISR............. AFRICOM #2
RDA.................................... ........... 0603766A.................. ........... $14.7 Air Vigilance O&S........ CENTCOM #1
RDAF................................... ........... 0207247F.................. ........... $15.0 AF TENCAP Crestone CENTCOM #1
Database.
OMAF................................... ........... .......................... 015F $16.0 GPN-CENT................. CENTCOM #2
OMAF................................... ........... .......................... 015F $8.0 Data analysis and AI CENTCOM #3
initiative.
OMAF................................... ........... .......................... 015F $34.0 MSS licenses............. CENTCOM #3
OMAF................................... ........... .......................... 015F $30.0 Cloud transition......... CENTCOM #3
........... 0303055F.................. 011Z $81.2 European Communications EUCOM #1
Infrastructure.
........... 0207522F.................. 012C $78.3 Air Based Air Defense.... EUCOM #2
RDDW................................... ........... 0604331D8Z................ ........... $174.0 Joint Fires Network (JFN) INDOPACOM #1
RDDW................................... ........... 0604102C.................. ........... $147.0 Guam Defense System...... INDOPACOM #2
OMAF................................... ........... .......................... 011C $90.0 INDOPACOM Campaigning.... INDOPACOM #5
OMMC................................... ........... .......................... 1A1A $8.0 INDOPACOM Campaigning.... INDOPACOM #5
OMN.................................... ........... .......................... 1CCM $36.0 INDOPACOM Campaigning.... INDOPACOM #5
OMN.................................... ........... .......................... 1CCM $49.0 Joint Training Team...... INDOPACOM #9
OMN.................................... ........... .......................... 1CCM $25.5 Joint Task Force INDOPACOM #10
Micronesia.
RDDW................................... ........... 0604331D8Z................ ........... $10.0 Joint Experimentation and INDOPACOM #12
Innovation.
OMN.................................... ........... .......................... 1CCM $9.0 Joint Experimentation and INDOPACOM #12
Innovation.
OPN.................................... 43 .......................... ........... $117.0 Persistent Targeting for INDOPACOM #17
Undersea.
OMN.................................... ........... .......................... 1CCM $9.0 Joint Task Force Indo- INDOPACOM #24
Pacific (JTF-IP).
OMN.................................... ........... .......................... 1CCM $5.0 Headquarters Manpower INDOPACOM #26
Enhancements.
OMDW................................... ........... .......................... 8PLI $69.9 Joint Training, Exercise INDOPACOM #27
and Evaluation Program.
(JTEEP)..................
RDAF................................... ........... 0604617F.................. ........... $4.5 Arctic capable prepo NORTHCOM #1
shelters.
RDAF................................... ........... 0604617F.................. ........... $5.5 Arctic capable prepo NORTHCOM #1
shelters.
OMAF................................... ........... .......................... 015C $5.2 Counter strategic NORTHCOM #2
competitors in Western
Hemisphere.
RDAF................................... ........... 0604617F.................. ........... $1.0 Arctic campaigning....... NORTHCOM #3
RDAF................................... ........... 0604617F.................. ........... $6.0 Arctic campaigning....... NORTHCOM #3
RDAF................................... ........... 0102417F.................. ........... $55.0 OTH-R capability NORTHCOM #4
acceleration.
RDAF................................... ........... 0102326F.................. ........... $9.8 Domain awareness tech dev NORTHCOM #5
RDAF................................... ........... 01002412F................. ........... $27.0 ARCHER................... NORTHCOM #6
OPAF................................... 22 .......................... ........... $211.5 3DELLR................... NORTHCOM #7
RDAF................................... ........... 0102326F.................. ........... $4.2 HDCS..................... NORTHCOM #8
RDAF................................... ........... 0102326F.................. ........... $33.2 ERSA..................... NORTHCOM #9
RDAF................................... ........... 0201130F.................. ........... $13.9 Core tech investment..... NORTHCOM #10
O&M, DW................................ ........... .......................... 1PL7 $31.1 Counter Uncrewed Aerial SOCOM
Systems (CUAS) Group.
3 Defeat Acceleration....
PROC, DW............................... 75 .......................... ........... $9.3 Counter Uncrewed Aerial SOCOM
Systems (CUAS) Group.
3 Defeat Acceleration....
OMMC................................... ........... .......................... 1A1A $9.9 Global Prepositioning SOUTHCOM #22
Network (GPN) Concept.
RDSF................................... ........... 9999...................... ........... $143.0 SPACECOM classified SPACECOM #3
program.
RDSF................................... ........... 9999...................... ........... $127.0 SPACECOM classified SPACECOM #5
program.
RDSF................................... ........... 9999...................... ........... $68.0 SPACECOM classified SPACECOM #6
program.
OMAF................................... ........... .......................... 015X $20.0 Space warfighting terrain SPACECOM #7
$ 24,969.4
----------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------------------------------
FY 2024 Senate Senate
Account State/Country Installation Project Title Request Change Authorized
--------------------------------------------------------------------------------------------------------------------------------------------------------
MILITARY CONSTRUCTION
ARMY
Army............................... Alabama................. Anniston Army Depot.... OPEN STORAGE (P&D)..... 0 270 270
Army............................... Alabama................. Redstone Arsenal....... SUBSTATION............. 50,000 0 50,000
Army............................... Alaska.................. Fort Wainwright........ COST TO COMPLETE: 34,000 0 34,000
ENLISTED UNACCOMPANIED
PERS HSG.
Army............................... Alaska.................. Fort Wainwright........ SOLDER PERFORMANCE 0 7,900 7,900
READINESS CENTER (P&D).
Army............................... Florida................. Eglin Air Force Base... BARRACKS............... 0 75,000 75,000
Army............................... Georgia................. Hunter Army Airfield... AIRCRAFT MAINTENANCE 0 9,900 9,900
HANGAR (P&D).
Army............................... Georgia................. Fort Eisenhower........ CYBER INSTRUCTIONAL 163,000 -90,000 73,000
FACILITY (CLASSROOMS).
Army............................... Germany................. Grafenwoehr............ AUTOMATED MULTIPURPOSE 10,400 0 10,400
MACHINE GUN RANGE.
Army............................... Germany................. Hohenfels.............. SIMULATIONS CENTER..... 56,000 0 56,000
Army............................... Germany................. Pulaski Barracks....... CHILD DEVELOPMENT 0 25,000 25,000
CENTER.
Army............................... Hawaii.................. Aliamanu Military WATER STORAGE TANK..... 20,000 0 20,000
Reservation.
Army............................... Hawaii.................. Fort Shafter........... CLEARWELL AND BOOSTER 0 23,000 23,000
PUMP.
Army............................... Hawaii.................. Helemano Military WELLS AND STORAGE TANK. 0 33,000 33,000
Reservation.
Army............................... Hawaii.................. Schofield Barracks..... ELEVATED TANK AND 0 21,000 21,000
DISTRIBUTION LINE.
Army............................... Hawaii.................. Schofield Barracks..... WATER STORAGE TANK..... 0 16,000 16,000
Army............................... Hawaii.................. Wheeler Army Airfield.. AIR TRAFFIC CONTROL 0 5,400 5,400
TOWER (P&D).
Army............................... Indiana................. Crane Army Ammunition EARTH COVERED MAGAZINES 0 1,195 1,195
Plant. (P&D).
Army............................... Illinois................ Rock Island Arsenal.... CHILD DEVELOPMENT 0 44,000 44,000
CENTER ADDITION.
Army............................... Kansas.................. Fort Riley............. AIR TRAFFIC CONTROL 0 1,600 1,600
TOWER (P&D).
Army............................... Kansas.................. Fort Riley............. AIRCRAFT MAINTENANCE 105,000 0 105,000
HANGER.
Army............................... Kentucky................ Blue Grass Army Depot.. SMALL ARMS 0 3,300 3,300
MODERNIZATION (P&D).
Army............................... Kentucky................ Fort Campbell.......... AIR TRAFFIC CONTROL 0 2,500 2,500
TOWER (P&D).
Army............................... Kentucky................ Fort Campbell.......... MULTIPURPOSE TRAINING 38,000 0 38,000
RANGE.
Army............................... Kentucky................ Fort Knox.............. MIDDLE SCHOOL ADDITION 0 6,600 6,600
(P&D).
Army............................... Kwajalein............... Kwajalein Atoll........ COST TO COMPLETE: PIER. 0 15,000 15,000
Army............................... Louisiana............... Fort Johnson........... BARRACKS............... 0 106,000 106,000
Army............................... Louisiana............... Fort Johnson........... MULTIPURPOSE ATHLETIC 0 13,400 13,400
FIELD.
Army............................... Maryland................ Fort Meade............. CHILD DEVELOPMENT 0 50,000 50,000
CENTER.
Army............................... Massachusetts........... Soldier Systems Center BARRACKS ADDITION...... 18,500 0 18,500
Natick.
Army............................... Michigan................ Detroit Arsenal........ GROUND TRANSPORT 72,000 0 72,000
EQUIPMENT BUILDING.
Army............................... New Mexico.............. White Sands Missile J-DETC DIRECTED ENERGY 0 5,500 5,500
Range. FACILITY (P&D).
Army............................... New York................ Fort Hamilton.......... CHILD DEVELOPMENT 0 25,000 25,000
CENTER.
Army............................... New York................ Watervliet Arsenal..... TANK FARM (P&D)........ 0 160 160
Army............................... North Carolina.......... Fort Liberty........... AUTOMATED RECORD FIRE 19,500 0 19,500
RANGE.
Army............................... North Carolina.......... Fort Liberty........... BARRACKS............... 50,000 0 50,000
Army............................... North Carolina.......... Fort Liberty........... BARRACKS (FACILITY 85,000 0 85,000
PROTOTYPING).
Army............................... North Carolina.......... Fort Liberty........... CHILD DEVELOPMENT 0 39,000 39,000
CENTER.
Army............................... Oklahoma................ McAlester Army WATER TREATMENT PLANT 0 1,194 1,194
Ammunition Plant. (P&D).
Army............................... Pennsylvania............ Letterkenny Army Depot. ANECHOIC CHAMBER (P&D). 0 275 275
Army............................... Pennsylvania............ Letterkenny Army Depot. GUIDED MISSILE 89,000 0 89,000
MAINTENANCE BUILDING.
Army............................... Pennsylvania............ Tobyhanna Army Depot... HELIPAD (P&D).......... 0 311 311
Army............................... Pennsylvania............ Tobyhanna Army Depot... RADAR MAINTENANCE SHOP 0 259 259
(P&D).
Army............................... Poland.................. Various Locations...... PLANNING & DESIGN...... 0 25,710 25,710
Army............................... South Carolina.......... Fort Jackson........... CHILD DEVELOPMENT 0 41,000 41,000
CENTER.
Army............................... South Carolina.......... Fort Jackson........... COST TO COMPLETE: 0 66,000 66,000
RECEPTION BARRACKS
COMPLEX, PHASE 2.
Army............................... Texas................... Fort Bliss............. RAIL YARD.............. 74,000 0 74,000
Army............................... Texas................... Fort Cavazos........... BARRACKS (P&D)......... 0 20,000 20,000
Army............................... Texas................... Fort Cavazos........... TACTICAL EQUIPMENT 0 5,800 5,800
MAINTENANCE FACILITIES
(P&D).
Army............................... Texas................... Red River Army Depot... COMPONENT REBUILD SHOP. 113,000 -66,600 46,400
Army............................... Texas................... Red River Army Depot... NON-DESTRUCTIVE TESTING 0 280 280
FACILITY (P&D).
Army............................... Texas................... Red River Army Depot... STANDBY GENERATOR (P&D) 0 270 270
Army............................... Virginia................ Fort Belvoir........... EQUINE TRAINING 0 4,000 4,000
FACILITY (P&D).
Army............................... Virginia................ Fort Belvoir........... EQUINE FACILITY........ 0 40,000 40,000
Army............................... Virginia................ Joint Base Myer- BARRACKS............... 0 177,000 177,000
Henderson Hall.
Army............................... Washington.............. Joint Base Lewis- BARRACKS............... 100,000 0 100,000
McChord.
Army............................... Washington.............. Joint Base Lewis- VEHICLE MAINTENANCE 0 7,500 7,500
McChord. SHOP (P&D).
Army............................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 50,000 50,000
FUND.
Army............................... Worldwide Unspecified... Unspecified Worldwide HOST NATION SUPPORT.... 26,000 0 26,000
Locations.
Army............................... Worldwide Unspecified... Unspecified Worldwide MINOR CONSTRUCTION..... 76,280 0 76,280
Locations.
Army............................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 270,875 0 270,875
Locations.
Subtotal Military 1,470,555 812,724 2,283,279
Construction, Army.
--------------------------
NAVY
Navy............................... Australia............... Royal Australian Air PDI: AIRCRAFT PARKING 134,624 0 134,624
Force Base Darwin. APRON (INC).
Navy............................... California.............. Marine Corps Air Ground COMMUNICATIONS TOWERS.. 42,100 0 42,100
Combat Center
Twentynine Palms.
Navy............................... California.............. Marine Corps Base Camp FIRE/EMERGENCY RESPONSE 0 26,825 26,825
Pendleton. STATION (53 AREA)
REPLACEMENT.
Navy............................... California.............. Port Hueneme........... LABORATORY COMPOUND 110,000 -95,000 15,000
FACILITIES
IMPROVEMENTS.
Navy............................... Connecticut............. Naval Submarine Base SUBMARINE PIER 31 112,518 -75,800 36,718
New London. EXTENSION.
Navy............................... Connecticut............. Naval Submarine Base WEAPONS MAGAZINE & 219,200 -200,000 19,200
New London. ORDNANCE OPERATIONS
FAC..
Navy............................... District Of Columbia.... Marine Barracks BACHELOR ENLISTED 131,800 -115,000 16,800
Washington. QUARTERS & SUPPORT
FACILITY.
Navy............................... District of Columbia.... Naval Support Activity. ELECTROMAGNETIC & CYBER 0 40,000 40,000
COUNTERMEASURES LAB
(P&D).
Navy............................... Djibouti................ Camp Lemonnier......... ELECTRICAL POWER PLANT. 0 20,000 20,000
Navy............................... Florida................. Naval Air Station AHTS HANGAR............ 0 50,000 50,000
Whiting Field.
Navy............................... Georgia................. Marine Corps Logistics CONSOLIDATED 0 63,970 63,970
Base Albany. COMMUNICATION FACILITY.
Navy............................... Guam.................... Andersen Air Force Base PDI: CHILD DEVELOPMENT 105,220 -50,000 55,220
CENTER.
Navy............................... Guam.................... Andersen Air Force Base PDI: JOINT CONSOL. 107,000 0 107,000
COMM. CENTER (INC).
Navy............................... Guam.................... Joint Region Marianas.. PDI: JOINT 292,830 -261,500 31,330
COMMUNICATION UPGRADE
(INC).
Navy............................... Guam.................... Joint Region Marianas.. PDI: MISSILE 174,540 -130,000 44,540
INTEGRATION TEST
FACILITY.
Navy............................... Guam.................... Naval Base Guam........ PDI: 9TH ESB TRAINING 23,380 0 23,380
COMPLEX.
Navy............................... Guam.................... Naval Base Guam........ PDI: ARTILLERY BATTERY 137,550 -70,000 67,550
FACILITIES.
Navy............................... Guam.................... Naval Base Guam........ PDI: CONSOLIDATED MEB 19,740 0 19,740
HQ/NCIS PHII.
Navy............................... Guam.................... Naval Base Guam........ PDI: RECREATION CENTER. 34,740 0 34,740
Navy............................... Guam.................... Naval Base Guam........ PDI: RELIGIOUS MINISTRY 46,350 0 46,350
SERVICES FACILITY.
Navy............................... Guam.................... Naval Base Guam........ PDI: SATELLITE 166,159 -110,000 56,159
COMMUNICATIONS
FACILITY (INC).
Navy............................... Guam.................... Naval Base Guam........ PDI: TRAINING CENTER... 89,640 0 89,640
Navy............................... Hawaii.................. Joint Base Pearl Harbor- DRY DOCK 3 REPLACEMENT 1,318,711 91,000 1,409,711
Hickam. (INC).
Navy............................... Hawaii.................. Joint Base Pearl Harbor- WATERFRONT PRODUCTION 0 60,000 60,000
Hickam. FACILITY (P&D).
Navy............................... Hawaii.................. Marine Corps Base WATER RECLAMATION 0 40,000 40,000
Kaneohe Bay. FACILITY COMPLIANCE
UPGRADE.
Navy............................... Italy................... Naval Air Station EDI: ORDNANCE MAGAZINES 77,072 0 77,072
Sigonella.
Navy............................... Maine................... Portsmouth Naval MULTI-MISSION DRYDOCK 544,808 0 544,808
Shipyard. #1 EXTENSION (INC).
Navy............................... Maryland................ Fort Meade............. CYBERSECURITY 186,480 -125,900 60,580
OPERATIONS FACILITY.
Navy............................... Maryland................ Naval Air Station AIRCRAFT DEVELOPMENT 141,700 -79,700 62,000
Patuxent River. AND MAINTENANCE
FACILITIES.
Navy............................... North Carolina.......... Marine Corps Air 2D LAAD MAINTENANCE AND 0 50,000 50,000
Station Cherry Point. OPERATIONS FACILITIES.
Navy............................... North Carolina.......... Marine Corps Air AIRCRAFT MAINTENANCE 19,529 0 19,529
Station Cherry Point. HANGAR (INC).
Navy............................... North Carolina.......... Marine Corps Air MAINTENANCE FACILITY & 125,150 -85,000 40,150
Station Cherry Point. MARINE AIR GROUP HQS.
Navy............................... North Carolina.......... Marine Corps Base Camp 10TH MARINES 0 20,000 20,000
Lejeune. MAINTENANCE &
OPERATIONS COMPLEX.
Navy............................... North Carolina.......... Marine Corps Base Camp AMPHIBIOUS COMBAT 0 31,890 31,890
Lejeune. VEHICLE SHELTERS.
Navy............................... North Carolina.......... Marine Corps Base Camp CORROSION REPAIR 0 20,000 20,000
Lejeune. FACILITY REPLACEMENT.
Navy............................... Pennsylvania............ Naval Surface Warfare AI MACHINERY CONTROL 0 88,200 88,200
Center Philadelphia DEVELOPMENT CENTER.
Dam Neck Annex.
Navy............................... Virginia................ ....................... MARITIME SURVEILLANCE 109,680 0 109,680
SYSTEM FACILITY.
Navy............................... Virginia................ Joint Expeditionary CHILD DEVELOPMENT 35,000 0 35,000
Base Little Creek-- CENTER.
Fort Story.
Navy............................... Virginia................ Marine Corps Base WATER TREATMENT PLANT.. 127,120 -90,000 37,120
Quantico.
Navy............................... Virginia................ Naval Station Norfolk.. CHILD DEVELOPMENT 43,600 0 43,600
CENTER.
Navy............................... Virginia................ Naval Station Norfolk.. MQ-25 AIRCRAFT LAYDOWN 114,495 -103,000 11,495
FACILITIES.
Navy............................... Virginia................ Naval Station Norfolk.. SUBMARINE PIER 3 (INC). 99,077 0 99,077
Navy............................... Virginia................ Naval Weapons Station WEAPONS MAGAZINES...... 221,920 -175,000 46,920
Yorktown.
Navy............................... Virginia................ Norfolk Naval Shipyard. DRY DOCK SALTWATER 81,082 0 81,082
SYSTEM FOR CVN-78
(INC).
Navy............................... Washington.............. Naval Base Kitsap...... ALTERNATE POWER 0 19,000 19,000
TRANSMISSION LINE.
Navy............................... Washington.............. Naval Base Kitsap...... ARMORED FIGHTING 0 31,000 31,000
VEHICLE SUPPORT
FACILITY.
Navy............................... Washington.............. Naval Base Kitsap...... SHIPYARD ELECTRICAL 195,000 -180,000 15,000
BACKBONE.
Navy............................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 75,000 75,000
FUND.
Navy............................... Worldwide Unspecified... Unspecified Worldwide.. INDOPACOM PLANNING & 0 69,000 69,000
DESIGN.
Navy............................... Worldwide Unspecified... Unspecified Worldwide.. MCON-D (UTILITIES 0 85,000 85,000
MILCON) (P&D).
Navy............................... Worldwide Unspecified... Unspecified Worldwide.. SIOP (P&D)............. 0 50,000 50,000
Navy............................... Worldwide Unspecified... Unspecified Worldwide.. PLANNING & DESIGN...... 599,942 0 599,942
Navy............................... Worldwide Unspecified... Unspecified Worldwide.. UNSPECIFIED MINOR 34,430 30,000 64,430
CONSTRUCTION.
Navy............................... Worldwide Unspecified... Unspecified Worldwide.. USMC PLANNING & DESIGN. 0 48,741 48,741
........................ ....................... Subtotal Military 6,022,187 -936,274 5,085,913
Construction, Navy.
AIR FORCE.......................... ........................ ....................... ....................... ........... ........... ...........
Air Force.......................... Alaska.................. Eielson Air Force Base. CONSOLIDATED MUNITIONS 0 1,200 1,200
COMPLEX (P&D).
Air Force.......................... Alaska.................. Eielson Air Force Base. JOINT PACIFIC ALASKA 0 1,100 1,100
RANGE COMPLEX (JPARC)
OPS FACILITY (P&D).
Air Force.......................... Alaska.................. Joint Base Elmendorf- EXTEND RUNWAY 16/34 107,500 0 107,500
Richardson. (INC 3).
Air Force.......................... Alaska.................. Joint Base Elmendorf- PRECISION GUIDED 0 6,100 6,100
Richardson. MISSILE COMPLEX (P&D).
Air Force.......................... Arizona................. Luke Air Force Base.... GILA BEND (P&D)........ 0 2,600 2,600
Air Force.......................... Australia............... Royal Australian Air PDI: SQUADRON 26,000 0 26,000
Force Base Darwin. OPERATIONS FACILITY.
Air Force.......................... Australia............... Royal Australian Air PDI: AIRCRAFT 17,500 0 17,500
Force Base Tindal. MAINTENANCE SUPPORT
FACILITY.
Air Force.......................... Australia............... Royal Australian Air PDI: SQUADRON 20,000 0 20,000
Force Base Tindal. OPERATIONS FACILITY.
Air Force.......................... Australia............... Royal Australian Air PDI: BOMBER APRON...... 93,000 0 93,000
Force Base Tindal.
Air Force.......................... District of Columbia.... Joint Base Anacostia- LARGE VEHICLE 0 50,000 50,000
Bolling. INSPECTION STATION.
Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL AIRCRAFT 25,000 0 25,000
CORROSION CONTROL.
Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL AIRCRAFT 27,000 0 27,000
MAINTENANCE HANGAR.
Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL APRON & 61,000 0 61,000
HYDRANT FUELING PITS.
Air Force.......................... Florida................. MacDill Air Force Base. KC-46A ADAL FUEL SYSTEM 18,000 0 18,000
MAINTENANCE DOCK.
Air Force.......................... Florida................. Patrick Space Force COMMERCIAL VEHICLE 15,000 0 15,000
Base. INSPECTION.
Air Force.......................... Florida................. Patrick Space Force COST TO COMPLETE: 15,000 0 15,000
Base. CONSOLIDATED
COMMUNICATIONS CENTER.
Air Force.......................... Florida................. Patrick Space Force FINAL DENIAL BARRIERS, 12,000 0 12,000
Base. SOUTH GATE.
Air Force.......................... Florida................. Tyndall Air Force Base. NATURAL DISASTER 0 252,000 252,000
RECOVERY.
Air Force.......................... Georgia................. Robins Air Force Base.. BATTLE MANAGEMENT 115,000 0 115,000
COMBINED OPERATIONS
COMPLEX.
Air Force.......................... Guam.................... Joint Region Marianas.. PDI: NORTH AIRCRAFT 109,000 0 109,000
PARKING RAMP (INC).
Air Force.......................... Japan................... Kadena Air Base........ PDI: HELO RESCUE OPS 46,000 0 46,000
MAINTENANCE HANGAR
(INC 3).
Air Force.......................... Japan................... Kadena Air Base........ PDI: THEATER A/C 42,000 0 42,000
CORROSION CONTROL CTR
(INC).
Air Force.......................... Louisiana............... Barksdale Air Force CHILD DEVELOPMENT 0 2,000 2,000
Base. CENTER (P&D).
Air Force.......................... Louisiana............... Barksdale Air Force DORMITORY (P&D)........ 0 7,000 7,000
Base.
Air Force.......................... Louisiana............... Barksdale Air Force WEAPONS GENERATION 112,000 0 112,000
Base. FACILITY (INC 3).
Air Force.......................... Mariana Islands......... Tinian................. PDI: AIRFIELD 26,000 0 26,000
DEVELOPMENT, PHASE 1
(INC 3).
Air Force.......................... Mariana Islands......... Tinian................. PDI: FUEL TANKS W/ 20,000 0 20,000
PIPELINE & HYDRANT
(INC 3).
Air Force.......................... Mariana Islands......... Tinian................. PDI: PARKING APRON (INC 32,000 0 32,000
3).
Air Force.......................... Massachusetts........... Hanscom Air Force Base. CHILD DEVELOPMENT 37,000 0 37,000
CENTER.
Air Force.......................... Massachusetts........... Hanscom Air Force Base. MIT-LINCOLN LAB (WEST 70,000 0 70,000
LAB CSL/MIF) (INC 4).
Air Force.......................... Mississippi............. Columbus Air Force Base T-7A GROUND BASED 30,000 0 30,000
TRAINING SYSTEM
FACILITY.
Air Force.......................... Mississippi............. Columbus Air Force Base T-7A UNIT MAINTENANCE 9,500 0 9,500
TRAINING FACILITY.
Air Force.......................... Mississippi............. Keesler Air Force Base. AIR TRAFFIC CONTROL 0 2,000 2,000
TOWER (P&D).
Air Force.......................... Montana................. Malmstrom Air Force FIRE STATION BAY/ 0 10,300 10,300
Base. STORAGE AREA.
Air Force.......................... Nebraska................ Offutt Air Force Base.. 55 CES MAINTENANCE/ 0 4,500 4,500
WAREHOUSE (P&D).
Air Force.......................... Nebraska................ Offutt Air Force Base.. BASE OPERATIONS/ 0 5,000 5,000
MOBILITY CENTER (P&D).
Air Force.......................... Nebraska................ Offutt Air Force Base.. LOGISTICS READINESS 0 3,500 3,500
SQUADRON
TRANSPORTATION
FACILITY (P&D).
Air Force.......................... Nevada.................. Nellis Air Force Base.. F-35 COALITION HANGAR 0 5,500 5,500
(P&D).
Air Force.......................... Nevada.................. Nellis Air Force Base.. F-35 DATA LAB SUPPORT 0 700 700
FACILITY (P&D).
Air Force.......................... New Mexico.............. Cannon Air Force Base.. SATELLITE FIRE STATION 0 5,000 5,000
(P&D).
Air Force.......................... New Mexico.............. Kirtland Air Force Base COST TO COMPLETE: 0 24,400 24,400
WYOMING GATE UPGRADE
FOR ANTITERRORISM
COMPLIANCE.
Air Force.......................... Norway.................. Rygge Air Station...... EDI: DABS-FEV STORAGE.. 88,000 0 88,000
Air Force.......................... Norway.................. Rygge Air Station...... EDI: MUNITIONS STORAGE 31,000 0 31,000
AREA.
Air Force.......................... Ohio.................... Wright-Patterson Air ACQUISITION MANAGEMENT 0 19,500 19,500
Force Base. COMPLEX PHASE V (P&D).
Air Force.......................... Oklahoma................ Tinker Air Force Base.. KC-46 3-BAY DEPOT 78,000 0 78,000
MAINTENANCE HANGAR
(INC 3).
Air Force.......................... Oklahoma................ Vance Air Force Base... CONSOLIDATED 0 8,400 8,400
UNDERGRADUATE PILOT
TRAINING CENTER (P&D).
Air Force.......................... Philippines............. Cesar Basa Air Base.... PDI: TRANSIENT AIRCRAFT 35,000 0 35,000
PARKING APRON.
Air Force.......................... South Dakota............ Ellsworth Air Force B-21 FUEL SYSTEM 75,000 0 75,000
Base. MAINTENANCE DOCK.
Air Force.......................... South Dakota............ Ellsworth Air Force B-21 PHASE HANGAR...... 160,000 0 160,000
Base.
Air Force.......................... South Dakota............ Ellsworth Air Force B-21 WEAPONS GENERATION 160,000 0 160,000
Base. FACILITY (INC).
Air Force.......................... Spain................... Moron Air Base......... EDI: MUNITIONS STORAGE. 26,000 0 26,000
Air Force.......................... Texas................... Joint Base San Antonio- 91 CYBER OPERATIONS 0 48,000 48,000
Lackland. CENTER.
Air Force.......................... Texas................... Joint Base San Antonio- BMT--CHAPEL FOR 0 122,000 122,000
Lackland. AMERICA'S AIRMEN.
Air Force.......................... Texas................... Joint Base San Antonio- BMT--CLASSROOM/DINING 0 124,000 124,000
Lackland. FACILITY 4.
Air Force.......................... Texas................... Joint Base San Antonio- CHILD DEVELOPMENT 20,000 0 20,000
Lackland. CENTER.
Air Force.......................... United Kingdom.......... Royal Air Force COST TO COMPLETE: EDI 0 28,000 28,000
Fairford. DABS-FEV STORAGE.
Air Force.......................... United Kingdom.......... Royal Air Force COST TO COMPLETE: EDI 0 20,000 20,000
Fairford. MUNITIONS HOLDING AREA.
Air Force.......................... United Kingdom.......... Royal Air Force EDI: RADR STORAGE 47,000 0 47,000
Fairford. FACILITY.
Air Force.......................... United Kingdom.......... Royal Air Force EDI: RADR STORAGE 28,000 0 28,000
Lakenheath. FACILITY.
Air Force.......................... United Kingdom.......... Royal Air Force SURETY DORMITORY....... 50,000 0 50,000
Lakenheath.
Air Force.......................... Utah.................... Hill Air Force Base.... F-35 COMPOSITE REPAIR & 0 171,000 171,000
TRAINING FACILITY,
PHASE 1.
Air Force.......................... Utah.................... Hill Air Force Base.... F-35 MAINTENANCE 0 235,000 235,000
FACILITY, PHASE 1.
Air Force.......................... Utah.................... Hill Air Force Base.... F-35 T-7A EAST CAMPUS 82,000 0 82,000
INFRASTRUCTURE.
Air Force.......................... Virginia................ Langley Air Force Base. COST TO COMPLETE-- 0 84,000 84,000
DORMITORY.
Air Force.......................... Worldwide Unspecified... Unspecified Worldwide.. BARRACKS REPLACEMENT 0 50,000 50,000
FUND.
Air Force.......................... Worldwide Unspecified... Unspecified Worldwide EDI: PLANNING & DESIGN. 5,648 0 5,648
Locations.
Air Force.......................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 429,266 0 429,266
Locations.
Air Force.......................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 64,900 0 64,900
Locations. MILITARY CONSTRUCTION.
Air Force.......................... Wyoming................. F.E. Warren Air Force COST TO COMPLETE: 0 18,000 18,000
Base. CONSOLIDATED HELO/TRF
OPS/AMU AND ALERT
FACILITY.
Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD INTEGRATED COMMAND 27,000 0 27,000
Base. CENTER (INC 2).
Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD INTEGRATED 85,000 0 85,000
Base. TRAINING CENTER.
Air Force.......................... Wyoming................. F.E. Warren Air Force GBSD MISSILE HANDLING 28,000 0 28,000
Base. COMPLEX (INC 2).
--------------------------
........................ ....................... Subtotal Military 2,605,314 1,310,800 3,916,114
Construction, Air
Force.
DEFENSE-WIDE ........................ ....................... ....................... ........... ........... ...........
Defense-Wide....................... Alabama................. Redstone Arsenal....... GROUND TEST FACILITY 147,975 -70,000 77,975
INFRASTRUCTURE.
Defense-Wide....................... California.............. Marine Corps Air AMBULATORY CARE CENTER-- 103,000 -82,400 20,600
Station Miramar. DENTAL CLINIC ADD//ALT.
Defense-Wide....................... California.............. Marine Corps Air ELECTRICAL 0 30,550 30,550
Station Miramar. INFRASTRUCTURE, ON-
SITE GENERATION, AND
MICROGRID IMPROVEMENTS.
Defense-Wide....................... California.............. Monterey............... COST TO COMPLETE: COGEN 0 5,460 5,460
PLANT AT B236.
Defense-Wide....................... California.............. Mountain View.......... INSTALL MICROGRID, 0 15,500 15,500
750KW PV, 750KWH BESS,
& 800KW GENERATOR
SYSTEM.
Defense-Wide....................... California.............. Naval Base Coronado.... COST TO COMPLETE: ATC 0 11,400 11,400
OPERATIONS SUPPORT
FACILITY.
Defense-Wide....................... California.............. Naval Base Coronado.... SOF NAVAL SPECIAL 0 51,000 51,000
WARFARE COMMAND
OPERATIONS SUPPORT
FACILITY, PHASE 2.
Defense-Wide....................... California.............. Naval Base San Diego... AMBULATORY CARE CENTER-- 101,644 -79,460 22,184
DENTAL CLINIC REPLMT.
Defense-Wide....................... California.............. Naval Base San Diego... MICROGRID AND BACKUP 0 6,300 6,300
POWER.
Defense-Wide....................... California.............. Naval Base Ventura COST TO COMPLETE: 0 16,840 16,840
County. GROUND MOUNTED SOLAR
PV.
Defense-Wide....................... California.............. Vandenberg Space Force MICROGRID WITH BACKUP 0 57,000 57,000
Base. POWER.
Defense-Wide....................... Colorado................ Buckley Space Force REDUNDANT ELECTRICAL 0 9,000 9,000
Base. SUPPLY.
Defense-Wide....................... Colorado................ Buckley Space Force REPLACEMENT WATER WELL. 0 5,700 5,700
Base.
Defense-Wide....................... Cuba.................... Guantanamo Bay Naval AMBULATORY CARE CENTER 60,000 0 60,000
Station. (INC 1).
Defense-Wide....................... Delaware................ Dover Air Force Base... ARMED SERVICES WHOLE 0 30,500 30,500
BLOOD PROCESSING
LABORATORY.
Defense-Wide....................... Diego Garcia............ Naval Support Facility MICROGRID ELECTRIC 0 16,820 16,820
Diego Garcia. DISTRIBUTION LINE
UPGRADE.
Defense-Wide....................... Djibouti................ Camp Lemonnier......... COST TO COMPLETE: 0 5,200 5,200
ENHANCE ENERGY
SECURITY AND CONTROL
SYSTEMS.
Defense-Wide....................... Florida................. Naval Air Station POTABLE WATER 0 31,220 31,220
Whiting Field. DISTRIBUTION SYSTEM.
Defense-Wide....................... Georgia................. Fort Benning........... COST TO COMPLETE: 5.2MW 0 27,351 27,351
MICROGRID & GENERATION
PLANT.
Defense-Wide....................... Georgia................. Kings Bay.............. COST TO COMPLETE: SCADA 0 2,700 2,700
MODERNIZATION.
Defense-Wide....................... Georgia................. Naval Submarine Base COST TO COMPLETE: 0 25,190 25,190
Kings Bay. ELECTRICAL
TRANSMISSION AND
DISTRIBUTION
IMPROVEMENTS (PHAS.
Defense-Wide....................... Georgia................. Naval Submarine Base ELECTRICAL TRANSMISSION 0 49,500 49,500
Kings Bay. AND DISTRIBUTION
IMPROVEMENTS, PHASE 2.
Defense-Wide....................... Germany................. Baumholder............. HUMAN PERFORMANCE 0 16,700 16,700
TRAINING CENTER.
Defense-Wide....................... Germany................. Baumholder............. SOF COMPANY OPERATIONS 41,000 0 41,000
FACILITY.
Defense-Wide....................... Germany................. Baumholder............. SOF JOINT PARACHUTE 23,000 0 23,000
RIGGING FACILITY.
Defense-Wide....................... Germany................. Kaiserslautern Air Base KAISERSLAUTERN MIDDLE 21,275 0 21,275
SCHOOL.
Defense-Wide....................... Germany................. Ramstein Air Base...... RAMSTEIN MIDDLE SCHOOL. 181,764 0 181,764
Defense-Wide....................... Germany................. Rhine Ordnance Barracks MEDICAL CENTER 77,210 0 77,210
REPLACEMENT (INC 11).
Defense-Wide....................... Germany................. Stuttgart.............. ROBINSON BARRACKS ELEM 8,000 0 8,000
SCHOOL REPLACEMENT.
Defense-Wide....................... Hawaii.................. Joint Base Pearl Harbor- COST TO COMPLETE: FY20 0 7,476 7,476
Hickam. 500 KW PV COVERED
PARKING EV CHARGING
STATION.
Defense-Wide....................... Hawaii.................. Joint Base Pearl Harbor- COST TO COMPLETE: 0 13,040 13,040
Hickam. PRIMARY ELECTRICAL
DISTRIBUTION.
Defense-Wide....................... Honduras................ Soto Cano Air Base..... FUEL FACILITIES........ 41,300 0 41,300
Defense-Wide....................... Italy................... Naples................. COST TO COMPLETE: SMART 0 7,610 7,610
GRID.
Defense-Wide....................... Japan................... Fleet Activities KINNICK HIGH SCHOOL 70,000 0 70,000
Yokosuka. (INC).
Defense-Wide....................... Japan................... Kadena Air Base........ PDI: SOF MAINTENANCE 88,900 0 88,900
HANGAR.
Defense-Wide....................... Japan................... Kadena Air Base........ PDI: SOF COMPOSITE 11,400 0 11,400
MAINTENANCE FACILITY.
Defense-Wide....................... Kansas.................. Forbes Field........... MICROGRID AND BACKUP 0 5,850 5,850
POWER.
Defense-Wide....................... Kansas.................. Fort Riley............. COST TO COMPLETE: POWER 0 15,468 15,468
GENERATION AND
MICROGRID.
Defense-Wide....................... Korea................... K-16 Air Base.......... K-16 EMERGENCY BACKUP 0 5,650 5,650
POWER.
Defense-Wide....................... Kuwait.................. Camp Arifjan........... COST TO COMPLETE: POWER 0 8,197 8,197
GENERATION AND
MICROGRID.
Defense-Wide....................... Kuwait.................. Camp Buehring.......... MICROGRID AND BACKUP 0 18,850 18,850
POWER.
Defense-Wide....................... Louisiana............... Naval Air Station Joint COST TO COMPLETE: 0 6,453 6,453
Reserve Base New DISTRIBUTION
Orleans. SWITCHGEAR.
Defense-Wide....................... Maryland................ Bethesda Naval Hospital MEDICAL CENTER ADDITION/ 101,816 0 101,816
ALTERATION (INC 7).
Defense-Wide....................... Maryland................ Fort Meade............. NSAW MISSION OPS AND 105,000 0 105,000
RECORDS CENTER (INC).
Defense-Wide....................... Maryland................ Fort Meade............. NSAW RECAP BUILDING 4 315,000 0 315,000
(INC).
Defense-Wide....................... Maryland................ Fort Meade............. NSAW RECAP BUILDING 5 65,000 0 65,000
(ECB 5) (INC).
Defense-Wide....................... Maryland................ Joint Base Andrews..... HYDRANT FUELING SYSTEM. 38,300 0 38,300
Defense-Wide....................... Missouri................ Lake City Army MICROGRID AND BACKUP 0 80,100 80,100
Ammunition Plant. POWER.
Defense-Wide....................... Montana................. Great Falls FUEL FACILITIES........ 30,000 0 30,000
International Airport.
Defense-Wide....................... Nebraska................ Offutt Air Force Base.. DEFENSE POW/MIA 0 5,000 5,000
ACCOUNTABILITY AGENCY
LABORATORY (P&D).
Defense-Wide....................... Nebraska................ Offutt Air Force Base.. MICROGRID AND BACKUP 0 41,000 41,000
POWER.
Defense-Wide....................... New Jersey.............. Sea Girt............... UNDERGROUND ELECTRICAL 0 44,000 44,000
DISTRIBUTION SYSTEM.
Defense-Wide....................... North Carolina.......... Fort Liberty........... COST TO COMPLETE: FORT 0 1,418 1,418
LIBERTY EMERGENCY
WATER SYSTEM.
Defense-Wide....................... North Carolina.......... Fort Liberty (Camp MICROGRID AND BACKUP 0 10,500 10,500
Mackall). POWER.
Defense-Wide....................... North Carolina.......... Marine Corps Base Camp MARINE RAIDER BATTALION 0 70,000 70,000
Lejeune. OPERATIONS FACILITY.
Defense-Wide....................... Oklahoma................ Fort Sill.............. MICROGRID AND BACKUP 0 76,650 76,650
POWER.
Defense-Wide....................... Pennsylvania............ Fort Indiantown Gap.... COST TO COMPLETE: 0 9,250 9,250
GEOTHERMAL AND SOLAR
PV.
Defense-Wide....................... Puerto Rico............. Fort Buchanan.......... MICROGRID AND BACKUP 0 56,000 56,000
POWER.
Defense-Wide....................... Puerto Rico............. Juana Diaz............. COST TO COMPLETE: 0 7,680 7,680
MICROGRID CONTROLS,
690 KW PV, 275KW GEN,
570 KWH BESS.
Defense-Wide....................... Puerto Rico............. Ramey.................. COST TO COMPLETE: 0 6,360 6,360
MICROGRID CONTROL
SYSTEM, 460 KW PV,
275KW GEN, 660 KWH BES.
Defense-Wide....................... Spain................... Naval Station Rota..... BULK TANK FARM, PHASE 1 80,000 0 80,000
Defense-Wide....................... Texas................... Fort Cavazos........... CENTRAL CHILLED WATER 0 32,000 32,000
PLANT.
Defense-Wide....................... Texas................... Fort Cavazos........... COST TO COMPLETE: POWER 0 18,900 18,900
GENERATION AND
MICROGRID.
Defense-Wide....................... Texas................... Fort Cavazos........... MICROGRID AND BACKUP 0 18,250 18,250
POWER.
Defense-Wide....................... Utah.................... Camp Williams.......... MICROGRID & WIND 0 20,100 20,100
TURBINE.
Defense-Wide....................... Utah.................... Hill Air Force Base.... OPEN STORAGE........... 14,200 0 14,200
Defense-Wide....................... Virginia................ Fort Belvoir........... DIA HEADQUARTERS ANNEX. 185,000 -160,000 25,000
Defense-Wide....................... Virginia................ Hampton Roads.......... COST TO COMPLETE: 0 1,200 1,200
BACKUP POWER
GENERATION.
Defense-Wide....................... Virginia................ Joint Expeditionary SOF SDVT2 OPERATIONS 61,000 0 61,000
Base Little Creek-- SUPPORT FACILITY.
Fort Story.
Defense-Wide....................... Virginia................ Fort Belvoir (NGA COST TO COMPLETE: 0 550 550
Campus East). CHILLED WATER
REDUNDANCY.
Defense-Wide....................... Virginia................ Pentagon............... HVAC EFFICIENCY 0 2,250 2,250
UPGRADES.
Defense-Wide....................... Virginia................ Pentagon............... SEC OPS AND PEDESTRIAN 30,600 0 30,600
ACCESS FACS.
Defense-Wide....................... Washington.............. Joint Base Lewis- POWER GENERATION AND 0 49,850 49,850
McChord. MICROGRID.
Defense-Wide....................... Washington.............. Joint Base Lewis- SOF CONSOLIDATED 62,000 0 62,000
McChord. RIGGING FACILITY.
Defense-Wide....................... Washington.............. Manchester............. BULK STORAGE TANKS, 71,000 0 71,000
PHASE 2.
Defense-Wide....................... Washington.............. Naval Base Kitsap...... MAIN SUBSTATION 0 31,520 31,520
REPLACEMENT AND
MICROGRID.
Defense-Wide....................... Washington.............. Naval Magazine Indian MICROGRID AND BACKUP 0 37,770 37,770
Island. POWER.
Defense-Wide....................... Washington.............. Naval Undersea Warfare SOF COLD WATER TRAINING 0 37,000 37,000
Center Keyport. AUSTERE ENVIRONMENT
FACILITY.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide.. INDOPACOM UNSPECIFIED 0 62,000 62,000
MINOR MILITARY
CONSTRUCTION.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide ENERGY RESILIENCE AND 548,000 -548,000 0
Locations. CONSERV. INVEST. PROG..
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide ERCIP PLANNING & DESIGN 86,250 0 86,250
Locations.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide EXERCISE RELATED MINOR 11,107 0 11,107
Locations. CONSTRUCTION.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (DHA) 49,610 0 49,610
Locations.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 32,579 0 32,579
Locations. (Defense-Wide).
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 30,215 0 30,215
Locations. (CYBERCOM).
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 25,130 0 25,130
Locations. (SOCOM).
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (DLA) 24,000 0 24,000
Locations.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN 8,568 0 8,568
Locations. (DODEA).
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (NSA) 3,068 0 3,068
Locations.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (TJS) 2,000 0 2,000
Locations.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (MDA) 1,035 0 1,035
Locations.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN (WHS) 590 0 590
Locations.
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 19,271 0 19,271
Locations. CONSTRUCTION (SOCOM).
Defense-Wide....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 3,000 0 3,000
Locations. CONSTRUCTION (DEFENSE-
WIDE).
Defense-Wide....................... Worldwide Unspecified... Various Worldwide UNSPECIFIED MINOR 4,875 0 4,875
Locations. CONSTRUCTION (DLA).
Defense-Wide....................... Wyoming................. F.E. Warren Air Force MICROGRID AND BATTERY 0 25,000 25,000
Base. STORAGE.
--------------------------
Subtotal Military 2,984,682 307,013 3,291,695
Construction, Defense-
Wide.
ARMY NATIONAL GUARD
Army National Guard................ Alabama................. Fort McClellan......... COST TO COMPLETE: 0 7,000 7,000
ENLISTED BARRACKS, TT.
Army National Guard................ Alabama................. Huntsville............. COST TO COMPLETE: 0 4,650 4,650
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Arizona................. Surprise Readiness NATIONAL GUARD 15,000 0 15,000
Center. READINESS CENTER.
Army National Guard................ Arkansas................ Fort Chaffee........... COST TO COMPLETE: 0 610 610
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ California.............. Bakersfield............ COST TO COMPLETE: 0 1,000 1,000
VEHICLE MAINTENANCE
SHOP.
Army National Guard................ California.............. Camp Roberts........... COST TO COMPLETE: 0 5,000 5,000
AUTOMATED MULTIPURPOSE
MACHINE GUN (MPMG)
RANGE.
Army National Guard................ Colorado................ Peterson Space Force COST TO COMPLETE: 0 3,000 3,000
Base. NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Connecticut............. Putnam................. COST TO COMPLETE: 0 6,125 6,125
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Florida................. Camp Blanding.......... MULTIPURPOSE MACHINE 0 11,000 11,000
GUN RANGE.
Army National Guard................ Guam.................... Barrigada.............. COST TO COMPLETE: 0 6,900 6,900
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Idaho................... Jerome................. COST TO COMPLETE: 0 1,250 1,250
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Idaho................... Jerome County Regional NATIONAL GUARD VEHICLE 17,000 0 17,000
Site. MAINTENANCE SHOP.
Army National Guard................ Illinois................ Bloomington............ COST TO COMPLETE: 0 5,250 5,250
NATIONAL GUARD VEHICLE
MAINTENANCE SHOP.
Army National Guard................ Illinois................ North Riverside Armory. NATIONAL GUARD VEHICLE 24,000 0 24,000
MAINTENANCE SHOP.
Army National Guard................ Indiana................. Shelbyville............ COST TO COMPLETE: 0 5,000 5,000
NATIONAL GUARD
READINESS CENTER ADD/
ALT.
Army National Guard................ Kansas.................. Topeka................. COST TO COMPLETE: 0 5,856 5,856
NATIONAL GUARD/RESERVE
CENTER BUILDING.
Army National Guard................ Kentucky................ Burlington............. VEHICLE MAINTENANCE 0 16,400 16,400
SHOP.
Army National Guard................ Kentucky................ Frankfort.............. COST TO COMPLETE: 0 2,000 2,000
NATIONAL GUARD/RESERVE
CENTER BUILDING.
Army National Guard................ Louisiana............... Camp Beauregard........ COLLECTIVE TRAINING 0 2,400 2,400
UNACCOMPANIED HOUSING
OPEN-BAY (P&D).
Army National Guard................ Louisiana............... Camp Beauregard........ COST TO COMPLETE: 0 2,000 2,000
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Louisiana............... Camp Minden............ COST TO COMPLETE: 0 3,718 3,718
COLLECTIVE TRAINING
UNACCOMPANIED HOUSING,
OPEN BAY.
Army National Guard................ Maine................... Northern Maine Range AUTOMATED MULTIPURPOSE 0 2,800 2,800
Complex. MACHINE GUN RANGE
(P&D).
Army National Guard................ Maine................... Saco................... COST TO COMPLETE: 0 7,420 7,420
NATIONAL GUARD VEHICLE
MAINTENANCE SHOP.
Army National Guard................ Massachusetts........... Camp Edwards........... COST TO COMPLETE: 0 3,000 3,000
AUTOMATED MULTIPURPOSE
MACHINE GUN (MPMG)
RANGE.
Army National Guard................ Mississippi............. Camp Shelby............ CAMP SHELBY JFTC 0 2,200 2,200
RAILHEAD EXPANSION
(P&D).
Army National Guard................ Mississippi............. Camp Shelby............ COST TO COMPLETE: 0 5,425 5,425
MANEUVER AREA TRAINING
EQUIPMENT SITE
ADDITION.
Army National Guard................ Mississippi............. Southaven.............. NATIONAL GUARD 0 22,000 22,000
READINESS CENTER.
Army National Guard................ Missouri................ Belle Fontaine......... NATIONAL GUARD 28,000 0 28,000
READINESS CENTER.
Army National Guard................ Nebraska................ Bellevue............... COST TO COMPLETE: 0 9,090 9,090
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Nebraska................ Greenlief Training Site COLLECTIVE TRAINING 0 1,200 1,200
UNACCOMPANIED HOUSING
OPEN-BAY (P&D).
Army National Guard................ Nebraska................ Mead Training Site..... COST TO COMPLETE: 0 1,912 1,912
COLLECTIVE TRAINING
UNACCOMPANIED HOUSING,
OPEN BAY.
Army National Guard................ Nebraska................ North Platte........... COST TO COMPLETE: 0 400 400
NATIONAL GUARD VEHICLE
MAINTENANCE SHOP.
Army National Guard................ New Hampshire........... Concord................ COST TO COMPLETE: 0 200 200
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ New Hampshire........... Littleton.............. NATIONAL GUARD VEHICLE 23,000 0 23,000
MAINTENANCE SHOP ADD.
Army National Guard................ New Jersey.............. Joint Base McGuire-Dix- COST TO COMPLETE: 0 605 605
Lakehurst. NATIONAL GUARD
READINESS CENTER.
Army National Guard................ New Mexico.............. Rio Rancho Training NATIONAL GUARD VEHICLE 11,000 0 11,000
Site. MAINTENANCE SHOP ADD.
Army National Guard................ New York................ Lexington Avenue Armory NATIONAL GUARD 0 70,000 70,000
READINESS CENTER.
Army National Guard................ North Carolina.......... Salisbury.............. ARMY AVIATION SUPPORT 0 2,200 2,200
FACILITIES (P&D).
Army National Guard................ North Dakota............ Camp Grafton........... INSTITUTIONAL POST- 0 1,950 1,950
INITIAL MILITARY
TRAINING,
UNACCOMPANIED HOUSING
(P&D).
Army National Guard................ North Dakota............ Dickinson.............. COST TO COMPLETE: 0 5,425 5,425
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Ohio.................... Camp Perry Joint NATIONAL GUARD 19,200 0 19,200
Training Center. READINESS CENTER.
Army National Guard................ Ohio.................... Columbus............... COST TO COMPLETE: 0 4,000 4,000
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Oklahoma................ Ardmore................ COST TO COMPLETE: 0 400 400
VEHICLE MAINTENANCE
SHOP.
Army National Guard................ Oregon.................. Washington County NATIONAL GUARD 26,000 0 26,000
Readiness Center. READINESS CENTER.
Army National Guard................ Pennsylvania............ Hermitage Readiness NATIONAL GUARD 13,600 0 13,600
Center. READINESS CENTER.
Army National Guard................ Pennsylvania............ Moon Township.......... COST TO COMPLETE: 0 3,100 3,100
COMBINED SUPPORT
MAINTENANCE SHOP.
Army National Guard................ Puerto Rico............. Fort Allen............. COST TO COMPLETE: 0 3,678 3,678
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Rhode Island............ Camp Fogarty Training COLLECTIVE TRAINING 0 1,990 1,990
Site. UNACCOMPANIED HOUSING
OPEN-BAY (P&D).
Army National Guard................ Rhode Island............ North Kingstown........ NATIONAL GUARD 0 30,000 30,000
READINESS CENTER.
Army National Guard................ South Carolina.......... Aiken County Readiness NATIONAL GUARD 20,000 0 20,000
Center. READINESS CENTER.
Army National Guard................ South Carolina.......... Joint Base Charleston.. COST TO COMPLETE: 0 4,373 4,373
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ South Carolina.......... McCrady Training Center AUTOMATED MULTIPURPOSE 7,900 0 7,900
MACHINE GUN RANGE.
Army National Guard................ South Dakota............ Sioux Falls............ COST TO COMPLETE: 0 5,250 5,250
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Tennessee............... Campbell Army Air Field ARMY AIR TRAFFIC 0 2,500 2,500
CONTROL TOWERS (P&D).
Army National Guard................ Tennessee............... McMinnville............ COST TO COMPLETE: 0 500 500
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Texas................... Fort Cavazos........... GENERAL INSTRUCTION 0 2,685 2,685
BUILDING (P&D).
Army National Guard................ Texas................... Fort Worth............. COST TO COMPLETE: 0 6,489 6,489
AIRCRAFT MAINTENANCE
HANGAR ADD/ALT.
Army National Guard................ Texas................... Fort Worth............. COST TO COMPLETE: 0 381 381
NATIONAL GUARD VEHICLE
MAINTENANCE SHOP.
Army National Guard................ Utah.................... Camp Williams.......... COLLECTIVE TRAINING 0 2,875 2,875
UNACCOMPANIED HOUSING,
SENIOR NCO AND OFFICER
(P&D).
Army National Guard................ Vermont................. Bennington............. COST TO COMPLETE: 0 3,415 3,415
NATIONAL GUARD
READINESS CENTER.
Army National Guard................ Virgin Islands.......... St. Croix.............. COST TO COMPLETE: ARMY 0 4,200 4,200
AVIATION SUPPORT
FACILITY.
Army National Guard................ Virgin Islands.......... St. Croix.............. COST TO COMPLETE: READY 0 1,710 1,710
BUILDING.
Army National Guard................ Virginia................ Sandston RC & FMS 1.... AIRCRAFT MAINTENANCE 20,000 0 20,000
HANGAR.
Army National Guard................ Virginia................ Troutville............. COST TO COMPLETE: 0 2,415 2,415
COMBINED SUPPORT
MAINTENANCE SHOP
ADDITION.
Army National Guard................ Virginia................ Troutville............. COST TO COMPLETE: 0 2,135 2,135
NATIONAL GUARD
READINESS CENTER
ADDITION.
Army National Guard................ West Virginia........... Parkersburg............ NATIONAL GUARD 0 3,300 3,300
READINESS CENTER (P&D).
Army National Guard................ Wisconsin............... Viroqua................ NATIONAL GUARD 18,200 0 18,200
READINESS CENTER.
Army National Guard................ Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 34,286 0 34,286
Locations.
Army National Guard................ Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 63,000 0 63,000
Locations. CONSTRUCTION.
........................ ....................... Subtotal Military 340,186 310,382 650,568
Construction, Army
National Guard.
ARMY RESERVE ........................ ....................... ....................... ........... ........... ...........
Army Reserve....................... Alabama................. Birmingham............. ARMY RESERVE CENTER/ 57,000 0 57,000
AMSA/LAND.
Army Reserve....................... Arizona................. San Tan Valley......... AREA MAINTENANCE 12,000 0 12,000
SUPPORT ACTIVITY.
Army Reserve....................... California.............. Camp Pendleton......... COST TO COMPLETE: AREA 0 3,000 3,000
MAINTENANCE SUPPORT
ACTIVITY.
Army Reserve....................... California.............. Fort Hunter Liggett.... NETWORK ENTERPRISE 0 40,000 40,000
CENTER.
Army Reserve....................... California.............. Parks Reserve Forces ADVANCED SKILLS 0 35,000 35,000
Training Area. TRAINING BARRACKS.
Army Reserve....................... Georgia................. Marine Corps Logistics ARMY RESERVE CENTER.... 0 40,000 40,000
Base Albany.
Army Reserve....................... Florida................. Perrine................ COST TO COMPLETE: ARMY 0 3,000 3,000
RESERVE CENTER.
Army Reserve....................... Massachusetts........... Devens Reserve Forces COLLECTIVE TRAINING 0 39,000 39,000
Training Area. ENLISTED BARRACKS.
Army Reserve....................... North Carolina.......... Asheville.............. COST TO COMPLETE: ARMY 0 12,000 12,000
RESERVE CENTER.
Army Reserve....................... Ohio.................... Wright-Patterson Air COST TO COMPLETE: ARMY 0 5,000 5,000
Force Base. RESERVE CENTER.
Army Reserve....................... Puerto Rico............. Fort Buchanan.......... ADVANCED SKILLS 0 39,000 39,000
TRAINING BARRACKS.
Army Reserve....................... Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 23,389 0 23,389
Locations.
Army Reserve....................... Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 14,687 0 14,687
Locations. CONSTRUCTION.
--------------------------
........................ ....................... Subtotal Military 107,076 216,000 323,076
Construction, Army
Reserve.
NAVY RESERVE & MARINE CORPS RESERVE ........................ ....................... ....................... ........... ........... ...........
Navy Reserve & Marine Corps Reserve Michigan................ Battle Creek........... ORGANIC SUPPLY 24,549 0 24,549
FACILITIES.
Navy Reserve & Marine Corps Reserve Virginia................ Marine Forces Reserve G/ATOR SUPPORT 12,400 0 12,400
Dam Neck Virginia FACILITIES.
Beach.
Navy Reserve & Marine Corps Reserve Worldwide Unspecified... Unspecified Worldwide MCNR PLANNING & DESIGN. 6,495 0 6,495
Locations.
Navy Reserve & Marine Corps Reserve Worldwide Unspecified... Unspecified Worldwide MCNR UNSPECIFIED MINOR 7,847 0 7,847
Locations. CONSTRUCTION.
--------------------------
........................ ....................... Subtotal Military 51,291 0 51,291
Construction, Navy
Reserve & Marine Corps
Reserve.
AIR NATIONAL GUARD ........................ ....................... ....................... ........... ........... ...........
Air National Guard................. Alabama................. Montgomery Regional F-35 ADAL SQ OPS BLDG 7,000 0 7,000
Airport. 1303.
Air National Guard................. Alaska.................. Eielson Air Force Base. AMC STANDARD DUAL BAY 0 3,700 3,700
HANGAR (P&D).
Air National Guard................. Alaska.................. Joint Base Elmendorf- ADAL ALERT CREW 0 7,000 7,000
Richardson. FACILITY HGR 18.
Air National Guard................. Arizona................. Tucson International MCCA: AIRCRAFT 11,600 0 11,600
Airport. ARRESTING SYSTEM (NEW
RWY).
Air National Guard................. Arkansas................ Ebbing Air National 3-BAY HANGAR........... 0 54,000 54,000
Guard Base.
Air National Guard................. Arkansas................ Ebbing Air National AIRCREW FLIGHT 0 9,300 9,300
Guard Base. EQUIPMENT/STEP.
Air National Guard................. Arkansas................ Ebbing Air National SPECIAL ACCESS PROGRAM 0 12,700 12,700
Guard Base. FACILITY.
Air National Guard................. Colorado................ Buckley Space Force AIRCRAFT CORROSION 12,000 0 12,000
Base. CONTROL.
Air National Guard................. Georgia................. Savannah/Hilton Head DINING HALL AND 0 27,000 27,000
International Airport. SERVICES TRAINING
FACILITY.
Air National Guard................. Indiana................. Fort Wayne FIRE STATION........... 8,900 0 8,900
International Airport.
Air National Guard................. Mississippi............. Field Air National COST TO COMPLETE: 172ND 0 8,000 8,000
Guard Base. AIRLIFT WING FIRE/
CRASH RESCUE STATION.
Air National Guard................. Missouri................ Rosecrans Air National 139TH AIRLIFT WING 0 2,000 2,000
Guard Base. ENTRY CONTROL POINT
(P&D).
Air National Guard................. Missouri................ Rosecrans Air National ENTRY CONTROL POINT 0 2,000 2,000
Guard Base. (P&D).
Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 22,000 0 22,000
Airport. COMPLEX, PHASE 1.
Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 18,500 0 18,500
Airport. COMPLEX, PHASE 2.
Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 0 20,000 20,000
Airport. COMPLEX, PHASE 3.
Air National Guard................. Oregon.................. Portland International SPECIAL TACTICS 0 11,000 11,000
Airport. COMPLEX, PHASE 4.
Air National Guard................. Pennsylvania............ Harrisburg ENTRY CONTROL FACILITY. 0 8,000 8,000
International Airport.
Air National Guard................. Wisconsin............... Truax Field............ F-35: MM&I FAC, B701... 0 5,200 5,200
Air National Guard................. Wisconsin............... Volk Air National Guard FIRE/CRASH RESCUE 0 670 670
Base. STATION (P&D).
Air National Guard................. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 35,600 0 35,600
Locations.
Air National Guard................. Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 63,122 0 63,122
Locations. CONSTRUCTION.
--------------------------
........................ ....................... Subtotal Military 178,722 170,570 349,292
Construction, Air
National Guard.
AIR FORCE RESERVE ........................ ....................... ....................... ........... ........... ...........
Air Force Reserve.................. Arizona................. Davis-Monthan Air Force GUARDIAN ANGEL POTFF 0 8,500 8,500
Base. FACILITY.
Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 ADD/ALTER B1244 17,000 0 17,000
FUT/CARGO PALLET
STORAGE.
Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 ADD/ALTER B6000 8,500 0 8,500
SIMULATOR FACILITY.
Air Force Reserve.................. California.............. March Air Reserve Base. KC-46 TWO BAY 201,000 0 201,000
MAINTENANCE/FUEL
HANGAR.
Air Force Reserve.................. Guam.................... Joint Region Marianas.. AERIAL PORT FACILITY... 27,000 0 27,000
Air Force Reserve.................. Louisiana............... Barksdale Air Force 307 BW MEDICAL FACILITY 0 7,000 7,000
Base. ADDITION.
Air Force Reserve.................. Ohio.................... Youngstown Air Reserve BASE FIRE STATION (P&D) 0 2,500 2,500
Station.
Air Force Reserve.................. Texas................... Naval Air Station Joint LRS WAREHOUSE.......... 16,000 0 16,000
Reserve Base Fort
Worth.
Air Force Reserve.................. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 12,146 0 12,146
Locations.
Air Force Reserve.................. Worldwide Unspecified... Unspecified Worldwide UNSPECIFIED MINOR 9,926 0 9,926
Locations. MILITARY CONSTRUCTION.
--------------------------
........................ ....................... Subtotal Military 291,572 18,000 309,572
Construction, Air
Force Reserve.
NATO SECURITY INVESTMENT PROGRAM ........................ ....................... ....................... ........... ........... ...........
NATO............................... Worldwide Unspecified... NATO Security NATO SECURITY 293,434 0 293,434
Investment Program. INVESTMENT PROGRAM.
........................ ....................... Subtotal NATO Security 293,434 0 293,434
Investment Program.
INDOPACIFIC COMBATANT COMMAND ........................ ....................... ....................... ........... ........... ...........
MILCON, INDOPACOM.................. Worldwide Unspecified... Unspecified Worldwide INDOPACOM MILITARY 0 150,000 150,000
Locations. CONSTRUCTION PILOT
PROGRAM.
Subtotal Base 0 150,000 150,000
Realignment and
Closure--Defense-Wide.
TOTAL INDOPACIFIC 0 150,000 150,000
COMBATANT COMMAND.
TOTAL MILITARY 14,345,019 2,359,215 16,704,234
CONSTRUCTION.
FAMILY HOUSING
FAMILY HOUSING CONSTRUCTION, ARMY
Fam Hsg Con, Army.................. Georgia................. Fort Eisenhower........ FORT EISENHOWER MHPI 50,000 0 50,000
EQUITY INVESTMENT.
Fam Hsg Con, Army.................. Germany................. Baumholder............. FAMILY HOUSING NEW 78,746 0 78,746
CONSTRUCTION.
Fam Hsg Con, Army.................. Kwajalein............... Kwajalein Atoll........ FAMILY HOUSING 98,600 0 98,600
REPLACEMENT
CONSTRUCTION.
Fam Hsg Con, Army.................. Missouri................ Fort Leonard Wood...... FORT LEONARD WOOD MHPI 50,000 0 50,000
EQUITY INVESTMENT.
Fam Hsg Con, Army.................. Worldwide Unspecified... Unspecified Worldwide FAMILY HOUSING P&D..... 27,549 0 27,549
Locations.
--------------------------
Subtotal Family Housing 304,895 0 304,895
Construction, Army.
FAMILY HOUSING O&M, ARMY
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 12,121 0 12,121
Locations.
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 86,019 0 86,019
Locations. SUPPORT.
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide LEASING................ 112,976 0 112,976
Locations.
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 86,706 0 86,706
Locations.
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 41,121 0 41,121
Locations.
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 554 0 554
Locations.
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide SERVICES............... 7,037 0 7,037
Locations.
Fam Hsg O&M, Army.................. Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 38,951 0 38,951
Locations.
--------------------------
Subtotal Family Housing 385,485 0 385,485
Operation And
Maintenance, Army.
FAMILY HOUSING CONSTRUCTION, NAVY &
MARINE CORPS
Fam Hsg Con, Navy & Marine Corps... Guam.................... Joint Region Marianas.. REPLACE ANDERSEN 121,906 0 121,906
HOUSING, PHASE 8.
Fam Hsg Con, Navy & Marine Corps... Guam.................... Naval Support Activity REPLACE ANDERSEN 83,126 0 83,126
Andersen. HOUSING (AF), PHASE 7.
Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide DESIGN, WASHINGTON DC.. 4,782 0 4,782
Locations.
Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide IMPROVEMENTS, 57,740 0 57,740
Locations. WASHINGTON DC.
Fam Hsg Con, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide USMC DPRI/GUAM PLANNING 9,588 0 9,588
Locations. & DESIGN.
--------------------------
Subtotal Family Housing 277,142 0 277,142
Construction, Navy &
Marine Corps.
FAMILY HOUSING O&M, NAVY & MARINE
CORPS
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 17,744 0 17,744
Locations.
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 65,655 0 65,655
Locations. SUPPORT.
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide LEASING................ 60,214 0 60,214
Locations.
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 101,356 0 101,356
Locations.
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 61,896 0 61,896
Locations.
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 419 0 419
Locations.
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide SERVICES............... 13,250 0 13,250
Locations.
Fam Hsg O&M, Navy & Marine Corps... Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 43,320 0 43,320
Locations.
--------------------------
Subtotal Family Housing 363,854 0 363,854
Operation &
Maintenance, Navy &
Marine Corps.
FAMILY HOUSING CONSTRUCTION, AIR
FORCE
Fam Hsg Con, Air Force............. Alabama................. Maxwell Air Force Base. MHPI RESTRUCTURE-AETC 65,000 0 65,000
GROUP II.
Fam Hsg Con, Air Force............. Colorado................ U.S. Air Force Academy. CONSTRUCTION 9,282 0 9,282
IMPROVEMENT--CARLTON
HOUSE.
Fam Hsg Con, Air Force............. Hawaii.................. Joint Base Pearl Harbor- MHPI RESTRUCTURE-JOINT 75,000 0 75,000
Hickam. BASE PEARL HARBOR-
HICKAM.
Fam Hsg Con, Air Force............. Mississippi............. Keesler Air Force Base. MHPI RESTRUCTURE- 80,000 0 80,000
SOUTHERN GROUP.
Fam Hsg Con, Air Force............. Japan................... Yokota Air Base........ IMPROVE FAMILY HOUSING 0 27,000 27,000
PAIP 9, PHASE 1 (24
UNITS).
Fam Hsg Con, Air Force............. Worldwide Unspecified... Unspecified Worldwide PLANNING & DESIGN...... 7,815 0 7,815
Locations.
--------------------------
Subtotal Family Housing 237,097 27,000 264,097
Construction, Air
Force.
FAMILY HOUSING O&M, AIR FORCE
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide FURNISHINGS............ 12,884 11,000 23,884
Locations.
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide HOUSING PRIVATIZATION 31,803 0 31,803
Locations. SUPPORT.
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide LEASING................ 5,143 0 5,143
Locations.
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 135,410 -11,000 124,410
Locations.
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MANAGEMENT............. 68,023 0 68,023
Locations.
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide MISCELLANEOUS.......... 2,377 0 2,377
Locations.
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide SERVICES............... 10,692 0 10,692
Locations.
Fam Hsg O&M, Air Force............. Worldwide Unspecified... Unspecified Worldwide UTILITIES.............. 48,054 0 48,054
Locations.
--------------------------
Subtotal Family Housing 314,386 0 314,386
Operation And
Maintenance, Air Force.
FAMILY HOUSING O&M, DEFENSE-WIDE
Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS (DIA)...... 673 0 673
Locations.
Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide FURNISHINGS (NSA)...... 89 0 89
Locations.
Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide LEASING (DIA).......... 32,042 0 32,042
Locations.
Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide LEASING (NSA).......... 13,658 0 13,658
Locations.
Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide MAINTENANCE............ 35 0 35
Locations.
Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide UTILITIES (DIA)........ 4,273 0 4,273
Locations.
Fam Hsg O&M, Defense-Wide.......... Worldwide Unspecified... Unspecified Worldwide UTILITIES (NSA)........ 15 0 15
Locations.
--------------------------
Subtotal Family Housing 50,785 0 50,785
Operation And
Maintenance, Defense-
Wide.
FAMILY HOUSING IMPROVEMENT FUND
Family Housing Improvement Fund.... Worldwide Unspecified... Unspecified Worldwide ADMINISTRATIVE 6,611 0 6,611
Locations. EXPENSES--FHIF.
--------------------------
Subtotal Family Housing 6,611 0 6,611
Improvement Fund.
UNACCOMPANIED HOUSING IMPROVEMENT
FUND
Unaccompanied Housing Improvement Worldwide Unspecified ADMINISTRATIVE 496.................... 0 496
Fund. Unspecified Worldwide EXPENSES--UHIF.
Locations.
--------------------------
Subtotal Unaccompanied 496 0 496
Housing Improvement
Fund.
TOTAL FAMILY HOUSING... 1,940,751 27,000 1,967,751
DEFENSE BASE REALIGNMENT AND CLOSURE
BASE REALIGNMENT AND CLOSURE, ARMY
BRAC, Army......................... Worldwide Unspecified BASE REALIGNMENT AND 150,640................ 0 150,640
Unspecified Worldwide CLOSURE.
Locations.
--------------------------
Subtotal Base 150,640 0 150,640
Realignment and
Closure--Army.
BASE REALIGNMENT AND CLOSURE, NAVY
BRAC, Navy......................... Worldwide Unspecified... Unspecified Worldwide BASE REALIGNMENT AND 108,818 0 108,818
Locations. CLOSURE.
--------------------------
Subtotal Base 108,818 0 108,818
Realignment and
Closure--Navy.
BASE REALIGNMENT AND CLOSURE, AIR
FORCE
BRAC, Air Force.................... Worldwide Unspecified... Unspecified Worldwide BASE REALIGNMENT AND 123,990 0
Locations. CLOSURE.
--------------------------
Subtotal Base 123,990 0 123,990
Realignment and
Closure--Air Force.
BASE REALIGNMENT AND CLOSURE, DEFENSE-
WIDE
BRAC, Defense-Wide................. Worldwide Unspecified... Unspecified Worldwide INT-4: DLA ACTIVITIES.. 5,726 0 5,726
Locations.
--------------------------
Subtotal Base 5,726 0 5,726
Realignment and
Closure--Defense-Wide.
TOTAL DEFENSE BASE 389,174 0 389,174
REALIGNMENT AND
CLOSURE.
TOTAL MILITARY 16,674,944 2,386,215 19,061,159
CONSTRUCTION, FAMILY
HOUSING, AND BRAC.
--------------------------------------------------------------------------------------------------------------------------------------------------------
TITLE XXI--ARMY MILITARY CONSTRUCTION
SEC. 2101. AUTHORIZED ARMY CONSTRUCTION AND LAND ACQUISITION
PROJECTS.
(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:
Army: Inside the United States
----------------------------------------------------------------------------------------------------------------
State Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
Alabama........................................ Redstone Arsenal.............................. $50,000,000
Florida........................................ Eglin Air Force Base.......................... $75,000,000
Georgia........................................ Fort Eisenhower............................... $163,000,000
Hawaii......................................... Aliamanu Military Reservation................. $20,000,000
Fort Shafter.................................. $23,000,000
Helemano Military Reservation................. $33,000,000
Schofield Barracks............................ $37,000,000
Illinois....................................... Rock Island Arsenal........................... $44,000,000
Kansas......................................... Fort Riley.................................... $105,000,000
Kentucky....................................... Fort Campbell................................. $38,000,000
Louisiana...................................... Fort Johnson.................................. $119,400,000
Maryland....................................... Fort Meade.................................... $50,000,000
Massachusetts.................................. Soldier Systems Center Natick................. $18,500,000
Michigan....................................... Detroit Arsenal............................... $72,000,000
New York....................................... Fort Hamilton................................. $25,000,000
North Carolina................................. Fort Liberty.................................. $193,500,000
Pennsylvania................................... Letterkenny Army Depot........................ $89,000,000
South Carolina................................. Fort Jackson.................................. $41,000,000
Texas.......................................... Fort Bliss.................................... $74,000,000
Red River Army Depot.......................... $113,000,000
Virginia....................................... Fort Belvoir.................................. $40,000,000
Joint Base Myer - Henderson Hall.............. $177,000,000
Washington..................................... Joint Base Lewis - McChord.................... $100,000,000
----------------------------------------------------------------------------------------------------------------
(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:
Army: Outside the United States
----------------------------------------------------------------------------------------------------------------
Country Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
Germany........................................ Grafenwoehr................................... $10,400,000
Hohenfels..................................... $56,000,000
Pulaski Barracks.............................. $25,000,000
----------------------------------------------------------------------------------------------------------------
(c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Army may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code:
Army Prototype Project
----------------------------------------------------------------------------------------------------------------
State Installation Amount
----------------------------------------------------------------------------------------------------------------
North Carolina................................. Fort Liberty.................................. $85,000,000
----------------------------------------------------------------------------------------------------------------
SEC. 2102. FAMILY HOUSING.
(a) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may construct or acquire family housing units (including land acquisition and supporting facilities) at the installations or locations, in the number of units, and in the amounts set forth in the following table:
Army: Family Housing
----------------------------------------------------------------------------------------------------------------
Country Installation or Location Units Amount
----------------------------------------------------------------------------------------------------------------
Germany................................ Baumholder................. Family Housing New $78,746,000
Construction............
Kwajalein.............................. Kwajalein Atoll............ Family Housing $98,600,000
Replacement Construction
----------------------------------------------------------------------------------------------------------------
(b) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may improve existing military family housing units in an amount not to exceed
$100,000,000.
(c) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2103(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Army may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $27,549,000.
SEC. 2103. AUTHORIZATION OF APPROPRIATIONS, ARMY.
(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Army as specified in the funding table in section 4601.
(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2101 of this Act may not exceed the total amount authorized to be appropriated under subsection
(a), as specified in the funding table in section 4601.
SEC. 2104. EXTENSION OF AUTHORITY TO USE CASH PAYMENTS IN
SPECIAL ACCOUNT FROM LAND CONVEYANCE, NATICK
SOLDIER SYSTEMS CENTER, MASSACHUSETTS.
Section 2844(c)(2)(C) of the Military Construction Authorization Act for Fiscal Year 2018 (division B of Public Law 115-91; 131 Stat. 1865) is amended by striking ``October 1, 2025'' and inserting ``October 1, 2027''.
SEC. 2105. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR
2018 PROJECT AT KUNSAN AIR BASE, KOREA.
(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018
(division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in subsection (b), as provided in section 2101(b) of that Act (131 Stat. 1819) and extended and modified by subsections (a) and (b) of section 2106 of the Military Construction Act for Fiscal Year 2023
(division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(b) Table.--The table referred to in subsection (a) is as follows:
Army: Extension of 2018 Project Authorization
----------------------------------------------------------------------------------------------------------------
Original
Country Installation or Location Project Authorized Amount
----------------------------------------------------------------------------------------------------------------
Korea................................. Kunsan Air Base........... Unmanned Aerial Vehicle $53,000,000
Hangar..................
----------------------------------------------------------------------------------------------------------------
SEC. 2106. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2019 PROJECTS.
(a) Army Construction and Land Acquisition.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2101 of that Act (132 Stat. 2241), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Army: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
State/Country Installation or Location Project Authorized Amount
----------------------------------------------------------------------------------------------------------------
Korea................................. Camp Tango................ Command and Control $17,500,000
Facility................
Maryland.............................. Fort Meade................ Cantonment Area Roads.... $16,500,000
----------------------------------------------------------------------------------------------------------------
(b) Overseas Contingency Operations.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2901 of that Act (132 Stat. 2286), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Army: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
Country Installation or Location Project Authorized Amount
----------------------------------------------------------------------------------------------------------------
Bulgaria.............................. Nevo Selo FOS............. EDI: Ammunition Holding $5,200,000
Area....................
Romania............................... Mihail Kogalniceanu FOS... EDI: Explosives & Ammo $21,651,000
Load/Unload Apron.......
----------------------------------------------------------------------------------------------------------------
SEC. 2107. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2021 PROJECTS.
(a) Army Construction and Land Acquisition.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2101(a) of that Act (134 Stat. 4295), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Army: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
State Installation or Location Project Authorized Amount
----------------------------------------------------------------------------------------------------------------
Arizona............................... Yuma Proving Ground....... Ready Building........... $14,000,000
Georgia............................... Fort Gillem............... Forensic Lab............. $71,000,000
Louisiana............................. Fort Johnson.............. Information Systems $25,000,000
Facility................
----------------------------------------------------------------------------------------------------------------
(b) Child Development Center, Georgia.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorization under section 2865 of that Act (10 U.S.C. 2802 note) for the project described in paragraph (2) in Fort Eisenhower, Georgia, shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Project described.--The project described in this paragraph is the following:
Army: Extension of 2021 Project Authorization
----------------------------------------------------------------------------------------------------------------
Original
State Installation or Location Project Authorized Amount
----------------------------------------------------------------------------------------------------------------
Georgia............................... Fort Eisenhower........... Child Development Center. $21,000,000
----------------------------------------------------------------------------------------------------------------
TITLE XXII--NAVY MILITARY CONSTRUCTION
SEC. 2201. AUTHORIZED NAVY CONSTRUCTION AND LAND ACQUISITION
PROJECTS.
(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:
Navy: Inside the United States
----------------------------------------------------------------------------------------------------------------
State Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
California.................................. Marine Corps Air Ground Combat Center Twentynine $42,100,000
Palms...........................................
Marine Corps Base Camp Pendleton................. $26,825,000
Port Hueneme..................................... $110,000,000
Connecticut................................. Naval Submarine Base New London.................. $331,718,000
District of Columbia........................ Marine Barracks Washington....................... $131,800,000
Florida..................................... Naval Air Station Whiting Field.................. $141,500,000
Georgia..................................... Marine Corps Logistics Base Albany............... $63,970,000
Guam........................................ Andersen Air Force Base.......................... $497,620,000
Joint Region Marianas............................ $174,540,000
Naval Base Guam.................................. $946,500,000
Hawaii...................................... Marine Corps Base Kaneohe Bay.................... $227,350,000
Maryland.................................... Fort Meade....................................... $186,480,000
Naval Air Station Patuxent River................. $141,700,000
North Carolina.............................. Marine Corps Air Station Cherry Point............ $270,150,000
Marine Corps Base Camp Lejeune................... $215,670,000
Pennsylvania................................ Naval Surface Warfare Center Philadelphia........ $88,200,000
Virginia.................................... Dam Neck Annex................................... $109,680,000
Joint Expeditionary Base Little Creek - Fort $35,000,000
Story.
Marine Corps Base Quantico....................... $127,120,000
Naval Station Norfolk............................ $158,095,000
Naval Weapons Station Yorktown................... $221,920,000
Washington.................................. Naval Base Kitsap................................ $245,000,000
----------------------------------------------------------------------------------------------------------------
(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:
Navy: Outside the United States
----------------------------------------------------------------------------------------------------------------
Country Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
Djibouti.................................... Camp Lemonnier................................... $106,600,000
Italy....................................... Naval Air Station Sigonella...................... $77,072,000
----------------------------------------------------------------------------------------------------------------
(c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Navy may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code:
Navy Prototype Project
----------------------------------------------------------------------------------------------------------------
State Installation Amount
----------------------------------------------------------------------------------------------------------------
Virginia.................................... Joint Expeditionary Base Little Creek - Fort $35,000,000
Story...........................................
----------------------------------------------------------------------------------------------------------------
SEC. 2202. FAMILY HOUSING.
(a) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may construct or acquire family housing units (including land acquisition and supporting facilities) at the installations or locations, in the number of units, and in the amounts set forth in the following table:
Navy: Family Housing
----------------------------------------------------------------------------------------------------------------
Installation or
Country Location Units Amount
----------------------------------------------------------------------------------------------------------------
Guam................................. Joint Region Marianas.. Replace Andersen $121,906,000
Housing Ph 8..........
Mariana Islands........ Replace Andersen $83,126,000
Housing (AF) PH7.
----------------------------------------------------------------------------------------------------------------
(b) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may improve existing military family housing units in an amount not to exceed
$57,740,000.
(c) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2203(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Navy may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $14,370,000.
SEC. 2203. AUTHORIZATION OF APPROPRIATIONS, NAVY.
(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Navy, as specified in the funding table in section 4601.
(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2201 of this Act may not exceed the total amount authorized to be appropriated under subsection
(a), as specified in the funding table in section 4601.
SEC. 2204. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2019 PROJECTS.
(a) Navy Construction and Land Acquisition Projects.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2201 of that Act (132 Stat. 2243), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Navy: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
State/Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
Bahrain.............................. SW Asia................ Fleet Maintenance $26,340,000
Facility & TOC.
North Carolina....................... Marine Corps Base Camp 2nd Radio BN Complex, $51,300,000
Lejeune. Phase 2.
South Carolina....................... Marine Corps Air Recycling/Hazardous $9,517,000
Station Beaufort. Waste Facility.
Washington........................... Bangor................. Pier and Maintenance $88,960,000
Facility.
----------------------------------------------------------------------------------------------------------------
(b) Laurel Bay Fire Station, South Carolina.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorization under section 2810 of that Act (132 Stat. 2266) for the project described in paragraph (2) shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Project described.--The project described in this paragraph is the following::
Navy: Extension of 2019 Project Authorization
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
State Location Project Amount
----------------------------------------------------------------------------------------------------------------
South Carolina....................... Marine Corps Air Laurel Bay Fire Station $10,750,000
Station Beaufort.
----------------------------------------------------------------------------------------------------------------
(c) Overseas Contingency Operations.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorization set forth in the table in paragraph (2), as provided in section 2902 of that Act (132 Stat. 2286), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Navy: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
Greece............................... Naval Support Activity EDI: Joint Mobility $41,650,000
Souda Bay. Processing Center.
----------------------------------------------------------------------------------------------------------------
SEC. 2205. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2021 PROJECTS.
(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in subsection (b), as provided in section 2201 of that Act (134 Stat. 4297), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(b) Table.--The table referred to in subsection (a) is as follows:
Navy: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
State/Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
California........................... Twentynine Palms....... Wastewater Treatment $76,500,000
Plant.
Guam................................. Joint Region Marianas.. Joint Communication $166,000,000
Upgrade.
Maine................................ NCTAMS LANT Detachment Perimeter Security..... $26,100,000
Cutler.
Nevada............................... Fallon................. Range Training Complex, $29,040,000
Phase I.
----------------------------------------------------------------------------------------------------------------
TITLE XXIII--AIR FORCE MILITARY CONSTRUCTION
SEC. 2301. AUTHORIZED AIR FORCE CONSTRUCTION AND LAND
ACQUISITION PROJECTS.
(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:
Air Force: Inside the United States
----------------------------------------------------------------------------------------------------------------
State Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
District of Columbia.......................... Joint Base Anacostia - Bolling.................. $50,000,000
Florida....................................... MacDill Air Force Base.......................... $131,000,000
Patrick Space Force Base........................ $27,000,000
Tyndall Air Force Base.......................... $252,000,000
Georgia....................................... Robins Air Force Base........................... $115,000,000
Guam.......................................... Joint Region Marianas........................... $411,000,000
Massachusetts................................. Hanscom Air Force Base.......................... $37,000,000
Mississippi................................... Columbus Air Force Base......................... $39,500,000
Montana....................................... Malmstrom Air Force Base........................ $10,300,000
South Dakota.................................. Ellsworth Air Force Base........................ $235,000,000
Texas......................................... Joint Base San Antonio - Lackland............... $314,000,000
Utah.......................................... Hill Air Force Base............................. $488,000,000
Wyoming....................................... F.E. Warren Air Force Base...................... $85,000,000
----------------------------------------------------------------------------------------------------------------
(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:
Air Force: Outside the United States
----------------------------------------------------------------------------------------------------------------
Country Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
Australia..................................... Royal Australian Air Force Base Darwin.......... $26,000,000
Royal Australian Air Force Base Tindal.......... $130,500,000
Norway........................................ Rygge Air Station............................... $119,000,000
Philippines................................... Cesar Basa Air Base............................. $35,000,000
Spain......................................... Moron Air Base.................................. $26,000,000
United Kingdom................................ Royal Air Force Fairford........................ $47,000,000
Royal Air Force Lakenheath...................... $78,000,000
----------------------------------------------------------------------------------------------------------------
(c) Prototype Project.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military construction projects as specified in the funding table in section 4601, the Secretary of the Air Force may carry out a military construction project for the installation, and in the amount, set forth in the following table as a prototype project under the pilot program under section 4022(i) of title 10, United States Code, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code:
Air Force Prototype Project
----------------------------------------------------------------------------------------------------------------
State Installation Amount
----------------------------------------------------------------------------------------------------------------
Massachusetts................................. Hanscom Air Force Base.......................... $37,000,000
----------------------------------------------------------------------------------------------------------------
SEC. 2302. FAMILY HOUSING.
(a) Improvements to Military Family Housing Units.--Subject to section 2825 of title 10, United States Code, and using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may improve existing military family housing units in an amount not to exceed $249,928,200.
(b) Planning and Design.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may carry out architectural and engineering services and construction design activities with respect to the construction or improvement of family housing units in an amount not to exceed $7,815,000.
(c) Construction and Acquisition.--Using amounts appropriated pursuant to the authorization of appropriations in section 2303(a) and available for military family housing functions as specified in the funding table in section 4601, the Secretary of the Air Force may construct or acquire family housing units (including land acquisition and supporting facilities) at the installation and in the amount set forth in the following table:
Air Force: Family Housing
----------------------------------------------------------------------------------------------------------------
Country Installation Amount
----------------------------------------------------------------------------------------------------------------
Japan......................................... Yokota Air Base................................. $27,000,000
----------------------------------------------------------------------------------------------------------------
SEC. 2303. AUTHORIZATION OF APPROPRIATIONS, AIR FORCE.
(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of the Air Force, as specified in the funding table in section 4601.
(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2301 of this Act may not exceed the total amount authorized to be appropriated under subsection
(a), as specified in the funding table in section 4601.
SEC. 2304. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2017 PROJECTS.
(a) Air Force Construction and Land Acquisition Projects.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2017
(division B of Public Law 114-328; 130 Stat. 2688), the authorizations set forth in the table in paragraph (2), as provided in section 2301(b) of that Act (130 Stat. 2697) and extended by section 2304 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117-181; 135 Stat. 2169), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2017 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
Country Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Germany............................... Ramstein Air Base......... 37 AS Squadron Operations/ $13,437,000
Aircraft Maintenance
Unit....................
Spangdahlem Air Base...... Upgrade Hardened Aircraft $2,700,000
Shelters for F/A-22.....
Japan................................. Yokota Air Force Base..... C-130J Corrosion Control $23,777,000
Hangar..................
----------------------------------------------------------------------------------------------------------------
(b) Overseas Contingency Operations.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2017
(division B of Public Law 114-328; 130 Stat. 2688), the authorization set forth in the table in paragraph (2), as provided in section 2902 of that Act (130 Stat. 2743) and extended by section 2304 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117-181; 135 Stat. 2169), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2017 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
Country Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Germany............................... Spangdahlem Air Base...... F/A-22 Low Observable/ $12,000,000
Composite Repair
Facility................
----------------------------------------------------------------------------------------------------------------
SEC. 2305. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2018 PROJECTS.
(a) Air Force Construction and Land Acquisition Projects.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018
(division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in paragraph (2), as provided in section 2301(a) of that Act (131 Stat. 1825) and extended by section 2304(a) of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2018 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
State Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Florida............................... Tyndall Air Force Base.... Fire Station............. $17,000,000
----------------------------------------------------------------------------------------------------------------
(b) Overseas Contingency Operations.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018
(division B of Public Law 115-91; 131 Stat. 1817), the authorizations set forth in the table in paragraph (2), as provided in section 2903 of that Act (131 Stat. 1876) and extended by section 2304(b) of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2018 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
Country Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Hungary............................... Kecskemet Air Base........ ERI: Airfield Upgrades... $12,900,000
Kecskemet Air Base........ ERI: Construct Parallel $30,000,000
Taxiway.................
Kecskemet Air Base........ ERI: Increase POL Storage $12,500,000
Capacity................
Luxembourg............................ Sanem..................... ERI: ECAOS Deployable $67,400,000
Airbase System Storage..
Slovakia.............................. Malacky................... ERI: Airfield Upgrades... $4,000,000
Malacky................... ERI: Increase POL Storage $20,000,000
Capacity................
----------------------------------------------------------------------------------------------------------------
SEC. 2306. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2019 PROJECTS.
(a) Air Force Construction and Land Acquisition Projects.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2301 of that Act (132 Stat. 2246), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
State/Country Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Mariana Islands....................... Tinian.................... APR-Cargo Pad with $46,000,000
Taxiway Extension.......
Tinian.................... APR-Maintenance Support $4,700,000
Facility................
Maryland.............................. Joint Base Andrews........ Child Development Center. $13,000,000
Joint Base Andrews........ PAR Relocate Haz Cargo $37,000,000
Pad and EOD Range.......
New Mexico............................ Holloman Air Force Base... MQ-9 FTU Ops Facility.... $85,000,000
Kirtland Air Force Base... Wyoming Gate Upgrade for $7,000,000
Anti-Terrorism
Compliance..............
United Kingdom........................ Royal Air Force Lakenheath F-35 ADAL Conventional $9,204,000
Munitions MX............
Utah.................................. Hill Air Force Base....... Composite Aircraft $26,000,000
Antenna Calibration Fac.
----------------------------------------------------------------------------------------------------------------
(b) Overseas Contingency Operations.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2903 of that Act (132 Stat. 2287), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
Country Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Slovakia.............................. Malacky................... EDI: Regional Munitions $59,000,000
Storage Area............
United Kingdom........................ RAF Fairford.............. EDI: Construct DABS-FEV $87,000,000
Storage.................
RAF Fairford.............. EDI: Munitions Holding $19,000,000
Area....................
----------------------------------------------------------------------------------------------------------------
SEC. 2307. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2021 PROJECTS.
(a) Air Force Construction and Land Acquisition Project.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorization set forth in the table in paragraph (2), as provided in section 2301 of that Act (134 Stat. 4299), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2021 Project Authorization
----------------------------------------------------------------------------------------------------------------
Original
State Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Virginia.............................. Joint Base Langley - Access Control Point Main $19,500,00
Eustis................... Gate with Lang Acq......
----------------------------------------------------------------------------------------------------------------
(b) Overseas Contingency Operations.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2902 of that Act (134 Stat. 4373), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Air Force: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Original
Country Installation or Location Project Authorized
Amount
----------------------------------------------------------------------------------------------------------------
Germany............................... Ramstein.................. EDI: Rapid Airfield $36,345,000
Damage Repair Storage...
Spangdahlem Air Base...... EDI: Rapid Airfield $25,824,000
Damage Repair Storage...
----------------------------------------------------------------------------------------------------------------
TITLE XXIV--DEFENSE AGENCIES MILITARY CONSTRUCTION
SEC. 2401. AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND
ACQUISITION PROJECTS.
(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for military construction projects inside the United States as specified in the funding table in section 4601, the Secretary of Defense may acquire real property and carry out military construction projects for the installations or locations inside the United States, and in the amounts, set forth in the following table:
Defense Agencies: Inside the United States
----------------------------------------------------------------------------------------------------------------
State Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
Alabama..................................... Redstone Arsenal.............................. $147,975,000
California.................................. Marine Corps Air Station Miramar.............. $103,000,000
Naval Base Coronado........................... $51,000,000
Naval Base San Diego.......................... $101,644,000
Delaware.................................... Dover Air Force Base.......................... $30,500,000
Maryland.................................... Fort Meade.................................... $885,000,000
Joint Base Andrews............................ $38,300,000
Montana..................................... Great Falls International Airport............. $30,000,000
North Carolina.............................. Marine Corps Base Camp Lejeune................ $70,000,000
Utah........................................ Hill Air Force Base........................... $14,200,000
Virginia.................................... Fort Belvoir.................................. $185,000,000
Joint Expeditionary Base Little Creek - Fort $61,000,000
Story.
Pentagon...................................... $30,600,000
Washington.................................. Joint Base Lewis - McChord.................... $62,000,000
Manchester.................................... $71,000,000
Naval Undersea Warfare Center Keyport......... $37,000,000
----------------------------------------------------------------------------------------------------------------
(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for military construction projects outside the United States as specified in the funding table in section 4601, the Secretary of Defense may acquire real property and carry out military construction projects for the installations or locations outside the United States, and in the amounts, set forth in the following table:
Defense Agencies: Outside the United States
----------------------------------------------------------------------------------------------------------------
Country Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
Cuba......................................... Guantanamo Bay Naval Station.................. $257,000,000
Germany...................................... Baumholder.................................... $57,700,000
Ramstein Air Base............................. $181,764,000
Honduras..................................... Soto Cano Air Base............................ $41,300,000
Japan........................................ Kadena Air Base............................... $100,300,000
Spain........................................ Naval Station Rota............................ $80,000,000
----------------------------------------------------------------------------------------------------------------
SEC. 2402. AUTHORIZED ENERGY RESILIENCE AND CONSERVATION
INVESTMENT PROGRAM PROJECTS.
(a) Inside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for energy conservation projects as specified in the funding table in section 4601, the Secretary of Defense may carry out energy conservation projects under chapter 173 of title 10, United States Code, for the installations or locations inside the United States, and in the amounts, set forth in the following table:
ERCIP Projects: Inside the United States
----------------------------------------------------------------------------------------------------------------
State Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
California.................................. Marine Corps Air Station Miramar.............. $30,550,000
Mountain View................................. $15,500,000
Naval Base San Diego.......................... $6,300,000
Vandenberg Space Force Base................... $57,000,000
Colorado.................................... Buckley Space Force Base...................... $14,700,000
Florida..................................... Naval Air Station Whiting Field............... $31,220,000
Georgia..................................... Naval Submarine Base Kings Bay................ $49,500,000
Kansas...................................... Forbes Field.................................. $5,850,000
Missouri.................................... Lake City Army Ammunition Plant............... $80,100,000
Nebraska.................................... Offutt Air Force Base......................... $41,000,000
New Jersey.................................. Sea Girt...................................... $44,000,000
North Carolina.............................. Fort Liberty (Camp Mackall)................... $10,500,000
Oklahoma.................................... Fort Sill..................................... $76,650,000
Puerto Rico................................. Fort Buchanan................................. $56,000,000
Texas....................................... Fort Cavazos.................................. $50,250,000
Utah........................................ Camp Williams................................. $20,100,000
Virginia.................................... Pentagon...................................... $2,250,000
Washington.................................. Joint Base Lewis - McChord.................... $49,850,000
Naval Base Kitsap............................. $31,520,000
Naval Magazine Indian Island.................. $37,770,000
Wyoming..................................... F.E. Warren Air Force Base.................... $25,000,000
----------------------------------------------------------------------------------------------------------------
(b) Outside the United States.--Using amounts appropriated pursuant to the authorization of appropriations in section 2403(a) and available for energy conservation projects as specified in the funding table in section 4601, the Secretary of Defense may carry out energy conservation projects under chapter 173 of title 10, United States Code, for the installations or locations outside the United States, and in the amounts, set forth in the following table:
ERCIP Projects: Outside the United States
----------------------------------------------------------------------------------------------------------------
Country Installation or Location Amount
----------------------------------------------------------------------------------------------------------------
Diego Garcia................................. Naval Support Facility Diego Garcia........... $16,820,000
Korea........................................ K-16 Air Base................................. $5,650,000
Kuwait....................................... Camp Buehring................................. $18,850,000
----------------------------------------------------------------------------------------------------------------
(c) Improvement of Conveyed Utility Systems.--In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table:
Improvement of Conveyed Utility Systems
----------------------------------------------------------------------------------------------------------------
State Installation or Location Project
----------------------------------------------------------------------------------------------------------------
Nebraska..................................... Offutt Air Force Base......................... Microgrid and
Backup Power
North Carolina............................... Fort Liberty (Camp Mackall)................... Microgrid and
Backup Power
Texas........................................ Fort Cavazos.................................. Microgrid and
Backup Power
Washington................................... Joint Base Lewis - McChord.................... Power Generation
and Microgrid
----------------------------------------------------------------------------------------------------------------
SEC. 2403. AUTHORIZATION OF APPROPRIATIONS, DEFENSE AGENCIES.
(a) Authorization of Appropriations.--Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for military construction, land acquisition, and military family housing functions of the Department of Defense (other than the military departments), as specified in the funding table in section 4601.
(b) Limitation on Total Cost of Construction Projects.-- Notwithstanding the cost variations authorized by section 2853 of title 10, United States Code, and any other cost variation authorized by law, the total cost of all projects carried out under section 2401 of this Act may not exceed the total amount authorized to be appropriated under subsection
(a), as specified in the funding table in section 4601.
SEC. 2404. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2018 PROJECTS.
(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018
(division B of Public Law 115-91; 131 Stat. 1817), the authorizations set forth in the table in subsection (b), as provided in section 2401(b) of that Act (131 Stat. 1829) and extended by section 2404 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(b) Table.--The table referred to in subsection (a) is as follows:
Defense Agencies: Extension of 2018 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
Japan................................ Iwakuni................ Construct Bulk Storage $30,800,000
Tanks PH 1............
Puerto Rico.......................... Punta Borinquen........ Ramey Unit School $61,071,000
Replacement...........
----------------------------------------------------------------------------------------------------------------
SEC. 2405. EXTENSION AND MODIFICATION OF AUTHORITY TO CARRY
OUT CERTAIN FISCAL YEAR 2019 PROJECTS.
(a) Extension.--
(1) In general.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorizations set forth in the table in paragraph (2), as provided in section 2401(b) of that Act (132 Stat. 2249), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Defense Agencies: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
Germany.............................. Baumholder............. SOF Joint Parachute $11,504,000
Rigging Facility......
Japan................................ Camp McTureous......... Betchel Elementary $94,851,000
School................
Iwakuni................ Fuel Pier............. $33,200,000
----------------------------------------------------------------------------------------------------------------
(b) Modification of Authority to Carry Out Fiscal Year 2019 Project in Baumholder, Germany.--
(1) Modification of project authority.--In the case of the authorization contained in the table in section 2401(b) of the Military Construction Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2249) for Baumholder, Germany, for construction of a SOF Joint Parachute Rigging Facility, the Secretary of Defense may construct a 3,200 square meter facility.
(2) Modification of project amounts.--
(A) Division b table.--The authorization table in section 2401(b) of the Military Construction Defense Authorization Act for Fiscal Year 2019 (division B of Public Law 115-232; 132 Stat. 2249), as extended pursuant to subsection (a), is amended in the item relating to Baumholder, Germany, by striking ``$11,504,000'' and inserting ``$23,000,000'' to reflect the project modification made by paragraph (1).
(B) Division d table.--The funding table in section 4601 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Public Law 115-232; 132 Stat. 2406) is amended in the item relating to Defense-wide, Baumholder, Germany, SOF Joint Parachute Rigging Facility, by striking
``$11,504'' in the Conference Authorized column and inserting
``$23,000'' to reflect the project modification made by paragraph (1).
SEC. 2406. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2021 PROJECTS.
(a) Defense Agencies Construction and Land Acquisition Project.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorization set forth in the table in paragraph (2), as provided in section 2401(b) of that Act (134 Stat. 4305), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in paragraph (1) is as follows:
Defense Agencies: Extension of 2021 Project Authorization
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
Japan................................ Def Fuel Support Point Fuel Wharf............. $49,500,000
Tsurumi...............
----------------------------------------------------------------------------------------------------------------
(b) Energy Resilience and Conservation Investment Program Projects.--
(1) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in paragraph (2), as provided in section 2402 of that Act (134 Stat. 4306), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(2) Table.--The table referred to in subsection (a) is as follows:
ERCIP Projects: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
State/Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
Arkansas............................. Ebbing Air National PV Arrays and Battery $2,600,000
Guard Base............ Storage...............
California........................... Marine Corps Air Ground Install 10 Mw Battery $11,646,000
Combat Center Energy Storage for
Twentynine Palms...... Various Buildings.....
Military Ocean Terminal Military Ocean Terminal $29,000,000
Concord............... Concord Microgrid.....
Naval Support Activity Cogeneration Plant at $10,540,000
Monterey.............. B236..................
Italy................................ Naval Support Activity Smart Grid............. $3,490,000
Naples................
Nevada............................... Creech Air Force Base.. Central Standby $32,000,000
Generators............
Virginia............................. Naval Medical Center Retro Air Handling $611,000
Portsmouth............ Units From Constant
Volume; Reheat to
Variable Air Volume...
----------------------------------------------------------------------------------------------------------------
SEC. 2407. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2022 PROJECTS.
In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table:
Improvement of Conveyed Utility Systems
----------------------------------------------------------------------------------------------------------------
State Installation or Location Project
----------------------------------------------------------------------------------------------------------------
Alabama...................................... Fort Novosel.................................. Construct a 10 MW
RICE Generator
Plant and Micro-
Grid Controls
Georgia...................................... Fort Moore.................................... Construct 4.8MW
Generation and
Microgrid
Fort Stewart................................. Construct a 10 MW
Generation Plant,
with Microgrid
Controls
New York..................................... Fort Drum..................................... Well Field
Expansion Project
North Carolina............................... Fort Liberty.................................. Construct 10 MW
Microgrid
Utilizing
Existing and New
Generators
Fort Liberty.................................. Fort Liberty
Emergency Water
System
----------------------------------------------------------------------------------------------------------------
SEC. 2408. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2023 PROJECTS.
In the case of a utility system that is conveyed under section 2688 of title 10, United States Code, and that only provides utility services to a military installation, notwithstanding subchapters I and III of chapter 169 and chapters 221 and 223 of title 10, United States Code, the Secretary of Defense or the Secretary of a military department may authorize a contract with the conveyee of the utility system to carry out the military construction projects set forth in the following table:
Improvement of Conveyed Utility Systems
----------------------------------------------------------------------------------------------------------------
State Installation or Location Project
----------------------------------------------------------------------------------------------------------------
Georgia...................................... Fort Stewart - Hunter Army Airfield........... Power Generation
and Microgrid
Kansas....................................... Fort Riley.................................... Power Generation
and Microgrid
Texas........................................ Fort Cavazos.................................. Power Generation
and Microgrid
----------------------------------------------------------------------------------------------------------------
TITLE XXVI--GUARD AND RESERVE FORCES FACILITIES
SEC. 2601. AUTHORIZED ARMY NATIONAL GUARD CONSTRUCTION AND
LAND ACQUISITION PROJECTS.
Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the Army National Guard locations inside the United States, and in the amounts, set forth in the following table:
Army National Guard
----------------------------------------------------------------------------------------------------------------
State Location Amount
----------------------------------------------------------------------------------------------------------------
Arizona..................................... Surprise Readiness Center........................ $15,000,000
Florida..................................... Camp Blanding.................................... $11,000,000
Idaho....................................... Jerome County Regional Site...................... $17,000,000
Illinois.................................... North Riverside Armory........................... $24,000,000
Kentucky Burlington....................................... $16,400,000
Mississippi Southaven........................................ $22,000,000
Missouri.................................... Belle Fontaine................................... $28,000,000
New Hampshire............................... Littleton........................................ $23,000,000
New Mexico.................................. Rio Rancho Training Site......................... $11,000,000
New York.................................... Lexington Avenue Armory.......................... $90,000,000
Ohio........................................ Camp Perry Joint Training Center................. $19,200,000
Oregon Washington County Readiness Center............... $26,000,000
Pennsylvania................................ Hermitage Readiness Center....................... $13,600,000
Rhode Island................................ North Kingstown.................................. $30,000,000
South Carolina.............................. Aiken County Readiness Center.................... $20,000,000
McCrady Training Center.......................... $7,900,000
Virginia.................................... Sandston RC & FMS 1.............................. $20,000,000
Wisconsin................................... Viroqua.......................................... $18,200,000
----------------------------------------------------------------------------------------------------------------
SEC. 2602. AUTHORIZED ARMY RESERVE CONSTRUCTION AND LAND
ACQUISITION PROJECTS.
Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Army may acquire real property and carry out military construction projects for the Army Reserve locations inside the United States, and in the amounts, set forth in the following table:
Army Reserve
----------------------------------------------------------------------------------------------------------------
State Location Amount
----------------------------------------------------------------------------------------------------------------
Alabama..................................... Birmingham....................................... $57,000,000
Arizona..................................... San Tan Valley................................... $12,000,000
California.................................. Fort Hunter Liggett.............................. $40,000,000
Parks Reserve Forces Training Area............... $35,000,000
Georgia..................................... Marine Corps Logistics Base Albany.............. $40,000,000
Massachusetts............................... Devens Reserve Forces Training Area............. $39,000,000
Puerto Rico................................. Fort Buchanan.................................... $39,000,000
----------------------------------------------------------------------------------------------------------------
SEC. 2603. AUTHORIZED NAVY RESERVE AND MARINE CORPS RESERVE
CONSTRUCTION AND LAND ACQUISITION PROJECTS.
Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Navy may acquire real property and carry out military construction projects for the Navy Reserve and Marine Corps Reserve locations inside the United States, and in the amounts, set forth in the following table:
Navy Reserve and Marine Corps Reserve
----------------------------------------------------------------------------------------------------------------
State Location Amount
----------------------------------------------------------------------------------------------------------------
Michigan.................................... Battle Creek..................................... $24,549,000
Virginia.................................... Marine Forces Reserve Dam Neck Virginia Beach.... $12,400,000
----------------------------------------------------------------------------------------------------------------
SEC. 2604. AUTHORIZED AIR NATIONAL GUARD CONSTRUCTION AND
LAND ACQUISITION PROJECTS.
Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the Air National Guard locations inside the United States, and in the amounts, set forth in the following table:
Air National Guard
----------------------------------------------------------------------------------------------------------------
State Location Amount
----------------------------------------------------------------------------------------------------------------
Alabama..................................... Montgomery Regional Airport...................... $7,000,000
Alaska...................................... Joint Base Elmendorf - Richardson................ $7,000,000
Arizona..................................... Tucson International Airport..................... $11,600,000
Arkansas.................................... Ebbing Air National Guard Base................... $76,000,000
Colorado.................................... Buckley Space Force Base......................... $12,000,000
Georgia..................................... Savannah/Hilton Head International Airport....... $27,000,000
Indiana..................................... Fort Wayne International Airport................. $8,900,000
Oregon...................................... Portland International Airport................... $71,500,000
Pennsylvania................................ Harrisburg International Airport................. $8,000,000
Wisconsin................................... Truax Field...................................... $5,200,000
----------------------------------------------------------------------------------------------------------------
SEC. 2605. AUTHORIZED AIR FORCE RESERVE CONSTRUCTION AND LAND
ACQUISITION PROJECTS.
Using amounts appropriated pursuant to the authorization of appropriations in section 2606 and available for the National Guard and Reserve as specified in the funding table in section 4601, the Secretary of the Air Force may acquire real property and carry out military construction projects for the Air Force Reserve locations inside the United States, and in the amounts, set forth in the following table:
Air Force Reserve
----------------------------------------------------------------------------------------------------------------
State Location Amount
----------------------------------------------------------------------------------------------------------------
Arizona..................................... Davis - Monthan Air Force Base................... $8,500,000
California.................................. March Air Reserve Base........................... $226,500,000
Guam........................................ Joint Region Marianas............................ $27,000,000
Louisiana................................... Barksdale Air Force Base......................... $7,000,000
Texas....................................... Naval Air Station Joint Reserve Base Fort Worth.. $16,000,000
----------------------------------------------------------------------------------------------------------------
SEC. 2606. AUTHORIZATION OF APPROPRIATIONS, NATIONAL GUARD
AND RESERVE.
Funds are hereby authorized to be appropriated for fiscal years beginning after September 30, 2023, for the costs of acquisition, architectural and engineering services, and construction of facilities for the Guard and Reserve Forces, and for contributions therefor, under chapter 1803 of title 10, United States Code (including the cost of acquisition of land for those facilities), as specified in the funding table in section 4601.
SEC. 2607. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR
2018 PROJECT AT HULMAN REGIONAL AIRPORT,
INDIANA.
(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2018
(division B of Public Law 115-91; 131 Stat. 1817), the authorization set forth in the table in subsection (b), as provided in section 2604 of that Act (131 Stat. 1836) and extended by section 2608 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(b) Table.--The table referred to in subsection (a) is as follows:
National Guard and Reserve: Extension of 2018 Project Authorization
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
State Location Project Amount
----------------------------------------------------------------------------------------------------------------
Indiana.............................. Hulman Regional Airport Construct Small Arms $8,000,000
Range.................
----------------------------------------------------------------------------------------------------------------
SEC. 2608. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR
2019 PROJECT AT FRANCIS S. GABRESKI AIRPORT,
NEW YORK.
(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2019
(division B of Public Law 115-232; 132 Stat. 2240), the authorization set forth in the table in subsection (b), as provided in section 2604 of that Act (132 Stat. 2255), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(b) Table.--The table referred to in subsection (a) is as follows:
National Guard and Reserve: Extension of 2019 Project Authorization
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
State Location Project Amount
----------------------------------------------------------------------------------------------------------------
New York............................. Francis S. Gabreski Security Forces/Comm. $20,000,000
Airport............... Training Facility.....
----------------------------------------------------------------------------------------------------------------
SEC. 2609. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL
YEAR 2021 PROJECTS.
(a) Extension.--Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2021
(division B of Public Law 116-283; 134 Stat. 4294), the authorizations set forth in the table in subsection (b), as provided in sections 2601, 2602, and 2604 of that Act (134 Stat. 4312, 4313, 4314), shall remain in effect until October 1, 2024, or the date of the enactment of an Act authorizing funds for military construction for fiscal year 2025, whichever is later.
(b) Table.--The table referred to in subsection (a) is as follows:
National Guard and Reserve: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
Installation or Original Authorized
State/Country Location Project Amount
----------------------------------------------------------------------------------------------------------------
Arkansas............................. Fort Chaffee........... National Guard $15,000,000
Readiness Center......
California........................... Bakersfield............ National Guard Vehicle $9,300,000
Maintenance Shop......
Colorado............................. Peterson Space Force National Guard $15,000,000
Base.................. Readiness Center......
Guam................................. Joint Region Marianas.. Space Control Facility $20,000,000
#5....................
Ohio................................. Columbus............... National Guard $15,000,000
Readiness Center......
Massachusetts........................ Devens Reserve Forces Automated Multipurpose $8,700,000
Training Area......... Machine Gun Range.....
North Carolina....................... Asheville.............. Army Reserve Center/ $24,000,000
Land..................
Puerto Rico.......................... Fort Allen............. National Guard $37,000,000
Readiness Center......
South Carolina....................... Joint Base Charleston. National Guard $15,000,000
Readiness Center......
Texas................................ Fort Worth............. Aircraft Maintenance $6,000,000
Hangar Addition/Alt...
Joint Base San Antonio. F-16 Mission Training $10,800,000
Center................
Virgin Islands....................... St. Croix.............. Army Aviation Support $28,000,000
Facility (AASF).......
....................... CST Ready Building..... $11,400,000
----------------------------------------------------------------------------------------------------------------
SEC. 2610. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR
2022 PROJECT AT NICKELL MEMORIAL ARMORY,
KANSAS.
(a) Transfer Authority.--From amounts appropriated for
``Military Construction, Army National Guard'' pursuant to the authorization of appropriations in section 2606 and available as specified in the funding table in section 4601 of the National Defense Authorization Act for Fiscal Year 2022 (Public Law 117-81, 135 Stat. 2315), the Secretary of Defense may transfer not more than $420,000 to an appropriation for ``Military Construction, Air National Guard'' for use for studying, planning, designing, and architect and engineer services for a sensitive compartmented information facility project at Nickell Memorial Armory, Kansas.
(b) Merger of Amounts Transferred.--Any amount transferred under subsection (a) shall be merged with and available for the same purposes, and for the same time period, as the
``Military Construction, Air National Guard'' appropriation to which transferred.
(c) Authority.--Using amounts transferred pursuant to subsection (a), the Secretary of the Air Force may carry out study, planning, design, and architect and engineer services activities for a sensitive compartmented information facility project at Nickell Memorial Armory, Kansas.
SEC. 2611. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR
2023 PROJECT AT CAMP PENDLETON, CALIFORNIA.
In the case of the authorization contained in the table in section 2602 of the Military Construction Authorization Act for Fiscal Year 2023 (division B of Public Law 117-263) and specified in the funding table in section 4601 of the James M. Inhofe National Defense Authorization Act for Fiscal Year 2023 (Public Law 117-263) for Camp Pendleton, California, for construction of an Area Maintenance Support Activity, the Secretary of the Army may construct a 15,000 square foot facility.
______
SOURCE: Congressional Record Vol. 169, No. 129
The Congressional Record is a unique source of public documentation. It started in 1873, documenting nearly all the major and minor policies being discussed and debated.
Senators' salaries are historically higher than the median US income.